Free LEED Green Associate Practice Test (LEED v5)

Use this free LEED Green Associate practice test to answer 85 original LEED v5 questions, then open each explanation. This is unofficial practice, not real exam questions or a full-length exam.

LEED Process (15 questions)

Question 1

LEED Process · Application · ID GA5-LP-01

A developer asks which organization will review the project's LEED documentation and decide whether the building earns certification. Which organization performs that third-party review?

  • A. U.S. Green Building Council (USGBC)
  • B. Green Business Certification Inc. (GBCI)
  • C. Prometric
  • D. The local building department
Answer and explanation

Answer: B. Green Business Certification Inc. (GBCI)

GBCI provides third-party verification for both project certification and professional credentials. Keep "who writes LEED" (USGBC) separate from "who verifies it" (GBCI).

  • Why not A: USGBC develops the LEED rating system. Review and certification sit with GBCI.
  • Why not C: Prometric delivers GBCI's credential exams. It doesn't review buildings.
  • Why not D: Building departments enforce codes. LEED is a voluntary program reviewed outside the permit process.

Review topic: USGBC vs. GBCI roles. Source: GBCI homepage; GBCI, LEED Green Associate Candidate Handbook (current LEED v5)

Question 2

LEED Process · Recall · ID GA5-LP-02

A candidate passes the LEED Green Associate exam. Which designation does GBCI's handbook allow them to use?

  • A. LEED GA
  • B. LEED Certified Professional
  • C. LEED Accredited Professional
  • D. LEED Green Associate
Answer and explanation

Answer: D. LEED Green Associate

Once you pass, you can use the title "LEED Green Associate." The handbook specifically says "LEED GA" is not an approved abbreviation.

  • Why not A: The handbook says "LEED GA" is not an approved abbreviation and shouldn't be used.
  • Why not B: Buildings are certified; people earn credentials. This isn't a GBCI title.
  • Why not C: LEED AP is a separate, advanced credential with its own specialty exams.

Review topic: Credential title. Source: GBCI, LEED Green Associate Candidate Handbook (current LEED v5)

Question 3

LEED Process · Recall · ID GA5-LP-03

How does a new version of the LEED rating system become final?

  • A. A consensus committee approves it through a ballot process, and USGBC members ratify it by vote
  • B. GBCI's exam developers write it and release it with the new exam
  • C. The U.S. EPA adopts it as a federal regulation
  • D. Prometric publishes it after each annual exam update
Answer and explanation

Answer: A. A consensus committee approves it through a ballot process, and USGBC members ratify it by vote

GBCI's handbook describes the sequence: a new LEED version is approved by the relevant consensus committee through a ballot process and ratified by a vote of USGBC's membership. That consensus, member-driven process is a core idea in the LEED Process domain.

  • Why not B: Exam development follows a new rating system; it doesn't create one.
  • Why not C: LEED is a voluntary program, not a federal rule.
  • Why not D: Prometric only delivers exams.

Review topic: How LEED is developed. Source: GBCI, LEED Green Associate Candidate Handbook (current LEED v5); USGBC, Foundations of LEED

Question 4

LEED Process · Recall · ID GA5-LP-04

Which statement about LEED prerequisites is correct?

  • A. Prerequisites earn bonus points on top of credits
  • B. A project with enough credit points can skip a prerequisite
  • C. Every applicable prerequisite in the chosen rating system must be met, and prerequisites earn no points
  • D. Prerequisites apply only to projects pursuing Platinum
Answer and explanation

Answer: C. Every applicable prerequisite in the chosen rating system must be met, and prerequisites earn no points

Applicable prerequisites are mandatory and carry no points; points come from credits. That's why the v5 BD+C scorecard lists prerequisites as "Required" rather than giving them point values.

  • Why not A: Points come from credits. Prerequisites are pass/fail requirements.
  • Why not B: Extra points never replace a missed prerequisite.
  • Why not D: Prerequisites apply at every certification level.

Review topic: Prerequisites vs. credits. Source: USGBC, LEED v5 BD+C — Rating-system scorecard and impact areas; USGBC, LEED overview

Question 5

LEED Process · Application · ID GA5-LP-05

A school district wants to certify a 1,800-square-foot trailer-mounted classroom that will remain unanchored, without a permanent foundation, and move between campuses. Which LEED Minimum Program Requirement is the problem?

  • A. Must use reasonable LEED boundaries
  • B. Must comply with project size requirements
  • C. Must earn at least one Project Priorities point
  • D. Must be in a permanent location on existing land
Answer and explanation

Answer: D. Must be in a permanent location on existing land

LEED evaluates projects in the context of their location. This unanchored, trailer-mounted classroom fails the permanent-location requirement. A modular building anchored to a permanent foundation can qualify even if it could later be dismantled; certification does not transfer to a new location.

  • Why not A: Nothing in the scenario suggests the boundary was drawn to gain an advantage.
  • Why not B: At 1,800 square feet, the classroom is above the 1,000-square-foot BD+C minimum.
  • Why not C: Project Priorities points are optional credits, not a Minimum Program Requirement.

Review topic: Minimum Program Requirements. Source: USGBC, Minimum Program Requirements; USGBC, MPR frequently asked questions; USGBC, LEED v5 frequently asked questions

Question 6

LEED Process · Application · ID GA5-LP-06

To make a site credit easier to earn, a team draws the LEED boundary tightly around the building and leaves out a large surface parking lot that the project owns and uses. What's the issue?

  • A. Nothing; project teams can draw the boundary however they like
  • B. The project is no longer in a permanent location
  • C. The boundary unreasonably excludes part of the site to gain a credit advantage
  • D. The project now falls below the minimum floor area
Answer and explanation

Answer: C. The boundary unreasonably excludes part of the site to gain a credit advantage

The v5 "reasonable boundaries" requirement says the boundary may not unreasonably exclude portions of the building, space or site to give the project an advantage in meeting credit requirements. Leaving out a lot the project actually uses is the textbook example.

  • Why not A: The boundary is the team's choice, but it can't be drawn unreasonably to make compliance easier.
  • Why not B: Excluding a parking lot doesn't make the building relocatable.
  • Why not D: Floor area is about the building, not the parking lot.

Review topic: Minimum Program Requirements. Source: USGBC, Minimum Program Requirements

Question 7

LEED Process · Recall · ID GA5-LP-07

Under LEED v5, what's the minimum gross floor area for an ID+C (interior design and construction) project?

  • A. 250 sq ft
  • B. 500 sq ft
  • C. 1,000 sq ft
  • D. 5,000 sq ft
Answer and explanation

Answer: A. 250 sq ft

The size requirement is 1,000 sq ft of gross floor area for BD+C and O+M, and 250 sq ft for ID+C.

  • Why not B: Not a LEED v5 threshold.
  • Why not C: That's the minimum for BD+C and O+M projects, not ID+C.
  • Why not D: Not a LEED v5 minimum program threshold.

Review topic: Minimum Program Requirements. Source: USGBC, Minimum Program Requirements; USGBC, LEED v5 frequently asked questions

Question 8

LEED Process · Application · ID GA5-LP-08

A LEED v5 BD+C project meets every Minimum Program Requirement and prerequisite and earns 52 points. Which certification level does that point total fall in?

  • A. Certified
  • B. Silver
  • C. Gold
  • D. Platinum
Answer and explanation

Answer: B. Silver

The point bands are Certified 40-49, Silver 50-59, Gold 60-79 and Platinum 80 and up, out of 110 possible points. Fifty-two points falls in the Silver band.

  • Why not A: Certified is 40-49 points.
  • Why not C: Gold starts at 60 points.
  • Why not D: Platinum starts at 80 points, and v5 adds credit-specific Platinum requirements.

Review topic: Certification levels. Source: USGBC, LEED overview; USGBC, LEED v5 BD+C — Rating-system scorecard and impact areas

Question 9

LEED Process · Analysis · ID GA5-LP-09

A LEED v5 BD+C: New Construction project has 84 points, but its renewable energy supply falls short of the Platinum requirement written into the Renewable Energy credit. Which statement is accurate?

  • A. Any project with 80 or more points is automatically Platinum
  • B. The renewable shortfall can be covered with extra Project Priorities points
  • C. In v5, reaching 80 points doesn't by itself secure Platinum; some credits carry Platinum requirements
  • D. Platinum requirements apply only to O+M projects
Answer and explanation

Answer: C. In v5, reaching 80 points doesn't by itself secure Platinum; some credits carry Platinum requirements

The v5 BD+C: New Construction Renewable Energy credit states a Platinum requirement: 100% of site energy use from any combination of Tier 1, Tier 2 and Tier 3 renewable energy. So a high point total alone doesn't guarantee the top level. Treat this as a v5 change to watch for in older study material.

  • Why not A: Credit-level Platinum requirements also apply in v5, and all applicable prerequisites must be met at every certification level.
  • Why not B: Points don't substitute for a stated Platinum requirement.
  • Why not D: The Renewable Energy credit in v5 BD+C itself contains a Platinum requirement.

Review topic: v5 Platinum requirements. Source: USGBC, LEED v5 BD+C — Renewable Energy

Question 10

LEED Process · Recall · ID GA5-LP-10

LEED v5 organizes its prerequisites and credits around three impact areas. Which set is correct?

  • A. Energy; water; materials
  • B. Location; site; indoor environment
  • C. People; planet; profit
  • D. Decarbonization; quality of life; ecological conservation and restoration
Answer and explanation

Answer: D. Decarbonization; quality of life; ecological conservation and restoration

LEED v5 groups its requirements under decarbonization, quality of life, and ecological conservation and restoration. The current exam specifications list "impact areas" under the LEED Process domain.

  • Why not A: These are resource topics that map to credit categories, not the v5 impact areas.
  • Why not B: These describe credit categories, not impact areas.
  • Why not C: That's the triple bottom line, a general sustainability idea rather than LEED v5's framework.

Review topic: v5 impact areas. Source: USGBC, LEED v5 BD+C — Rating-system scorecard and impact areas; USGBC, LEED v5; GBCI, LEED Green Associate Candidate Handbook (current LEED v5)

Question 11

LEED Process · Application · ID GA5-LP-11

A LEED v5 BD+C team wants to earn points for a regional priority credit and a pilot credit from USGBC's credit library. Where do those points come from?

  • A. The Innovation and Regional Priority categories
  • B. The Project Priorities credit category
  • C. The Integrative Process, Planning and Assessments category
  • D. Nowhere; v5 removed regional and pilot credits
Answer and explanation

Answer: B. The Project Priorities credit category

In v5 BD+C, the Project Priorities credit (up to 9 points) covers regional priority, project-type, exemplary performance, pilot credits and innovative strategies. Those separate category names belong to v4/v4.1, not to the v5 BD+C scorecard.

  • Why not A: Those were the v4/v4.1 category names. In v5 they're folded into Project Priorities.
  • Why not C: That category holds the assessments and integrative design, not regional or pilot credits.
  • Why not D: v5 still recognizes them, under Project Priorities.

Review topic: Project Priorities. Source: USGBC, LEED v5 BD+C — Project Priorities; USGBC, LEED v5 BD+C — Rating-system scorecard; USGBC, LEED v4.1 BD+C guide (historical)

Question 12

LEED Process · Application · ID GA5-LP-12

A project's sustainability lead holds the LEED Green Associate credential. Does that alone earn the LEED v5 BD+C "LEED AP" point?

  • A. No. At least one principal participant must be a LEED AP with a specialty appropriate for the project
  • B. Yes. Any LEED credential holder qualifies
  • C. Yes, if two Green Associates are on the team
  • D. No. v5 eliminated the LEED AP point
Answer and explanation

Answer: A. No. At least one principal participant must be a LEED AP with a specialty appropriate for the project

The v5 LEED AP credit is worth 1 point and requires at least one principal participant who is a LEED AP with a specialty appropriate for the project. A Green Associate credential doesn't satisfy it.

  • Why not B: The credit asks specifically for a LEED AP with an appropriate specialty.
  • Why not C: The number of Green Associates doesn't matter for this credit.
  • Why not D: v5 keeps it as a 1-point credit under Project Priorities.

Review topic: LEED AP credit. Source: USGBC, LEED v5 BD+C — LEED AP

Question 13

LEED Process · Application · ID GA5-LP-13

A tenant is fitting out one leased floor of an office tower with new finishes, lighting and furniture. No work is planned on the structure, envelope or site. Which LEED v5 rating system family fits best?

  • A. BD+C: New Construction
  • B. O+M (Operations and Maintenance)
  • C. BD+C: Core and Shell
  • D. ID+C (Interior Design and Construction)
Answer and explanation

Answer: D. ID+C (Interior Design and Construction)

Interior fit-outs that don't touch the building's structure, envelope or site belong in ID+C. Matching the project scope to the right family is a core LEED Process skill and is covered by USGBC's rating system selection guidance.

  • Why not A: New Construction covers whole new buildings and major renovations, not a single tenant fit-out.
  • Why not B: O+M certifies how an existing building performs in operation.
  • Why not C: Core and Shell is for the base building when tenant spaces are left for others to finish.

Review topic: Rating system selection. Source: USGBC, LEED Rating System Selection Guidance; USGBC, LEED v5 BD+C — Rating-system scorecard

Question 14

LEED Process · Application · ID GA5-LP-14

The owner of a 15-year-old office building wants to certify how the building currently performs in day-to-day operation. No major construction is planned. Which LEED v5 rating system family fits?

  • A. BD+C: New Construction
  • B. O+M (Operations and Maintenance)
  • C. ID+C (Interior Design and Construction)
  • D. BD+C: Core and Shell
Answer and explanation

Answer: B. O+M (Operations and Maintenance)

O+M certifies existing buildings based on how they operate. The v5 O+M rating system includes performance-based credits such as water efficiency performance and greenhouse gas emissions reduction performance.

  • Why not A: No new construction or major renovation is happening.
  • Why not C: ID+C is for interior fit-outs, not whole-building operations.
  • Why not D: Core and Shell is a design and construction system for new base buildings or qualifying major renovations, not day-to-day operations.

Review topic: Rating system selection. Source: USGBC, LEED Rating System Selection Guidance; USGBC, LEED v5 O+M rating-system scorecard

Question 15

LEED Process · Application · ID GA5-LP-15

A consultant tells your team that a Credit Interpretation Ruling (CIR) issued for another company's project automatically applies to your project too. What's the best response?

  • A. A CIR answers one project's question; only a published LEED Interpretation can apply to other projects, within its stated applicability
  • B. Agreed; every CIR becomes binding precedent for all projects
  • C. LEED Interpretations apply only to the single project that asked for them
  • D. Neither applies; teams may only rely on the original rating system text
Answer and explanation

Answer: A. A CIR answers one project's question; only a published LEED Interpretation can apply to other projects, within its stated applicability

USGBC's certification guidance separates project-specific CIRs from published LEED Interpretations, which can establish precedent within their stated applicability. Either way, the team still has to document compliance.

  • Why not B: CIRs are project-specific rulings.
  • Why not C: That's backwards. Published Interpretations are the ones that can set precedent.
  • Why not D: Published LEED Interpretations and addenda can apply; the original text isn't the only authority.

Review topic: CIRs vs. LEED Interpretations. Source: USGBC, Guide to LEED Certification: Commercial; GBCI, LEED Green Associate Candidate Handbook (current LEED v5)

Integrative Process Planning and Assessments (6 questions)

Question 16

Integrative Process Planning and Assessments · Recall · ID GA5-IP-01

Which set lists the prerequisites in the Integrative Process, Planning and Assessments category of LEED v5 BD+C: New Construction?

  • A. Fundamental Commissioning, Minimum Energy Efficiency and Fundamental Refrigerant Management
  • B. Construction Management, Fundamental Air Quality and No Smoking or Vehicle Idling
  • C. Climate Resilience Assessment, Human Impact Assessment and Carbon Assessment
  • D. Integrative Process, Site Assessment and Energy Audit
Answer and explanation

Answer: C. Climate Resilience Assessment, Human Impact Assessment and Carbon Assessment

v5 BD+C:NC puts three required assessments at the front of the rating system: climate resilience, human impact and carbon. Each is meant to inform design decisions early rather than be documented at the end.

  • Why not A: These are Energy and Atmosphere prerequisites.
  • Why not B: These are Indoor Environmental Quality prerequisites.
  • Why not D: In v4.1 Integrative Process was a credit and Site Assessment was a Sustainable Sites credit. Neither is a v5 IP prerequisite.

Review topic: v5 IP prerequisites. Source: USGBC, LEED v5 BD+C — Rating-system scorecard; USGBC, LEED v5 BD+C — Rating-system scorecard and impact areas; USGBC, LEED v4.1 BD+C guide (historical)

Question 17

Integrative Process Planning and Assessments · Application · ID GA5-IP-02

Under the LEED v5 BD+C Carbon Assessment prerequisite, USGBC provides a 25-year emissions projection. Which three emission sources does it combine?

  • A. On-site fuel combustion only
  • B. Operational energy, refrigerants and embodied carbon
  • C. Embodied carbon in the structure only
  • D. Occupant commuting only
Answer and explanation

Answer: B. Operational energy, refrigerants and embodied carbon

The projection draws on data from the Operational Carbon Projection and Decarbonization Plan, Fundamental Refrigerant Management and the embodied carbon prerequisite. Transportation demand data can be added but is optional.

  • Why not A: Operational energy is only one of the three inputs.
  • Why not C: Embodied carbon is one input, alongside operations and refrigerants.
  • Why not D: Transportation data is optional, not one of the three core inputs.

Review topic: Carbon Assessment. Source: USGBC, LEED v5 BD+C — Carbon Assessment

Question 18

Integrative Process Planning and Assessments · Application · ID GA5-IP-03

A project team hasn't fixed its building layout yet. The owner wants to understand how glazing, lighting and cooling choices affect one another. What should the team do next?

  • A. Have each discipline optimize its own system and coordinate after equipment is bought
  • B. Finalize the glazing first, then work out the cooling implications
  • C. Compare the options together, across disciplines, before fixing the design
  • D. Document the selected products after construction is complete
Answer and explanation

Answer: C. Compare the options together, across disciplines, before fixing the design

Integrative design means looking at how systems interact while the design can still change. Early, cross-discipline analysis makes tradeoffs like more glass versus more cooling easier to resolve before the choices are locked in.

  • Why not A: That postpones coordination until changes are expensive.
  • Why not B: That locks in one choice before its effects on the others are known.
  • Why not D: Documentation records decisions; it doesn't help make them.

Review topic: Integrative design timing. Source: GSA, Integrative design strategies; GBCI, LEED Green Associate Candidate Handbook (current LEED v5); USGBC, LEED v5 BD+C — Integrative Design Process

Question 19

Integrative Process Planning and Assessments · Analysis · ID GA5-IP-04

A daylighting option would cut electric lighting use but adds west-facing glass that could raise the cooling load. So far the team has compared only lighting energy. What's missing from the analysis?

  • A. Nothing; lower lighting energy always lowers total energy use
  • B. A price comparison of glass products
  • C. A post-occupancy survey taken before the design is chosen
  • D. The combined effect on lighting and cooling, evaluated under the same project assumptions
Answer and explanation

Answer: D. The combined effect on lighting and cooling, evaluated under the same project assumptions

Systems thinking asks how a change in one system affects others. Here the team needs to model lighting and cooling together, with consistent assumptions, before calling the daylighting option an improvement.

  • Why not A: Added solar heat gain can outweigh lighting savings.
  • Why not B: Cost matters, but it doesn't answer the energy question.
  • Why not C: There are no occupants yet, and a survey can't predict the energy tradeoff.

Review topic: Systems thinking. Source: GSA, Integrative design strategies; GSA, Building energy security and efficiency; USGBC, LEED v5 BD+C — Integrative Design Process

Question 20

Integrative Process Planning and Assessments · Recall · ID GA5-IP-05

Why is it useful to include the building's future facility manager on the integrative project team during design?

  • A. They bring practical knowledge of how systems will actually be operated and maintained
  • B. They must sign the team's LEED Green Associate exam applications
  • C. They replace the need for a commissioning provider
  • D. They set the point thresholds for each certification level
Answer and explanation

Answer: A. They bring practical knowledge of how systems will actually be operated and maintained

The current exam specifications list the facility manager among integrative team members. Operations staff can flag maintenance access, controls and staffing limits that designers might miss.

  • Why not B: Exam registration is individual and unrelated to project teams.
  • Why not C: Commissioning is a separate quality-assurance role.
  • Why not D: Certification thresholds are set in the rating system, not by project staff.

Review topic: Integrative team. Source: GBCI, LEED Green Associate Candidate Handbook (current LEED v5); GSA, Integrative design strategies; USGBC, LEED v5 BD+C — Integrative Design Process

Question 21

Integrative Process Planning and Assessments · Application · ID GA5-IP-06

Two systems provide the same service over a 10-year period. System A costs $12,000 up front plus $3,000 per year to operate and maintain. System B costs $18,000 up front plus $2,000 per year. Assume no discounting, price changes, replacements or residual value. Which has the lower 10-year cost, and by how much?

  • A. System A, by $6,000
  • B. System B, by $4,000
  • C. System A, by $4,000
  • D. They're equal, at $40,000 each
Answer and explanation

Answer: B. System B, by $4,000

System A: $12,000 + ($3,000 × 10) = $42,000. System B: $18,000 + ($2,000 × 10) = $38,000. B is $4,000 cheaper over the period even though it costs more up front. This is a simplified life-cycle cost comparison, which is a financial tool; life-cycle assessment (LCA) measures environmental impacts instead.

  • Why not A: $6,000 is the difference in first cost only.
  • Why not C: This reverses the result. A totals $42,000 and B totals $38,000.
  • Why not D: Neither total is $40,000.

Review topic: Life-cycle cost. Source: GSA, Life cycle perspective

Location and Transportation (9 questions)

Question 22

Location and Transportation · Application · ID GA5-LT-01

Which site choice satisfies the "previously developed site" option of the LEED v5 BD+C Sensitive Land Protection credit?

  • A. Placing the development footprint on a lot that held a since-demolished warehouse
  • B. Building in an undeveloped meadow next to a wetland
  • C. Building on an inexpensive, previously undeveloped forested parcel
  • D. Building on previously undeveloped land inside a mapped 100-year floodplain
Answer and explanation

Answer: A. Placing the development footprint on a lot that held a since-demolished warehouse

Option 1 of the v5 credit is met by locating the development footprint on previously developed land. Reusing developed land reduces pressure to build on undeveloped land.

  • Why not B: That's undeveloped land, and it's near a sensitive feature.
  • Why not C: Cheap land isn't the test. The parcel is undeveloped.
  • Why not D: This parcel is previously undeveloped, so it does not meet the stated option; floodplains also appear in the credit's sensitive-land criteria.

Review topic: Sensitive land protection. Source: USGBC, LEED v5 BD+C — Sensitive Land Protection

Question 23

Location and Transportation · Recall · ID GA5-LT-02

In LEED's sensitive-land criteria, what does a "100-year floodplain" mean?

  • A. An area that floods exactly once every 100 years
  • B. An area that has flooded at some point in the past century
  • C. An area with a 1% or greater chance of flooding in any given year
  • D. Any land within 100 feet of a river
Answer and explanation

Answer: C. An area with a 1% or greater chance of flooding in any given year

The credit describes the 100-year floodplain as land subject to a 1% or greater chance of flooding in any given year. It's a probability, not a schedule.

  • Why not A: The 1% chance applies every year. Back-to-back floods are possible.
  • Why not B: The definition is about annual probability, not flood history.
  • Why not D: That confuses the flood definition with a distance buffer.

Review topic: Floodplains. Source: USGBC, LEED v5 BD+C — Sensitive Land Protection

Question 24

Location and Transportation · Application · ID GA5-LT-03

An employer is choosing among four otherwise suitable sites for a new office. Which best reduces the need for routine car trips?

  • A. A new suburban campus with a large free parking lot
  • B. The least expensive parcel at a highway interchange
  • C. A rural site with room for future expansion
  • D. A downtown infill lot within walking distance of shops, services and frequent bus service
Answer and explanation

Answer: D. A downtown infill lot within walking distance of shops, services and frequent bus service

Compact, connected locations with nearby daily uses and real transit give people alternatives to driving. That's a core smart growth principle, and v5 groups these location factors in its Compact and Connected Development credit.

  • Why not A: Ample free parking encourages driving.
  • Why not B: Highway access makes driving the default.
  • Why not C: Distance from daily destinations increases car dependence.

Review topic: Compact development. Source: EPA, About Smart Growth; USGBC, LEED v5 BD+C — Rating-system scorecard; USGBC, LEED v5 BD+C — Compact and Connected Development

Question 25

Location and Transportation · Recall · ID GA5-LT-04

Which LEED v5 BD+C credit brings surrounding density, transit access and walkable location together?

  • A. Surrounding Density and Diverse Uses
  • B. Access to Quality Transit
  • C. Compact and Connected Development
  • D. LEED for Neighborhood Development Location
Answer and explanation

Answer: C. Compact and Connected Development

v5 consolidates several older location credits into Compact and Connected Development. The other three names come from v4.1. Check the version named in the stem rather than treating historical distractors as evidence that a question is outdated.

  • Why not A: That's a v4.1 credit name.
  • Why not B: That's a v4.1 credit name.
  • Why not D: That's a v4.1 credit name.

Review topic: v5 credit names. Source: USGBC, LEED v5 BD+C — Rating-system scorecard; USGBC, LEED v5 BD+C — Rating-system scorecard and impact areas; USGBC, LEED v4.1 BD+C guide (historical); USGBC, LEED v5 BD+C — Compact and Connected Development

Question 26

Location and Transportation · Application · ID GA5-LT-05

An employer's stated goal is to reduce the number of miles employees drive alone to work. Which strategy targets that goal most directly?

  • A. Replacing company fleet cars with electric vehicles while commute patterns stay the same
  • B. A transportation demand management program with transit passes, carpool matching and secure bike parking
  • C. Adding more free parking so employees spend less time circling
  • D. Installing high-efficiency lighting in the parking garage
Answer and explanation

Answer: B. A transportation demand management program with transit passes, carpool matching and secure bike parking

Transportation demand management works on travel behavior itself: making transit, carpooling and cycling practical. The question's goal is fewer drive-alone miles, so the strategy that changes how people commute is the best fit.

  • Why not A: This can cut emissions per mile, but it doesn't reduce the miles driven.
  • Why not C: More free parking makes driving alone easier.
  • Why not D: That saves energy but doesn't change how people travel.

Review topic: Transportation demand management. Source: GBCI, LEED Green Associate Candidate Handbook (current LEED v5); EPA, About Smart Growth

Question 27

Location and Transportation · Analysis · ID GA5-LT-06

On a map, a bus stop sits 300 feet from the building entrance. Reaching it on foot means crossing a six-lane road with no crosswalk. What does this tell you about transit access for occupants?

  • A. Access is fine because the stop is well under a quarter mile away
  • B. Only car access matters for an office building
  • C. Transit access has no role in LEED
  • D. Map distance alone doesn't establish usable access; the actual route and users' needs have to be considered
Answer and explanation

Answer: D. Map distance alone doesn't establish usable access; the actual route and users' needs have to be considered

Good location credits depend on access people can actually use. A short distance on paper doesn't help if the walking route is unsafe, which is why site assessments look at the real path and the people using it.

  • Why not A: Straight-line distance ignores whether people can safely get there.
  • Why not B: That ignores occupants who don't or can't drive.
  • Why not C: Transit access is part of v5's location credits.

Review topic: Usable transit access. Source: EPA, About Smart Growth; USGBC, LEED v5 BD+C — Compact and Connected Development

Question 28

Location and Transportation · Recall · ID GA5-LT-07

Which description best fits a brownfield?

  • A. A property whose expansion, redevelopment or reuse may be complicated by real or potential contamination
  • B. Undeveloped land covered in dry native grasses
  • C. Any land that was once farmed
  • D. A cleaned-up site that never needs further assessment
Answer and explanation

Answer: A. A property whose expansion, redevelopment or reuse may be complicated by real or potential contamination

A brownfield is a property whose expansion, redevelopment or reuse may be complicated by the presence or potential presence of contamination. Assessing and, where needed, cleaning up these properties supports their reuse.

  • Why not B: Dry grass or a property's color does not establish actual or potential contamination.
  • Why not C: Former farmland isn't automatically a brownfield.
  • Why not D: Assessment determines what contamination and cleanup or management needs are present; reuse is not a blanket exemption from further checks.

Review topic: Brownfields. Source: EPA, Environmental Contamination at Brownfield Sites; EPA, About Smart Growth

Question 29

Location and Transportation · Analysis · ID GA5-LT-08

Two sites both meet a project's needs. One is a previously developed vacant lot already served by roads and utilities. The other would require clearing intact woodland and extending utilities. From a LEED site-selection standpoint, which is preferable?

  • A. The woodland, because new utilities can be designed to be efficient
  • B. Either one; LEED doesn't consider where a project is located
  • C. The vacant lot, because it uses existing infrastructure and avoids disturbing habitat, subject to its own site assessment
  • D. The woodland, as long as trees are planted somewhere else later
Answer and explanation

Answer: C. The vacant lot, because it uses existing infrastructure and avoids disturbing habitat, subject to its own site assessment

LEED rewards development on land that's already disturbed and served by infrastructure. The vacant lot still needs its own assessment, but it avoids clearing habitat and extending services into undeveloped land.

  • Why not A: Efficient new utilities don't avoid the habitat clearing or the need to extend services.
  • Why not B: Location and Transportation is an entire LEED domain.
  • Why not D: Off-site planting doesn't avoid the habitat loss on this site.

Review topic: Site selection. Source: EPA, About Smart Growth; USGBC, LEED v5 BD+C — Sensitive Land Protection

Question 30

Location and Transportation · Application · ID GA5-LT-09

Which approach fits LEED's aim of reducing a project's parking footprint?

  • A. Providing extra free parking to avoid complaints
  • B. Providing less parking than is typical, charging for it, and supporting transit and carpool options
  • C. Converting landscaped areas into overflow parking
  • D. Building a larger garage so drivers find spaces faster
Answer and explanation

Answer: B. Providing less parking than is typical, charging for it, and supporting transit and carpool options

The current exam specifications list reduction in parking footprint under transportation demand management. Less parking, priced appropriately and paired with alternatives, can reduce driving demand and land devoted to parking.

  • Why not A: That increases the footprint and encourages driving.
  • Why not C: That adds paving and removes vegetated area.
  • Why not D: A larger garage adds parking capacity rather than reducing demand for parking.

Review topic: Parking footprint. Source: GBCI, LEED Green Associate Candidate Handbook (current LEED v5); EPA, About Smart Growth

Sustainable Sites (8 questions)

Question 31

Sustainable Sites · Recall · ID GA5-SS-01

What's the name of the Sustainable Sites prerequisite in LEED v5 BD+C: New Construction?

  • A. Minimize Site Disturbance
  • B. Construction Activity Pollution Prevention
  • C. Environmental Site Assessment
  • D. Rainwater Management
Answer and explanation

Answer: A. Minimize Site Disturbance

v5 replaced Construction Activity Pollution Prevention with Minimize Site Disturbance. It still requires an erosion and sedimentation control plan, and it adds site assessment work such as protecting healthy plant communities.

  • Why not B: That was the v4.1 prerequisite name.
  • Why not C: That's a v4.1 Schools prerequisite, not the v5 NC prerequisite.
  • Why not D: Rainwater Management is a v5 credit, not a prerequisite.

Review topic: v5 SS prerequisite. Source: USGBC, LEED v5 BD+C — Rating-system scorecard; USGBC, LEED v5 BD+C — Minimize Site Disturbance; USGBC, LEED v4.1 BD+C guide (historical)

Question 32

Sustainable Sites · Recall · ID GA5-SS-02

How does a healthy tree canopy reduce local heat?

  • A. By absorbing extra solar heat into their leaves and releasing it at night
  • B. By generating electricity that powers cooling
  • C. By guaranteeing a fixed temperature drop at every site
  • D. By shading surfaces and cooling the air through evapotranspiration
Answer and explanation

Answer: D. By shading surfaces and cooling the air through evapotranspiration

Trees and vegetation cool their surroundings in two ways: shade keeps surfaces from heating up, and evapotranspiration releases water vapor that cools the air. That's why v5's heat island credit counts shade over paving.

  • Why not A: That reverses the mechanism.
  • Why not B: Trees don't generate electricity.
  • Why not C: Benefits vary with climate, species and canopy size.

Review topic: Heat island: trees. Source: EPA, Benefits of Trees and Vegetation (heat islands); USGBC, LEED v5 BD+C — Heat Island Reduction

Question 33

Sustainable Sites · Application · ID GA5-SS-03

Runoff from a roof and parking lot rushes straight into a storm drain. The site has soils and space suitable for infiltration. Which strategy helps manage that runoff on site?

  • A. Adding more impervious paving to speed drainage
  • B. Piping the runoff to a neighbor's property
  • C. A properly designed vegetated rain garden that collects and soaks in runoff
  • D. Assuming any site can soak in any storm without design
Answer and explanation

Answer: C. A properly designed vegetated rain garden that collects and soaks in runoff

Rain gardens hold runoff and let it soak into the ground, reducing the volume and pollutants reaching storm drains. They work when soils and siting are suitable, which the scenario provides.

  • Why not A: That increases runoff.
  • Why not B: That moves the problem without managing it.
  • Why not D: Infiltration depends on soils, siting and sizing.

Review topic: Rainwater management. Source: EPA WaterSense, Landscaping Tips; GBCI, LEED Green Associate Candidate Handbook (current LEED v5)

Question 34

Sustainable Sites · Application · ID GA5-SS-04

New parking lot lights are spilling glare onto neighboring homes and sending light into the night sky. What does LEED v5 BD+C's Light Pollution Reduction credit focus on?

  • A. Raising light output so the lot looks evenly lit
  • B. Limiting uplight, light trespass and glare from exterior luminaires
  • C. Indoor lighting levels in occupied spaces
  • D. Choosing a fixture color that proves compliance
Answer and explanation

Answer: B. Limiting uplight, light trespass and glare from exterior luminaires

The v5 credit sets limits on uplight and on light trespass (backlight and glare ratings) for exterior luminaires, plus nighttime luminance limits for internally lit signs. Its intent is to protect night sky access and reduce effects on wildlife and people.

  • Why not A: More output without control makes spill worse.
  • Why not C: The credit addresses exterior lighting.
  • Why not D: Compliance is based on uplight, backlight and glare ratings, not color.

Review topic: Light pollution. Source: USGBC, LEED v5 BD+C — Light Pollution Reduction

Question 35

Sustainable Sites · Application · ID GA5-SS-05

Which paving choice counts as a nonroof heat-island measure in the LEED v5 BD+C Heat Island Reduction credit?

  • A. An open-grid pavement system that's at least 50% unbound
  • B. Fresh black asphalt
  • C. Decorative pavers chosen for color, with no reflectance data
  • D. Dark rubber surfacing
Answer and explanation

Answer: A. An open-grid pavement system that's at least 50% unbound

Nonroof measures in v5 include shade over paving, paving with an initial solar reflectance (SR) of at least 0.33, and open-grid pavement that's at least 50% unbound. The open grid lets vegetation or permeable material break up the heat-absorbing surface.

  • Why not B: Dark, low-reflectance asphalt absorbs heat.
  • Why not C: The credit needs a measured solar reflectance, not a color choice.
  • Why not D: Dark surfacing absorbs heat.

Review topic: Heat island: paving. Source: USGBC, LEED v5 BD+C — Heat Island Reduction

Question 36

Sustainable Sites · Application · ID GA5-SS-06

LEED v5 BD+C's Heat Island Reduction credit adds a Tree Equity option. What does it ask a U.S. project in a high-priority area to do?

  • A. Plant trees anywhere off-site to offset new paving
  • B. Remove trees to make room for reflective paving
  • C. Count indoor plants toward canopy cover
  • D. Use a tree-equity evaluation of the location to increase on-site tree canopy
Answer and explanation

Answer: D. Use a tree-equity evaluation of the location to increase on-site tree canopy

For U.S. projects, the team checks the American Forests Tree Equity Score for the location and, in high-priority areas, uses it to increase on-site canopy. It ties heat-island work to neighborhoods with less tree cover.

  • Why not A: The option focuses on canopy at the project site informed by the local evaluation.
  • Why not B: That reduces canopy.
  • Why not C: Indoor plants aren't tree canopy.

Review topic: Heat island: tree equity. Source: USGBC, LEED v5 BD+C — Heat Island Reduction

Question 37

Sustainable Sites · Application · ID GA5-SS-07

A preconstruction site assessment finds a healthy native plant community right next to the planned work area. What does LEED v5 BD+C's Minimize Site Disturbance prerequisite call for?

  • A. Clear it first and document the loss afterward
  • B. Protect it with an exclusion zone marked by physical barriers during construction
  • C. Treat a landscape rendering as the site assessment
  • D. Remove it and restore habitat somewhere else later
Answer and explanation

Answer: B. Protect it with an exclusion zone marked by physical barriers during construction

The prerequisite asks teams to identify healthy plant communities, minimize damage to them, and establish exclusion zones with physical barriers during construction. Its intent is to preserve native vegetation, healthy soils and habitat.

  • Why not A: The prerequisite requires minimizing damage, not documenting it.
  • Why not C: A rendering isn't an assessment of existing conditions.
  • Why not D: Off-site restoration doesn't meet the requirement to protect identified healthy plant communities.

Review topic: Protecting habitat during construction. Source: USGBC, LEED v5 BD+C — Minimize Site Disturbance

Question 38

Sustainable Sites · Analysis · ID GA5-SS-08

A project's climate resilience assessment identifies extreme heat and flooding as the site's two priority hazards. How should those findings shape site design?

  • A. Use them to choose site strategies that address those specific hazards
  • B. Ignore them, since the assessment is only paperwork
  • C. Pick a popular resilience feature unrelated to either hazard
  • D. Use only historical weather averages and ignore projections
Answer and explanation

Answer: A. Use them to choose site strategies that address those specific hazards

v5's Climate Resilience Assessment covers current and projected hazards, requires at least two priority hazards, and asks the team to use the findings in planning, design and operations. Site design is where heat and flood strategies usually land.

  • Why not B: The requirement asks teams to use the assessment to inform planning and design.
  • Why not C: Strategies should respond to the identified hazards.
  • Why not D: The assessment covers current and projected future hazards.

Review topic: Site resilience. Source: USGBC, LEED v5 BD+C — Climate Resilience Assessment

Water Efficiency (10 questions)

Question 39

Water Efficiency · Recall · ID GA5-WE-01

LEED v5 BD+C's Minimum Water Efficiency prerequisite offers two ways to meet the fixture and fitting requirement. What are they?

  • A. Install WaterSense fixtures in half the restrooms, or meter all water use
  • B. Cut irrigation by 50% instead of changing fixtures
  • C. Install fixtures at or below listed maximum flush and flow rates, or show a 20% aggregate reduction from a baseline
  • D. Pay a water-use offset fee, or install a cistern
Answer and explanation

Answer: C. Install fixtures at or below listed maximum flush and flow rates, or show a 20% aggregate reduction from a baseline

The prerequisite has a prescriptive path (no fixture over the listed maximum rates) and a performance path (aggregate use 20% below the baseline table). It also sets separate appliance, process water and outdoor requirements.

  • Why not A: WaterSense is recommended, but neither of these is a compliance path.
  • Why not B: Outdoor and indoor requirements are separate; one doesn't replace the other.
  • Why not D: Neither is a compliance path.

Review topic: Minimum water efficiency. Source: USGBC, LEED v5 BD+C — Minimum Water Efficiency

Question 40

Water Efficiency · Application · ID GA5-WE-02

A project replaces toilets using 1.6 gallons per flush (gpf) (6.0 lpf), the LEED v5 BD+C baseline, with models using 1.28 gpf (4.8 lpf). What's the percent reduction per flush?

  • A. 12.8%
  • B. 20%
  • C. 25%
  • D. 32%
Answer and explanation

Answer: B. 20%

Percent reduction = (baseline − proposed) ÷ baseline = (1.6 − 1.28) ÷ 1.6 = 0.32 ÷ 1.6 = 20%. Always divide by the baseline. In v5, 1.6 gpf is the baseline and 1.28 gpf is the prescriptive maximum.

  • Why not A: That reads the new flush volume as a percentage.
  • Why not C: That divides the savings by the new flow (0.32 ÷ 1.28) instead of by the baseline.
  • Why not D: 0.32 is the gallons saved per flush, not a percentage.

Review topic: Percent reduction. Source: USGBC, LEED v5 BD+C — Minimum Water Efficiency

Question 41

Water Efficiency · Application · ID GA5-WE-03

A landscape designer says the planting won't need a permanent irrigation system once it's established. Under LEED v5 BD+C's minimum outdoor water requirement, how long can temporary irrigation run?

  • A. Not at all; no-irrigation landscapes can never be watered
  • B. Up to five years
  • C. Indefinitely, as long as the system has a timer
  • D. Up to a two-year establishment period
Answer and explanation

Answer: D. Up to a two-year establishment period

The no-irrigation option asks the team to show the landscape doesn't need a permanent irrigation system beyond a maximum two-year establishment period. The alternative option is efficient irrigation that cuts the irrigation requirement by at least 30% from a calculated baseline.

  • Why not A: Temporary watering during establishment is allowed.
  • Why not B: The establishment period is a maximum of two years.
  • Why not C: A permanent system, timer or not, isn't a no-irrigation landscape.

Review topic: Outdoor water use. Source: USGBC, LEED v5 BD+C — Minimum Water Efficiency

Question 42

Water Efficiency · Application · ID GA5-WE-04

A designer is choosing plants for a hot, dry corner of a site. Which approach best reduces outdoor water use?

  • A. Assume every native plant is drought tolerant everywhere
  • B. Skip all watering from day one, even for new plantings
  • C. Choose low-water, noninvasive plants suited to that microclimate, and water appropriately while they establish
  • D. Pick plants based only on appearance
Answer and explanation

Answer: C. Choose low-water, noninvasive plants suited to that microclimate, and water appropriately while they establish

Matching plants to site conditions and grouping them by water needs cuts irrigation demand. New plantings still need care while they establish, which is why v5 allows a temporary establishment period.

  • Why not A: Native plants vary; suitability depends on the specific conditions.
  • Why not B: New plantings usually need water while they establish.
  • Why not D: Appearance alone ignores water needs.

Review topic: Plant selection. Source: EPA WaterSense, Landscaping Tips; USGBC, LEED v5 BD+C — Minimum Water Efficiency

Question 43

Water Efficiency · Recall · ID GA5-WE-05

Which irrigation controller adjusts watering based on measured moisture in the root zone rather than a fixed clock?

  • A. A standard clock timer
  • B. A building water meter
  • C. A weather-based controller only
  • D. A soil moisture-based controller
Answer and explanation

Answer: D. A soil moisture-based controller

Smart irrigation controllers come in two main types: weather-based controllers use local weather data, and soil moisture-based controllers use sensors in the root zone. The second type is the one that responds to measured soil moisture.

  • Why not A: Clock timers run on a schedule regardless of conditions.
  • Why not B: A meter measures use; it doesn't control irrigation.
  • Why not C: Weather-based controllers use weather data, not soil moisture readings.

Review topic: Irrigation controls. Source: EPA WaterSense, Labeled Irrigation Controllers

Question 44

Water Efficiency · Application · ID GA5-WE-06

Building meter data shows steady water flow overnight, when the building is empty. What's the best next step?

  • A. Use meter and submeter data to trace where the flow occurs, then inspect the likely equipment
  • B. Replace every fixture in the building right away
  • C. Assume it's a leak and ignore other causes
  • D. Rely on the monthly utility bill to identify the end use
Answer and explanation

Answer: A. Use meter and submeter data to trace where the flow occurs, then inspect the likely equipment

Metering is how you find and verify problems. Unexpected overnight use is a signal to investigate, starting with submeters and equipment, rather than proof of a specific cause.

  • Why not B: That spends money before the source is found.
  • Why not C: Overnight flow can also come from equipment schedules or settings.
  • Why not D: A bill shows a total, not where water is going.

Review topic: Metering and leaks. Source: EPA WaterSense, Getting Started (commercial water management); USGBC, LEED v5 BD+C — Rating-system scorecard

Question 45

Water Efficiency · Application · ID GA5-WE-07

A building has an approved onsite system that treats rainwater to the standard required for toilet flushing. How does using it for flushing help water efficiency?

  • A. It makes untreated graywater safe for drinking
  • B. It replaces potable (drinking-quality) water for that use
  • C. It means fixture flow rates no longer matter
  • D. It's allowed everywhere without local approval
Answer and explanation

Answer: B. It replaces potable (drinking-quality) water for that use

Onsite non-potable reuse uses water treated to fit its purpose, such as toilet flushing, so drinking-quality water isn't used where it isn't needed. The system has to meet local rules, which the scenario states it does.

  • Why not A: Treatment for flushing doesn't make water potable.
  • Why not C: Efficient fixtures still reduce total demand.
  • Why not D: Onsite reuse depends on local regulations.

Review topic: Water reuse. Source: EPA, Onsite Non-Potable Water Reuse Resources

Question 46

Water Efficiency · Recall · ID GA5-WE-08

Which practice does LEED v5 BD+C's Minimum Water Efficiency prerequisite prohibit for equipment that rejects heat?

  • A. Air-cooled ice machines
  • B. Cooling towers with conductivity controllers
  • C. Once-through cooling with potable water
  • D. Closed-loop condenser water systems
Answer and explanation

Answer: C. Once-through cooling with potable water

Once-through cooling runs potable water through equipment a single time and then down the drain. v5 BD+C prohibits it for any equipment or appliance that rejects heat.

  • Why not A: v5 calls for air-cooled or closed-loop cooling for ice machines.
  • Why not B: Conductivity controllers are required, not prohibited.
  • Why not D: Closed-loop systems avoid dumping water after one pass.

Review topic: Process water. Source: USGBC, LEED v5 BD+C — Minimum Water Efficiency

Question 47

Water Efficiency · Application · ID GA5-WE-09

Under LEED v5 BD+C's Minimum Water Efficiency prerequisite, which set of features must cooling towers and evaporative condensers have?

  • A. A potable water bypass and a manual drain
  • B. Solar panels on the tower roof
  • C. A once-through cooling backup
  • D. Makeup water meters, conductivity controllers and overflow alarms, and efficient drift eliminators
Answer and explanation

Answer: D. Makeup water meters, conductivity controllers and overflow alarms, and efficient drift eliminators

v5 requires makeup water meters, conductivity controllers and overflow alarms, and efficient drift eliminators. Together they let operators track water, control how often water is dumped, and limit spray losses.

  • Why not A: These aren't the listed requirements.
  • Why not B: Not a water efficiency requirement.
  • Why not C: Once-through potable cooling is prohibited.

Review topic: Cooling towers. Source: USGBC, LEED v5 BD+C — Minimum Water Efficiency

Question 48

Water Efficiency · Analysis · ID GA5-WE-10

Same building, same meter. Period A: 100 occupants used 3,000 gallons per day. Period B: 150 occupants used 3,600 gallons per day. Which statement is correct?

  • A. Total daily use rose 20%, and use per person fell 20%
  • B. Total use rose 600 gallons, which proves the building became less efficient
  • C. Total use rose 16.7%, and use per person fell 25%
  • D. Use per person rose 20%
Answer and explanation

Answer: A. Total daily use rose 20%, and use per person fell 20%

Total: (3,600 − 3,000) ÷ 3,000 = 20% increase. Per person: 3,000 ÷ 100 = 30 gallons, and 3,600 ÷ 150 = 24 gallons; (30 − 24) ÷ 30 = 20% decrease. Neither number alone explains why use changed.

  • Why not B: Per-person use actually fell; total use alone doesn't show efficiency.
  • Why not C: These divide by the wrong baselines (600 ÷ 3,600 and 6 ÷ 24).
  • Why not D: Per-person use went from 30 to 24 gallons, a decrease.

Review topic: Reading water data. Source: EPA WaterSense, Getting Started (commercial water management)

Energy and Atmosphere (15 questions)

Question 49

Energy and Atmosphere · Recall · ID GA5-EA-01

Which LEED v5 BD+C prerequisite asks a project to project its operational carbon emissions and plan how to reduce them?

  • A. Minimum Energy Efficiency
  • B. Operational Carbon Projection and Decarbonization Plan
  • C. Fundamental Commissioning
  • D. Enhanced Energy Efficiency
Answer and explanation

Answer: B. Operational Carbon Projection and Decarbonization Plan

v5 BD+C opens its Energy and Atmosphere category with the Operational Carbon Projection and Decarbonization Plan. It's new in v5 and a good marker that study material is current.

  • Why not A: That prerequisite sets an efficiency floor; it isn't the carbon projection and plan.
  • Why not C: Commissioning verifies systems against the owner's requirements.
  • Why not D: That's an optional credit, not a prerequisite.

Review topic: v5 EA prerequisites. Source: USGBC, LEED v5 BD+C — Rating-system scorecard; USGBC, LEED v5 BD+C — Rating-system scorecard and impact areas

Question 50

Energy and Atmosphere · Recall · ID GA5-EA-02

Which process verifies that building systems are designed, installed and working to meet the owner's requirements?

  • A. Commissioning
  • B. Energy benchmarking
  • C. Certification review
  • D. Value engineering
Answer and explanation

Answer: A. Commissioning

Commissioning is a quality-assurance process. In v5, the commissioning provider helps develop the owner's project requirements, reviews the design and construction against them, and plans ongoing commissioning.

  • Why not B: Benchmarking compares energy performance; it doesn't verify system installation.
  • Why not C: Certification review checks LEED documentation.
  • Why not D: Value engineering looks for cost savings.

Review topic: Commissioning. Source: USGBC, LEED v5 BD+C — Fundamental Commissioning; DOE FEMP, Commissioning in Federal Buildings

Question 51

Energy and Atmosphere · Application · ID GA5-EA-03

In the commissioning process, what's the difference between the owner's project requirements (OPR) and the basis of design (BOD)?

  • A. The OPR is written by the contractor; the BOD by the commissioning provider
  • B. They're two names for the same document
  • C. The BOD is written after occupancy to record performance
  • D. The OPR states what the owner needs from the building; the BOD explains how the design team's design meets those needs
Answer and explanation

Answer: D. The OPR states what the owner needs from the building; the BOD explains how the design team's design meets those needs

The OPR captures the owner's goals and requirements, and the BOD documents how the design meets them. The v5 commissioning prerequisite has the provider help develop the OPR and review the BOD for compliance with it.

  • Why not A: The OPR comes from the owner, and the BOD from the design team.
  • Why not B: They're separate documents with different authors and purposes.
  • Why not C: The BOD is a design document; the commissioning provider reviews it during design.

Review topic: OPR and BOD. Source: USGBC, LEED v5 BD+C — Fundamental Commissioning

Question 52

Energy and Atmosphere · Application · ID GA5-EA-04

Under LEED v5 BD+C's Fundamental Commissioning prerequisite, by when must the owner designate a commissioning provider?

  • A. After substantial completion of construction
  • B. During the first year of occupancy
  • C. By the end of the design development phase
  • D. Only if problems show up during construction
Answer and explanation

Answer: C. By the end of the design development phase

v5 requires the owner to designate a commissioning provider by the end of design development. The provider should help develop the OPR in predesign or as early as possible, so earlier is better.

  • Why not A: Commissioning starts long before construction ends.
  • Why not B: That's far too late to influence design.
  • Why not D: Commissioning is required for all projects.

Review topic: Commissioning timing. Source: USGBC, LEED v5 BD+C — Fundamental Commissioning

Question 53

Energy and Atmosphere · Application · ID GA5-EA-05

Under LEED v5 BD+C's Fundamental Refrigerant Management prerequisite, which refrigerant type may not be used in new equipment?

  • A. Hydrochlorofluorocarbons (HCFCs)
  • B. Any refrigerant at all
  • C. Refrigerants with a global warming potential below 700
  • D. Natural refrigerants such as CO2
Answer and explanation

Answer: A. Hydrochlorofluorocarbons (HCFCs)

The v5 prerequisite prohibits HCFCs in new equipment. It also requires a refrigerant inventory, an evaluation of alternatives for refrigerants above a GWP of 700, and leak checks before substantial completion.

  • Why not B: Projects can use refrigerants if they meet the inventory, evaluation and leak-check requirements.
  • Why not C: A GWP below 700 is not itself a prohibited class. The HCFC prohibition still applies regardless of GWP.
  • Why not D: Nothing in the prerequisite prohibits them.

Review topic: Refrigerant management. Source: USGBC, LEED v5 BD+C — Fundamental Refrigerant Management

Question 54

Energy and Atmosphere · Recall · ID GA5-EA-06

A refrigerant has zero ozone-depletion potential. What does that tell you about its climate impact?

  • A. Its global warming potential must also be low
  • B. It's climate-neutral
  • C. Nothing by itself; some refrigerants that don't deplete ozone, such as many HFCs, have high global warming potential
  • D. It has the same global warming potential as CO2
Answer and explanation

Answer: C. Nothing by itself; some refrigerants that don't deplete ozone, such as many HFCs, have high global warming potential

EPA notes that hydrofluorocarbons (HFCs) don't deplete the stratospheric ozone layer, yet they're potent greenhouse gases with impacts hundreds to thousands of times greater than the same amount of CO2. Check both measures, not one.

  • Why not A: Ozone depletion and global warming potential are separate measures.
  • Why not B: Many non-ozone-depleting refrigerants are potent greenhouse gases.
  • Why not D: CO2 has a GWP of 1 by definition; HFCs are often far higher.

Review topic: Ozone depletion vs. global warming. Source: EPA, Frequent Questions on the Phasedown of HFCs

Question 55

Energy and Atmosphere · Application · ID GA5-EA-07

A project wants renewable energy certificates (RECs) covering 35 megawatt-hours (MWh) of electricity. It already holds 12 eligible RECs set aside for this claim. Each REC represents 1 MWh. How many more RECs does it need?

  • A. 23
  • B. 35
  • C. 47
  • D. 23,000
Answer and explanation

Answer: A. 23

Each REC represents the attributes of 1 MWh of renewable generation, so 35 − 12 = 23 more RECs. A REC is an accounting instrument, not stored electricity.

  • Why not B: That ignores the 12 RECs already held.
  • Why not C: That adds instead of subtracting.
  • Why not D: That treats each REC as 1 kilowatt-hour instead of 1 MWh.

Review topic: Renewable energy certificates. Source: EPA, Renewable Energy Certificates (RECs)

Question 56

Energy and Atmosphere · Application · ID GA5-EA-08

A project buys RECs to count toward the LEED v5 BD+C Renewable Energy credit. What has to happen to those certificates?

  • A. They can be resold once the building is certified
  • B. They must be retired on behalf of the LEED project
  • C. They must be stored as battery energy on site
  • D. Another buyer can count the same certificates at the same time
Answer and explanation

Answer: B. They must be retired on behalf of the LEED project

v5 requires that all environmental attributes, including RECs, be retired on behalf of the LEED project. EPA explains that RECs are how renewable electricity use claims are substantiated, so each one can back only one claim.

  • Why not A: Reselling would let someone else claim the same renewable attributes.
  • Why not C: RECs aren't physical energy.
  • Why not D: That would be double counting.

Review topic: RECs and claims. Source: USGBC, LEED v5 BD+C — Renewable Energy; EPA, Renewable Energy Certificates (RECs)

Question 57

Energy and Atmosphere · Application · ID GA5-EA-09

Under LEED v5 BD+C's Renewable Energy credit, which source is classified as Tier 1? Assume the off-site options are neither campus generation nor qualifying social impact projects.

  • A. Off-site electricity that's Green-e Energy certified
  • B. Electricity from a new off-site wind farm contracted for the project
  • C. Carbon offsets
  • D. A photovoltaic (solar) system on the project site
Answer and explanation

Answer: D. A photovoltaic (solar) system on the project site

Tier 1 includes on-site generation, campus generation and qualifying social impact projects. The on-site photovoltaic system fits that tier. New off-site generation can qualify for Tier 2 when its conditions are met; other eligible off-site supply can qualify for Tier 3. Certification or a new contract alone does not determine a tier.

  • Why not A: Green-e certification alone does not establish the location or project conditions for Tier 1.
  • Why not B: A new off-site wind farm outside the excluded Tier 1 paths may qualify for Tier 2, subject to the credit’s conditions.
  • Why not C: Offsets represent avoided emissions, not renewable electricity, so they aren't a renewable tier.

Review topic: Renewable energy tiers. Source: USGBC, LEED v5 BD+C — Renewable Energy; EPA, Renewable Energy Certificates (RECs)

Question 58

Energy and Atmosphere · Analysis · ID GA5-EA-10

A company replaces the gas boilers in its own building with electric heat pumps. How does this change its greenhouse gas accounting?

  • A. All of the building's operational emissions drop to zero
  • B. Direct (Scope 1) emissions from burning gas go away, but emissions tied to the purchased electricity (Scope 2) still count
  • C. Electricity use becomes a Scope 1 emission
  • D. The heat pumps' manufacturing emissions become Scope 2
Answer and explanation

Answer: B. Direct (Scope 1) emissions from burning gas go away, but emissions tied to the purchased electricity (Scope 2) still count

EPA defines Scope 1 as direct emissions from sources an organization owns or controls, such as boilers, and Scope 2 as indirect emissions from purchased electricity, steam, heat or cooling. Electrification shifts emissions from one scope to the other; it doesn't erase them automatically.

  • Why not A: Electrification alone does not establish zero operational emissions for the whole building.
  • Why not C: Purchased electricity is Scope 2.
  • Why not D: Manufacturing emissions are embodied carbon, not purchased energy.

Review topic: Electrification and emission scopes. Source: EPA, Scope 1 and Scope 2 Inventory Guidance

Question 59

Energy and Atmosphere · Application · ID GA5-EA-11

Building A used less total energy last year than Building B. Building A is half the size, has fewer occupants and is in a milder climate. What's the right next step before calling A the better performer?

  • A. Declare A the better performer because its total is lower
  • B. Compare their utility rates
  • C. Compare them using normalized benchmarking that accounts for size, use and weather
  • D. Compare one hour of meter data from each
Answer and explanation

Answer: C. Compare them using normalized benchmarking that accounts for size, use and weather

Benchmarking compares buildings fairly by normalizing for factors like floor area, operating hours and weather. Without that, raw totals can confuse differences in size and climate with differences in efficiency.

  • Why not A: Raw totals ignore size, occupancy and climate.
  • Why not B: Price doesn't measure energy performance.
  • Why not D: One hour can't represent annual performance.

Review topic: Benchmarking. Source: GSA, Building energy security and efficiency

Question 60

Energy and Atmosphere · Application · ID GA5-EA-12

A building can run a flexible process at a different time without affecting service. The local utility's peak demand is from 4 to 8 p.m. Which action supports grid-interactive goals?

  • A. Run every flexible load during the peak
  • B. Assume lowering peak demand always lowers annual energy use
  • C. Ignore operating constraints when rescheduling
  • D. Schedule that load outside the 4-8 p.m. peak
Answer and explanation

Answer: D. Schedule that load outside the 4-8 p.m. peak

Demand flexibility shifts suitable loads away from grid peaks. It reduces strain on the grid at critical hours even if total energy use stays about the same. LEED v5 BD+C includes a Grid Interactive credit in Energy and Atmosphere.

  • Why not A: That adds to peak demand.
  • Why not B: Shifting load can cut peak demand without changing total energy.
  • Why not C: The scenario only works because the load is flexible.

Review topic: Load shifting. Source: GSA, Building energy security and efficiency; USGBC, LEED v5 BD+C — Rating-system scorecard

Question 61

Energy and Atmosphere · Analysis · ID GA5-EA-13

A team models two wall assemblies. Between the two model runs, it also changes the occupancy schedule. The second run uses less energy. What can the team conclude?

  • A. The better wall caused the entire savings
  • B. Changing more variables makes the comparison more accurate
  • C. Not yet; it has to hold other assumptions constant before crediting the walls with the difference
  • D. A product label can replace the model comparison
Answer and explanation

Answer: C. Not yet; it has to hold other assumptions constant before crediting the walls with the difference

To isolate one design choice in an energy model, keep every other assumption the same. Otherwise the result mixes the wall's effect with the schedule's effect.

  • Why not A: The schedule change could explain some or all of it.
  • Why not B: Changing variables at once makes it impossible to isolate one cause.
  • Why not D: A label doesn't show how the assembly performs in this building.

Review topic: Energy modeling. Source: GSA, Building energy security and efficiency

Question 62

Energy and Atmosphere · Application · ID GA5-EA-14

A battery system has 120 kilowatt-hours (kWh) of usable stored energy and supplies a constant 30-kilowatt (kW) load. Ignoring losses and reserve, and assuming the battery can deliver 30 kW, how long can it run the load?

  • A. 4 hours
  • B. 0.25 hours
  • C. 90 hours
  • D. 3,600 hours
Answer and explanation

Answer: A. 4 hours

Run time = energy ÷ power = 120 kWh ÷ 30 kW = 4 hours. This is an idealized exercise; real systems have losses, reserve limits and output limits.

  • Why not B: That divides kW by kWh, the wrong way around.
  • Why not C: That subtracts the load from the stored energy.
  • Why not D: That multiplies the two numbers.

Review topic: Energy storage. Source: GSA, Building energy security and efficiency

Question 63

Energy and Atmosphere · Application · ID GA5-EA-15

Energy modeling shows that a better building envelope reduces the peak heating and cooling load. What should the team do with the HVAC design?

  • A. Keep the original equipment sizes, since bigger is always safer
  • B. Re-evaluate equipment sizing against the reduced load instead of keeping the original sizes
  • C. Size equipment by floor area alone
  • D. Treat the modeled savings as guaranteed
Answer and explanation

Answer: B. Re-evaluate equipment sizing against the reduced load instead of keeping the original sizes

Reducing loads first can allow smaller equipment, which saves first cost and energy. LEED v5 BD+C also has a credit named Reduce Peak Thermal Loads in Energy and Atmosphere.

  • Why not A: Oversized equipment can cost more and run less efficiently.
  • Why not C: Floor area ignores the envelope improvement.
  • Why not D: Models estimate performance; they don't guarantee it.

Review topic: Loads and sizing. Source: GSA, Building energy security and efficiency; USGBC, LEED v5 BD+C — Rating-system scorecard

Materials and Resources (11 questions)

Question 64

Materials and Resources · Recall · ID GA5-MR-01

LEED v5 BD+C's Quantify and Assess Embodied Carbon prerequisite asks teams to quantify which life-cycle stages for the project's structure, enclosure and hardscape?

  • A. Operational energy use only
  • B. End-of-life disposal only
  • C. Occupant commuting
  • D. Cradle-to-gate (stages A1-A3)
Answer and explanation

Answer: D. Cradle-to-gate (stages A1-A3)

The prerequisite asks for cradle-to-gate (A1-A3) global warming potential for each material, calculated as GWP per unit times quantity, or reported from LCA software.

  • Why not A: Operational energy is handled in the Energy and Atmosphere category.
  • Why not B: The prerequisite focuses on cradle-to-gate, not disposal.
  • Why not C: Commuting isn't part of material embodied carbon.

Review topic: Embodied carbon scope. Source: USGBC, LEED v5 BD+C — Quantify and Assess Embodied Carbon

Question 65

Materials and Resources · Application · ID GA5-MR-02

Which material must be included in the LEED v5 BD+C embodied carbon calculation?

  • A. Office chairs
  • B. Concrete in the foundations and slabs
  • C. Carpet tile
  • D. Kitchen appliances
Answer and explanation

Answer: B. Concrete in the foundations and slabs

The minimum material list covers structure, enclosure and hardscape, including asphalt, concrete, masonry, structural steel, insulation, aluminum extrusions, structural wood, cladding and glass.

  • Why not A: Furniture isn't in the prerequisite's structure, enclosure and hardscape scope.
  • Why not C: Interior finishes aren't in the minimum scope.
  • Why not D: Appliances aren't structure, enclosure or hardscape.

Review topic: Embodied carbon scope. Source: USGBC, LEED v5 BD+C — Quantify and Assess Embodied Carbon

Question 66

Materials and Resources · Application · ID GA5-MR-03

After quantifying embodied carbon, what else does LEED v5 BD+C's embodied carbon prerequisite require?

  • A. Identify the top three sources and describe how project-specific strategies were considered to reduce them
  • B. Buy carbon offsets equal to the total
  • C. Get a third-party certification for every product
  • D. Replace all concrete with timber
Answer and explanation

Answer: A. Identify the top three sources and describe how project-specific strategies were considered to reduce them

Beyond the number, the prerequisite asks teams to find their biggest "hot spots" and show they considered ways to cut them. That turns measurement into design decisions.

  • Why not B: Offsets aren't part of this prerequisite.
  • Why not C: Not required by the prerequisite.
  • Why not D: No single material swap is required.

Review topic: Embodied carbon hot spots. Source: USGBC, LEED v5 BD+C — Quantify and Assess Embodied Carbon

Question 67

Materials and Resources · Recall · ID GA5-MR-04

Which of these is a Materials and Resources prerequisite in LEED v5 BD+C: New Construction?

  • A. Storage and Collection of Recyclables
  • B. Construction and Demolition Waste Management Planning
  • C. Building Life-Cycle Impact Reduction
  • D. Planning for Zero Waste Operations
Answer and explanation

Answer: D. Planning for Zero Waste Operations

v5 BD+C:NC has two MR prerequisites: Planning for Zero Waste Operations and Quantify and Assess Embodied Carbon. The other three names are from v4.1.

  • Why not A: That was the v4.1 prerequisite name.
  • Why not B: That was a v4.1 prerequisite; in v5, C&D waste diversion is a credit.
  • Why not C: That was a v4.1 credit.

Review topic: v5 MR prerequisites. Source: USGBC, LEED v5 BD+C — Rating-system scorecard; USGBC, LEED v4.1 BD+C guide (historical)

Question 68

Materials and Resources · Recall · ID GA5-MR-05

In LEED v5 BD+C, which credit category contains the Low-Emitting Materials credit?

  • A. Indoor Environmental Quality
  • B. Sustainable Sites
  • C. Materials and Resources
  • D. Project Priorities
Answer and explanation

Answer: C. Materials and Resources

v5 BD+C lists Low-Emitting Materials as an MR credit. That project-credit category is different from the exam's topic map: the current Green Associate handbook still lists low-emitting materials under Indoor Environmental Quality. A current EQ practice question about emissions is not automatically outdated.

  • Why not A: That was the v4.1 BD+C credit category. The current exam still covers low-emitting materials in EQ, but this question asks for the v5 BD+C credit category.
  • Why not B: Unrelated category.
  • Why not D: Project Priorities covers regional, pilot and exemplary credits.

Review topic: v5 category changes. Source: USGBC, LEED v5 BD+C — Rating-system scorecard; USGBC, LEED v4.1 BD+C guide (historical); GBCI, LEED Green Associate Candidate Handbook (current LEED v5)

Question 69

Materials and Resources · Recall · ID GA5-MR-06

A specifier wants to know what chemicals are in a product and their associated health information. Which document is designed for that?

  • A. An Environmental Product Declaration (EPD)
  • B. A LEED certification plaque
  • C. A REC
  • D. A Health Product Declaration (HPD)
Answer and explanation

Answer: D. A Health Product Declaration (HPD)

HPDs report product contents and associated health information. EPDs report LCA-based environmental impacts within declared boundaries. Disclosure documents inform decisions; neither one certifies a product as safe.

  • Why not A: EPDs report life-cycle environmental impacts, such as global warming potential, not ingredient health information.
  • Why not B: Plaques apply to buildings, not products.
  • Why not C: RECs relate to renewable electricity, not product contents.

Review topic: EPDs and HPDs. Source: HPD Collaborative, HPD Open Standard; NIST Technical Note 2353 (EPD database and LCI data gaps, Sept 2025)

Question 70

Materials and Resources · Application · ID GA5-MR-07

A design team can either drop an unnecessary decorative finish or install it and recycle the offcuts. Which choice prevents waste rather than managing it?

  • A. Dropping the unnecessary finish
  • B. Installing it and recycling the offcuts
  • C. Installing it and sending offcuts to landfill
  • D. Ordering extra material so more can be recycled
Answer and explanation

Answer: A. Dropping the unnecessary finish

Source reduction, meaning not using material in the first place, sits above reuse and recycling because it avoids both the waste and the impacts of making the material.

  • Why not B: Recycling manages waste after it's created.
  • Why not C: Landfilling is the least preferred option.
  • Why not D: Buying more to recycle more increases waste.

Review topic: Waste hierarchy. Source: EPA, Sustainable Management of Construction and Demolition Materials

Question 71

Materials and Resources · Application · ID GA5-MR-08

During a renovation, solid wood doors in good condition are carefully removed and installed in another project. What's this an example of?

  • A. Recycling
  • B. Landfill disposal
  • C. Deconstruction for reuse
  • D. Demolition debris diversion by crushing
Answer and explanation

Answer: C. Deconstruction for reuse

Reuse keeps a product in its original form and function, which generally saves more resources than recycling. Careful deconstruction is what makes reuse possible.

  • Why not A: Recycling breaks materials down into raw material; these doors stay intact.
  • Why not B: The doors are being kept in use.
  • Why not D: Crushing destroys the doors' original form.

Review topic: Reuse vs. recycling. Source: EPA, Sustainable Management of Construction and Demolition Materials

Question 72

Materials and Resources · Application · ID GA5-MR-09

A project's construction waste streams, by weight: 18 tons reused, 27 tons recycled and 15 tons landfilled. There are no other streams. What percentage was kept out of the landfill?

  • A. 25%
  • B. 45%
  • C. 75%
  • D. 300%
Answer and explanation

Answer: C. 75%

Total waste = 18 + 27 + 15 = 60 tons. Kept from landfill = 18 + 27 = 45 tons. 45 ÷ 60 = 75%. This is an exercise ratio, not a LEED credit calculation.

  • Why not A: That's the landfilled share (15 ÷ 60).
  • Why not B: 45 is the tonnage kept from landfill, not the percentage.
  • Why not D: That divides 45 by 15 instead of by the total.

Review topic: Diversion calculation. Source: EPA, Sustainable Management of Construction and Demolition Materials

Question 73

Materials and Resources · Application · ID GA5-MR-10

A supplier offers a paint's "low-VOC content" label as proof for LEED v5 BD+C's Low-Emitting Materials credit. What does the v5 credit actually look for?

  • A. The VOC content label is enough by itself
  • B. VOC emissions testing results, from a third-party certification or qualified lab report
  • C. Proof that the paint has recycled content
  • D. A lack of noticeable odor
Answer and explanation

Answer: B. VOC emissions testing results, from a third-party certification or qualified lab report

v5 bases compliance on VOC emissions testing (to the CDPH standard method), shown by third-party certification or a qualified lab report. How much VOC is in the can and how much it emits into the room are different questions.

  • Why not A: The v5 credit is based on emissions testing, not content claims.
  • Why not C: Recycled content doesn't show emissions performance.
  • Why not D: Odor isn't a reliable measure of emissions.

Review topic: Low-emitting materials evidence. Source: USGBC, LEED v5 BD+C — Low-Emitting Materials

Question 74

Materials and Resources · Recall · ID GA5-MR-11

What's the difference between embodied carbon and operational carbon?

  • A. Embodied carbon comes from running the building; operational carbon comes from materials
  • B. They're the same thing measured in different units
  • C. Renewable electricity eliminates embodied carbon already emitted
  • D. Embodied carbon comes from materials and construction over their life cycle; operational carbon comes from running the building
Answer and explanation

Answer: D. Embodied carbon comes from materials and construction over their life cycle; operational carbon comes from running the building

Embodied carbon covers emissions associated with construction materials over their life cycle, including manufacturing, transport, installation, maintenance and disposal; operational carbon covers emissions from energy use and refrigerants during operation. v5 requires embodied carbon accounting on every BD+C project, alongside its operational carbon planning. Its MR prerequisite uses a defined cradle-to-gate (A1-A3) boundary, which is narrower than the full embodied-carbon life cycle.

  • Why not A: That swaps the two terms.
  • Why not B: They cover different emission sources.
  • Why not C: Renewable power affects future operations, not emissions that already happened in manufacturing.

Review topic: Embodied vs. operational carbon. Source: USGBC, LEED v5 BD+C — Rating-system scorecard and impact areas; USGBC, LEED v5 BD+C — Quantify and Assess Embodied Carbon; GSA, Embodied carbon: next steps for GSA

Indoor Environmental Quality (11 questions)

Question 75

Indoor Environmental Quality · Recall · ID GA5-EQ-01

Under LEED v5 BD+C's No Smoking or Vehicle Idling prerequisite, what is the minimum required separation between a designated outdoor smoking area and entries, outdoor air intakes and operable windows on a non-school project (unless local code limits the distance)?

  • A. At least 10 feet (3 meters)
  • B. At least 25 feet (7.5 meters)
  • C. At least 50 feet (15 meters)
  • D. At least 100 feet (30 meters)
Answer and explanation

Answer: B. At least 25 feet (7.5 meters)

Designated outdoor smoking areas must be at least 25 feet (7.5 meters) from entries, outdoor air intakes and operable windows, or as far as local codes allow.

  • Why not A: Too close.
  • Why not C: Fifty feet exceeds the stated minimum; it is not the minimum the question asks for.
  • Why not D: One hundred feet exceeds the stated minimum; it is not the minimum the question asks for.

Review topic: No smoking. Source: USGBC, LEED v5 BD+C — No Smoking or Vehicle Idling

Question 76

Indoor Environmental Quality · Application · ID GA5-EQ-02

Which requirement is new in LEED v5 BD+C's version of the smoking-control prerequisite?

  • A. Prohibiting vehicle idling on site
  • B. Allowing smoking inside private offices
  • C. Removing all outdoor smoking rules
  • D. Permitting smoking on school grounds
Answer and explanation

Answer: A. Prohibiting vehicle idling on site

v5 renamed the prerequisite No Smoking or Vehicle Idling and added an on-site vehicle-idling prohibition, communicated to occupants with enforcement or signage. In v4.1 it was Environmental Tobacco Smoke Control.

  • Why not B: Indoor smoking is prohibited.
  • Why not C: Outdoor smoking rules remain.
  • Why not D: School projects prohibit all smoking on site.

Review topic: Vehicle idling. Source: USGBC, LEED v5 BD+C — No Smoking or Vehicle Idling; USGBC, LEED v5 BD+C — Rating-system scorecard; USGBC, LEED v4.1 BD+C guide (historical)

Question 77

Indoor Environmental Quality · Application · ID GA5-EQ-03

Occupants complain about fumes from a cleaning product stored in an open supply room. The product can be replaced with a less hazardous one. What's the most effective first step?

  • A. Add air freshener to mask the smell
  • B. Remove or replace the source of the fumes
  • C. Increase the room's lighting
  • D. Install a particle filter and assume gases are handled
Answer and explanation

Answer: B. Remove or replace the source of the fumes

EPA describes source control as usually the most effective way to improve indoor air quality. Removing or reducing the source beats diluting or masking it.

  • Why not A: Masking adds more chemicals without removing the source.
  • Why not C: Lighting doesn't affect air contaminants.
  • Why not D: Particle filters don't remove most gases.

Review topic: Source control. Source: EPA, Improving Indoor Air Quality

Question 78

Indoor Environmental Quality · Recall · ID GA5-EQ-04

Which areas must the construction management practices in LEED v5 BD+C's Construction Management prerequisite address?

  • A. Only dust control at the property line
  • B. Only the final cleaning before occupancy
  • C. Only noise limits for neighbors
  • D. No smoking, extreme heat protection, HVAC protection, source control, pathway interruption, housekeeping and scheduling
Answer and explanation

Answer: D. No smoking, extreme heat protection, HVAC protection, source control, pathway interruption, housekeeping and scheduling

The v5 prerequisite lists those seven areas for the construction and preoccupancy phases. Its intent covers both construction workers and future occupants.

  • Why not A: The prerequisite covers much more than dust.
  • Why not B: Practices cover construction and preoccupancy.
  • Why not C: Noise isn't one of the listed areas.

Review topic: Construction management. Source: USGBC, LEED v5 BD+C — Construction Management

Question 79

Indoor Environmental Quality · Analysis · ID GA5-EQ-05

Wildfire smoke is making outdoor air quality poor at an office building, and occupants ask to open windows for "fresh air." What's the sound approach?

  • A. Open all windows, since outdoor air is always better
  • B. Shut off all ventilation for the rest of the year
  • C. Have the facilities team follow its smoke-response plan, check air conditions, and adjust ventilation and filtration for the event
  • D. Use a thermometer to decide
Answer and explanation

Answer: C. Have the facilities team follow its smoke-response plan, check air conditions, and adjust ventilation and filtration for the event

EPA's commercial-building guidance calls for smoke-event planning, indoor and outdoor air monitoring, appropriate HVAC and filtration adjustments, and keeping windows closed when outdoor smoke threatens indoor air. Settings depend on the building and event; the facilities team should follow its response plan. v5's climate resilience assessment explicitly lists wildfire smoke as a hazard to consider.

  • Why not A: Outdoor air can be worse than indoor air during a smoke event.
  • Why not B: That ignores normal ventilation needs.
  • Why not D: Temperature doesn't measure smoke.

Review topic: Ventilation with outdoor smoke. Source: EPA, Wildfires and Indoor Air Quality in Schools and Commercial Buildings; USGBC, LEED v5 BD+C — Climate Resilience Assessment

Question 80

Indoor Environmental Quality · Recall · ID GA5-EQ-06

What does a higher MERV rating on an air filter indicate?

  • A. The filter is better at capturing particles in the tested size ranges
  • B. The filter lasts longer between changes
  • C. The filter removes gases and odors
  • D. The filter uses less fan energy
Answer and explanation

Answer: A. The filter is better at capturing particles in the tested size ranges

Minimum Efficiency Reporting Value (MERV) reports how well a filter captures particles between 0.3 and 10 microns. The higher the MERV, the better it traps those particle sizes.

  • Why not B: MERV measures capture efficiency, not service life.
  • Why not C: MERV rates particle capture, not gases.
  • Why not D: MERV measures particle-capture efficiency, not fan-energy consumption.

Review topic: Filtration. Source: EPA, What is a MERV rating?

Question 81

Indoor Environmental Quality · Application · ID GA5-EQ-07

Workers near a west-facing window enjoy the daylight but complain about direct glare and afternoon overheating. What should the team look at?

  • A. Adding more glazing, since more daylight is always better
  • B. Shading and glare control, along with thermal comfort, rather than simply adding more glass
  • C. Measuring only light levels at the desk
  • D. Blocking the window permanently
Answer and explanation

Answer: B. Shading and glare control, along with thermal comfort, rather than simply adding more glass

Daylight is valuable, but it has to be balanced with glare control and thermal comfort. The current exam specifications list glare control alongside daylight under lighting.

  • Why not A: More glass can make glare and heat worse.
  • Why not C: Light level alone doesn't capture glare or overheating.
  • Why not D: That gives up daylight and views rather than balancing them with glare control and thermal comfort.

Review topic: Daylight and glare. Source: GBCI, LEED Green Associate Candidate Handbook (current LEED v5); USGBC, LEED v5 BD+C — Occupant Experience and Accessibility and Inclusion

Question 82

Indoor Environmental Quality · Application · ID GA5-EQ-08

A confidential meeting room sits next to a noisy open collaboration area. What should the design address?

  • A. Sound isolation and acoustic privacy matched to how the meeting room is used
  • B. One sound target applied identically to every room
  • C. Brighter lighting in the meeting room
  • D. The building's energy score
Answer and explanation

Answer: A. Sound isolation and acoustic privacy matched to how the meeting room is used

Acoustic design depends on the use of each space. A confidential room needs noise isolation from its neighbors; the exam specifications list acoustics and noise isolation under sound.

  • Why not B: Different spaces have different acoustic needs.
  • Why not C: Lighting doesn't change sound transmission.
  • Why not D: Energy performance doesn't measure acoustics.

Review topic: Acoustics. Source: GBCI, LEED Green Associate Candidate Handbook (current LEED v5); USGBC, LEED v5 BD+C — Occupant Experience and Accessibility and Inclusion

Question 83

Indoor Environmental Quality · Recall · ID GA5-EQ-09

Which design feature is an example of biophilic design?

  • A. Buying renewable energy certificates
  • B. Lowering refrigerant global warming potential
  • C. Views of outdoor greenery and live plants in occupied spaces
  • D. Submetering domestic water
Answer and explanation

Answer: C. Views of outdoor greenery and live plants in occupied spaces

Biophilic design connects people with nature through things like live plants, natural materials and views. The current exam specifications list adaptable environments, live plants and quality of views under biophilic design.

  • Why not A: RECs relate to energy, not occupant connection with nature.
  • Why not B: That's a climate strategy.
  • Why not D: That's a water management strategy.

Review topic: Biophilic design. Source: GBCI, LEED Green Associate Candidate Handbook (current LEED v5); USGBC, LEED v5 BD+C — Occupant Experience and Accessibility and Inclusion

Question 84

Indoor Environmental Quality · Analysis · ID GA5-EQ-10

A design meets baseline accessibility code requirements, but user feedback identifies wayfinding and sensory barriers for some occupants. What does LEED v5 BD+C's Accessibility and Inclusion credit encourage?

  • A. Nothing more, because code minimums guarantee universal usability
  • B. Ignoring feedback from affected users
  • C. Adding one decorative feature and calling it complete
  • D. Evaluating additional inclusive design strategies to address those barriers
Answer and explanation

Answer: D. Evaluating additional inclusive design strategies to address those barriers

v5 adds Accessibility and Inclusion as an EQ credit, encouraging design that goes beyond minimum code requirements. The exam specifications list inclusive design under that topic.

  • Why not A: Meeting code doesn't remove every barrier people experience.
  • Why not B: Their feedback is what identified the barriers.
  • Why not C: A single feature doesn't address wayfinding and sensory needs.

Review topic: Accessibility and inclusion. Source: USGBC, LEED v5 BD+C — Rating-system scorecard; USGBC, LEED v5 BD+C — Occupant Experience and Accessibility and Inclusion; GBCI, LEED Green Associate Candidate Handbook (current LEED v5)

Question 85

Indoor Environmental Quality · Application · ID GA5-EQ-11

A K-12 school project proposes a designated outdoor smoking area 40 feet from all doors, air intakes and windows. Does it meet LEED v5 BD+C's No Smoking or Vehicle Idling prerequisite?

  • A. Yes, because 40 feet is more than the 25-foot minimum
  • B. Yes, if signs are posted
  • C. No; school projects must prohibit all smoking on site
  • D. Yes, if the area is covered
Answer and explanation

Answer: C. No; school projects must prohibit all smoking on site

The v5 prerequisite has a specific rule for schools: prohibit all smoking on site. The 25-foot distance applies to designated smoking areas on other project types.

  • Why not A: The 25-foot rule applies to other project types; schools prohibit smoking on site entirely.
  • Why not B: Signage doesn't make on-site smoking acceptable at a school.
  • Why not D: Covering the area doesn't change the school rule.

Review topic: Smoking on school sites. Source: USGBC, LEED v5 BD+C — No Smoking or Vehicle Idling

Answer key

Use this to score a full run quickly. The explanation under each question tells you why, which matters more than the letter.

Answer key
#Answer#Answer#Answer#Answer#Answer
1B2D3A4C5D
6C7A8B9C10D
11B12A13D14B15A
16C17B18C19D20A
21B22A23C24D25C
26B27D28A29C30B
31A32D33C34B35A
36D37B38A39C40B
41D42C43D44A45B
46C47D48A49B50A
51D52C53A54C55A
56B57D58B59C60D
61C62A63B64D65B
66A67D68C69D70A
71C72C73B74D75B
76A77B78D79C80A
81B82A83C84D85C

Tally your results by topic area

Tally your results by topic area
Topic areaQuestionsNumber in setYour correct
LEED Process1-1515Blank
Integrative Process Planning and Assessments16-216Blank
Location and Transportation22-309Blank
Sustainable Sites31-388Blank
Water Efficiency39-4810Blank
Energy and Atmosphere49-6315Blank
Materials and Resources64-7411Blank
Indoor Environmental Quality75-8511Blank
TotalBlank85Blank

What your score means

Your percentage tells you how you did on these 85 practice questions. It isn't an official score, it can't be converted to one, and it doesn't predict whether you'll pass.

The real exam is scored on a scale from 125 to 200, and you need 170 or higher to pass (GBCI Candidate Handbook, Exam Results). A scaled score isn't a simple percentage of questions answered correctly, so there's no honest way to turn "68 out of 85" into a number on that scale.

For a manual tally, record your first answer before opening its explanation. Keep four counts: C for independently correct, W for independently wrong, R for an explanation opened before answering, and U for unanswered; together they total 85.

Your independent-correct percentage across the set is 100 × C ÷ 85. Accuracy among independently answered questions is 100 × C ÷ (C + W), but only when you have answered at least one independently. For example, 20 correct and 5 wrong is 23.5% independently correct across the full set and 80% among the 25 independently answered questions; the remaining 60 questions are revealed-first or unanswered, not silently counted as wrong. Keep those counts beside either percentage.

The topic tallies are more useful than the total. Even so, six or nine questions is a small sample. Treat a weak area as a place to review, not a verdict on what you know.

How this set lines up with the current exam

GBCI's exam outline lists question counts for eight topic areas. We wrote exactly that many questions for each one.

How this set lines up with the current exam
Topic areaQuestions on the official outlineQuestions in this set
LEED Process1515
Integrative Process Planning and Assessments66
Location and Transportation99
Sustainable Sites88
Water Efficiency1010
Energy and Atmosphere1515
Materials and Resources1111
Indoor Environmental Quality1111
Total8585

Source: GBCI Candidate Handbook, Exam specifications (current LEED v5 handbook; checked October 14, 2026).

Two things to know about that match:

  • The real exam has 100 questions. The outline's counts add up to 85. The handbook confirms that scored and unscored questions are mixed together and not identified, so answer everything (handbook, Exam format). The current handbook doesn't print the number of unscored questions.
  • Same topic mix, not the same exam. Matching the counts reproduces the published domain allocation, not every subtopic or the depth of the official exam. It doesn't make this set a copy of the real exam's difficulty or wording, and it isn't a validated readiness test. Each question has four options; the handbook says each real question has one correct answer but doesn't specify how many options it has.

The questions use the outline's three thinking levels: recall (know the fact), application (use it in a new situation) and analysis (break a problem into its parts). About a third are recall, a little over half are application and the rest are analysis. That mix is our editorial choice; GBCI doesn't publish one.

What changed from LEED v4 to v5 (and how to spot outdated questions)

The Green Associate exam switched to LEED v5 in 2026. The last day to take the v4 exam was April 26, 2026, and the final v5 exam became available in September 2026 (USGBC, LEED v5 exam information). Check that a resource uses the current exam outline and keeps historical credit comparisons separate from current rules.

The topic areas changed

The topic areas changed
v4-era handbook (2018 edition)QuestionsCurrent v5 handbook (checked October 2026)Questions
LEED Process16LEED Process15
Integrative Strategies8Integrative Process Planning and Assessments6
Location and Transportation7Location and Transportation9
Sustainable Sites7Sustainable Sites8
Water Efficiency9Water Efficiency10
Energy and Atmosphere10Energy and Atmosphere15
Materials and Resources9Materials and Resources11
Indoor Environmental Quality8Indoor Environmental Quality11
Project Surroundings and Public Outreach11(no longer a separate topic area)Blank

Sources: 2018 handbook, Exam Specifications pp. 11-13 (archived copy); current handbook.

The biggest shifts: Project Surroundings and Public Outreach is gone as its own area, and Energy and Atmosphere grew from 10 to 15 questions. The official references changed too. The current list is the LEED Core Concepts Guide, 5th edition (2026); Foundations of LEED; the Guide to LEED Certification: Commercial; and USGBC's rating system selection guidance.

Red flags in a practice question

These are project-rating-system changes, not automatic tests of whether a practice bank is current. Check the named version and project type; historical names can be valid distractors or comparison examples.

Red flags in a practice question
Older wordingWhat LEED v5 BD+C: New Construction uses
Separate "Innovation" and "Regional Priority" categoriesProject Priorities, which covers regional priority, project-type, exemplary performance, pilot credits and innovative strategies, plus a separate LEED AP point
Low-Emitting Materials as an Indoor Environmental Quality creditLow-Emitting Materials as a Materials and Resources credit; the current exam still lists the topic under EQ
Construction Activity Pollution Prevention prerequisiteMinimize Site Disturbance prerequisite
Environmental Tobacco Smoke Control prerequisiteNo Smoking or Vehicle Idling prerequisite
Surrounding Density and Diverse Uses, Access to Quality Transit and similar separate location creditsCompact and Connected Development
Integrative Process as a credit in v4.1 New ConstructionThree required assessments (climate resilience, human impact, carbon) plus an Integrative Design Process credit
No operational carbon or embodied carbon prerequisitesOperational Carbon Projection and Decarbonization Plan and Quantify and Assess Embodied Carbon are both prerequisites
Treating 80 points as the only Platinum conditionApplicable prerequisites always matter; v5 adds credit-level Platinum requirements, including 100% of site energy from eligible renewables for BD+C: New Construction

Sources: USGBC, LEED v4.1 BD+C guide, historical contents and scorecard; USGBC, LEED v5 BD+C scorecard; v5 Platinum requirements, Appendix I; current exam specifications.

Older material isn't useless. Concepts like site selection, water efficiency, commissioning and indoor air quality carry over. Just don't memorize old credit names, categories or topic weights.

If you earned your Green Associate credential under v4 and keep it in good standing, you don't need to retest for v5; you keep it through credential maintenance (USGBC, LEED v5 exam information).

LEED Green Associate exam facts

Checked October 14, 2026, against GBCI's handbook and USGBC's Help Center.

LEED Green Associate exam facts
Row labelCurrent rule
Rating system testedLEED v5
Questions100 multiple choice, one correct answer each; scored and unscored questions are mixed together and not marked
Time2 hours; plan on 2 hours 20 minutes in total
During the examYou can skip questions, flag them and change answers. Closed book.
ScoringScale of 125-200; 170 or higher passes; your score appears on screen when you finish
FeeUS$250; US$200 for USGBC members; US$100 for verified college students. One registration covers one attempt.
WhereA Prometric test center, or online with remote proctoring through Prometric's ProProctor
LanguageEnglish only. Arabic, Simplified Chinese and Spanish versions are expected in 2027.
UnitsImperial shown first, metric in parentheses
Who can take itNo education or work-experience prerequisite is stated. Candidates must meet the handbook's policy-consent and identification requirements; those under 18 need parent or guardian consent. GBCI recommends some exposure to LEED and green building first.
RetakesRegister and pay again for each attempt. After three unsuccessful attempts within 12 months of the first unsuccessful attempt, wait 90 calendar days after the third before registering again.
After you passMaintain the credential every 2 years by earning and reporting continuing education hours

Sources: GBCI Candidate Handbook (Exam version, Exam format, Exam Results, Registration process, Credential maintenance program); About the LEED Green Associate exam; Preparing for the LEED Green Associate exam.

Pacing

The real exam gives you 120 minutes for 100 questions: about 72 seconds per question. At that pace, all 85 questions here take about 102 minutes (85 × 72 seconds = 6,120 seconds). To rehearse timing, set a timer for 102 minutes and work through without opening the explanations, then score with the answer key.

Turn missed questions into your next study session

This takes about 20 to 30 minutes after a full run.

  1. Sort your misses (5 minutes). Go through every question you missed or guessed. Mark each one: didn't know the term, misread the scenario, or set up the math wrong. Those need different fixes.
  2. Fix the principle (10 to 15 minutes). Pick the two or three topic areas with the most misses. Read each explanation and its source, then write the rule in your own words. For calculations, write the units and the baseline before doing any arithmetic.
  3. Retest without the key (5 to 10 minutes). Answer those questions again, and say out loud why each wrong option is wrong. Remembering the letter isn't the same as knowing the concept.

Come back to the full set after a few days of study. A better second score on the same questions partly reflects memory, so lean on the "why not" explanations rather than the total.

For deeper study, use the official references named in the handbook's Exam references section. Use the handbook's reference list and exam specifications together. The project-credit examples here cite USGBC's July 2026 rating-system text; that is not a claim that every July requirement appears on the exam. The handbook states that annual exam maintenance includes addenda through January of the same year.

Quick answers

Are these real exam questions? No. We wrote all 85. GBCI's exam questions are confidential: candidates agree not to share or reproduce them (handbook, Exam security). Be wary of any site that claims to have them.

Is there a printable version? For a paper copy, open the explanations you need, then use your browser's print preview and check the pages before printing or saving them. There is no separate PDF download.

Where do I register? Through the Credentials section of your USGBC account, then schedule with Prometric (handbook, Registering for your exam).

Sources and independence

By Castleport Test Prep Editorial Team.

Last verified: October 14, 2026. We checked the exam version, format, scoring, fees, topic areas and question counts against GBCI's current Candidate Handbook and USGBC's Help Center on that date. Each question's explanation names the source for its answer.

How we made this set: the questions were developed with AI-assisted research and drafting, mapped to GBCI's published exam outline, and checked against the LEED v5 credit language, government sources (EPA, GSA and DOE) and standard owners linked in each explanation. Source checking isn't the same as review by a LEED professional; this set has not received that professional review. See our methodology and editorial standards. If you think an answer is wrong, tell us and we'll recheck it.

Official sources

Castleport Test Prep is an independent exam prep publisher. We're not affiliated with, endorsed by, or approved by Green Business Certification Inc. (GBCI) or the U.S. Green Building Council (USGBC). LEED and LEED Green Associate are named here only to identify the exam; trademarks belong to their respective owners. These practice questions are original and unofficial. This resource doesn't guarantee an exam result or a credential.

Free LEED Green Associate Practice Test: 85 v5 Questions