NHIE Exam Prep: Free Study Guide and 40 Practice Questions
Castleport Test Prep Editorial Team · Last verified October 4, 2026
The NHIE is 200 multiple-choice questions in 4 hours, and EBPHI's current outline puts 70% on inspecting the house, 20% on reporting, and 10% on professional responsibilities. Start with the 40 original questions below, weighted the same way, then use your misses to steer the four-week plan.
Start here: 40-question NHIE diagnostic
Original Castleport practice, not official NHIE questions. Your percentage on this set is feedback on these 40 items, not an NHIE score or a prediction of passing. Pick one answer per question, then check the explanation, even when you got it right. At the real exam's average pace (240 minutes ÷ 200 questions = 72 seconds each), this set takes about 48 minutes.
Domain 1 · Property and Building Inspection/Site Review (28 questions)
Question 1 · Grading and drainage
NHIE-D1-01 · Task 1: Site conditions
On the north side of a house, the soil slopes toward the foundation. On the inside of that same basement wall, you see white, powdery mineral deposits on the block. What is the BEST way to report this?
Show explanation for Question 1
Answer: B. White powdery deposits on masonry are consistent with moisture moving through the wall and evaporating. The negative grade is a separate drainage defect that can direct surface water toward the foundation, but the deposits alone do not prove that grading is the only moisture source. B reports both observed conditions without overstating causation and gives a sensible first correction. The IRC expects finished grade to fall away from the house (6 inches within the first 10 feet, with an exception where physical barriers prevent that slope). A ignores a drainage defect. C jumps to one repair method before the source is established. D overstates what was observed.
Source: International Residential Code (IRC), 2021, Section R401.3 (drainage); EBPHI content outline in PSI's NHIE candidate bulletin (updated 12/10/2024), Domain 1, Task 1A (negative grade, poor drainage); ASHI Standard of Practice for Home Inspections (effective March 1, 2014; current version), 2.2.B and 13.2.A.5; ASHI Code of Ethics, 2.B.
Answer: B. White powdery deposits on masonry are consistent with moisture moving through the wall and evaporating. The negative grade is a separate drainage defect that can direct surface water toward the foundation, but the deposits alone do not prove that grading is the only moisture source. B reports both observed conditions without overstating causation and gives a sensible first correction. The IRC expects finished grade to fall away from the house (6 inches within the first 10 feet, with an exception where physical barriers prevent that slope). A ignores a drainage defect. C jumps to one repair method before the source is established. D overstates what was observed.
Source: International Residential Code (IRC), 2021, Section R401.3 (drainage); EBPHI content outline in PSI's NHIE candidate bulletin (updated 12/10/2024), Domain 1, Task 1A (negative grade, poor drainage); ASHI Standard of Practice for Home Inspections (effective March 1, 2014; current version), 2.2.B and 13.2.A.5; ASHI Code of Ethics, 2.B.
Question 2 · Earth-to-wood contact
NHIE-D1-02 · Task 1: Site conditions
Painted wood lap siding on an older house ends about 1 inch above the soil in a raised flower bed. What should the inspector report?
Show explanation for Question 2
Answer: C. Wood that sits close to soil stays damp, which invites decay and gives insects an easy path in. The IRC requires extra protection, such as decay-resistant or treated wood, when siding is less than 6 inches from the ground. EBPHI's outline names earth-to-wood contact as a typical site defect. A treats paint as protection it isn't. B prescribes a product rather than reporting the condition. D confuses identifying wood-destroying insects, which is outside a standard home inspection, with reporting a visible clearance problem, which is inside it.
Source: International Residential Code (IRC), 2021, Section R317.1 (protection of wood against decay); EBPHI content outline in PSI's NHIE candidate bulletin (updated 12/10/2024), Domain 1, Task 1A (earth to wood contact).
Answer: C. Wood that sits close to soil stays damp, which invites decay and gives insects an easy path in. The IRC requires extra protection, such as decay-resistant or treated wood, when siding is less than 6 inches from the ground. EBPHI's outline names earth-to-wood contact as a typical site defect. A treats paint as protection it isn't. B prescribes a product rather than reporting the condition. D confuses identifying wood-destroying insects, which is outside a standard home inspection, with reporting a visible clearance problem, which is inside it.
Source: International Residential Code (IRC), 2021, Section R317.1 (protection of wood against decay); EBPHI content outline in PSI's NHIE candidate bulletin (updated 12/10/2024), Domain 1, Task 1A (earth to wood contact).
Question 3 · Deck guards
NHIE-D1-03 · Task 2: Exterior
The walking surface at the open edge of a rear deck is 34 inches above the patio below. There is no guard. Under the IRC, what is correct?
Show explanation for Question 3
Answer: A. Under the IRC, guards are required along open-sided walking surfaces more than 30 inches above the floor or grade below (measured within 36 inches horizontally of the edge). A 34-inch drop crosses that line, and required guards must be at least 36 inches high, with openings that won't pass a 4-inch sphere. B uses a number that doesn't appear in the rule. C mixes up the stair-handrail rule with the guard rule. D treats a stair handrail as a substitute for a guard along the deck edge, which it isn't.
Source: International Residential Code (IRC), 2021, Sections R312.1.1 and R312.1.2; EBPHI content outline in PSI's NHIE candidate bulletin (updated 12/10/2024), Domain 1, Task 2C (decks, railings).
Answer: A. Under the IRC, guards are required along open-sided walking surfaces more than 30 inches above the floor or grade below (measured within 36 inches horizontally of the edge). A 34-inch drop crosses that line, and required guards must be at least 36 inches high, with openings that won't pass a 4-inch sphere. B uses a number that doesn't appear in the rule. C mixes up the stair-handrail rule with the guard rule. D treats a stair handrail as a substitute for a guard along the deck edge, which it isn't.
Source: International Residential Code (IRC), 2021, Sections R312.1.1 and R312.1.2; EBPHI content outline in PSI's NHIE candidate bulletin (updated 12/10/2024), Domain 1, Task 2C (decks, railings).
Question 4 · Garage vehicle doors
NHIE-D1-04 · Task 2: Exterior
You test an automatic garage door opener. When the door's path is blocked, the door keeps closing instead of reversing. What is the BEST response?
Show explanation for Question 4
Answer: D. A door that won't reverse when obstructed can crush a person or pet. EBPHI's outline lists malfunctioning obstruction sensors and improper automatic-reverse adjustment as common safety issues, and ASHI's standard includes garage door operators in the inspection. The inspector's job is to report it clearly and refer it out. A downplays a safety issue. B turns the inspector into the repair person. C excuses a safety defect because of the opener's age.
Source: EBPHI content outline in PSI's NHIE candidate bulletin (updated 12/10/2024), Domain 1, Task 2D (garage vehicle doors and operators); ASHI Standard of Practice for Home Inspections (effective March 1, 2014; current version), 10.1.E and 2.2.B.
Answer: D. A door that won't reverse when obstructed can crush a person or pet. EBPHI's outline lists malfunctioning obstruction sensors and improper automatic-reverse adjustment as common safety issues, and ASHI's standard includes garage door operators in the inspection. The inspector's job is to report it clearly and refer it out. A downplays a safety issue. B turns the inspector into the repair person. C excuses a safety defect because of the opener's age.
Source: EBPHI content outline in PSI's NHIE candidate bulletin (updated 12/10/2024), Domain 1, Task 2D (garage vehicle doors and operators); ASHI Standard of Practice for Home Inspections (effective March 1, 2014; current version), 10.1.E and 2.2.B.
Question 5 · Roof flashings
NHIE-D1-05 · Task 3: Roof
A lower roof edge ends against the wall of a two-story section. Nothing turns the roof water away from the wall at that spot, and the siding below the intersection is stained and soft. Which component is MOST likely missing?
Show explanation for Question 5
Answer: A. Where a roof edge meets a sidewall, step flashing carries water down the wall. At the bottom, a kickout (diverter) flashing turns that water into the gutter instead of letting it run down and behind the siding. Stained, soft siding right below that spot is the classic sign it's missing; the IRC calls for kickout flashing at these intersections. A rake drip edge protects a different edge. A ridge vent is ventilation, not water diversion. Ice barrier protects the eaves against ice dams, not a sidewall intersection.
Source: International Residential Code (IRC), 2021, Section R903.2.1 (flashing locations); EBPHI content outline in PSI's NHIE candidate bulletin (updated 12/10/2024), Domain 1, Task 3C (roof flashings).
Answer: A. Where a roof edge meets a sidewall, step flashing carries water down the wall. At the bottom, a kickout (diverter) flashing turns that water into the gutter instead of letting it run down and behind the siding. Stained, soft siding right below that spot is the classic sign it's missing; the IRC calls for kickout flashing at these intersections. A rake drip edge protects a different edge. A ridge vent is ventilation, not water diversion. Ice barrier protects the eaves against ice dams, not a sidewall intersection.
Source: International Residential Code (IRC), 2021, Section R903.2.1 (flashing locations); EBPHI content outline in PSI's NHIE candidate bulletin (updated 12/10/2024), Domain 1, Task 3C (roof flashings).
Question 6 · Roof penetrations
NHIE-D1-06 · Task 3: Roof
The rubber collar around a plumbing vent pipe on an asphalt shingle roof is cracked and pulling away from the pipe. In the attic, the roof sheathing around that pipe is stained. What is the BEST report?
Show explanation for Question 6
Answer: C. EBPHI's outline lists a deteriorated boot or collar as a typical defect at roof penetrations. A cracked boot directly above stained sheathing is a strong link between a cause and its effect, so C reports both and refers them out. A is wrong because plumbing vents serve the drain system and aren't optional. B dismisses evidence the inspector can't date. D recommends far more than the observation supports and isn't the inspector's call.
Source: EBPHI content outline in PSI's NHIE candidate bulletin (updated 12/10/2024), Domain 1, Task 3D (skylights and other roof penetrations); ASHI Standard of Practice for Home Inspections (effective March 1, 2014; current version), 2.2.B.
Answer: C. EBPHI's outline lists a deteriorated boot or collar as a typical defect at roof penetrations. A cracked boot directly above stained sheathing is a strong link between a cause and its effect, so C reports both and refers them out. A is wrong because plumbing vents serve the drain system and aren't optional. B dismisses evidence the inspector can't date. D recommends far more than the observation supports and isn't the inspector's call.
Source: EBPHI content outline in PSI's NHIE candidate bulletin (updated 12/10/2024), Domain 1, Task 3D (skylights and other roof penetrations); ASHI Standard of Practice for Home Inspections (effective March 1, 2014; current version), 2.2.B.
Question 7 · Notched floor joists
NHIE-D1-07 · Task 4: Structure
In a basement, a 2x10 floor joist spanning 12 feet has a 2-inch-deep notch cut in its bottom edge near the middle of the span to make room for a drain pipe. What is correct?
Show explanation for Question 7
Answer: B. Bending stress is highest near midspan, so the IRC bans notches in the middle third of a sawn-lumber joist. This notch is also too deep: a 2x10 is actually about 9.25 inches deep, and one-sixth of that is about 1.5 inches. A applies the one-quarter limit, which is only for notches at the ends of the member. C confuses drilling with notching; bored holes have their own rules. D waits for damage before reporting a weakened structural member.
Source: ICC CodeNotes: Cutting, Drilling and Notching (2021 IRC), Section R502.8.1, sawn lumber; EBPHI content outline in PSI's NHIE candidate bulletin (updated 12/10/2024), Domain 1, Task 4B (improper cuts and notches).
Answer: B. Bending stress is highest near midspan, so the IRC bans notches in the middle third of a sawn-lumber joist. This notch is also too deep: a 2x10 is actually about 9.25 inches deep, and one-sixth of that is about 1.5 inches. A applies the one-quarter limit, which is only for notches at the ends of the member. C confuses drilling with notching; bored holes have their own rules. D waits for damage before reporting a weakened structural member.
Source: ICC CodeNotes: Cutting, Drilling and Notching (2021 IRC), Section R502.8.1, sawn lumber; EBPHI content outline in PSI's NHIE candidate bulletin (updated 12/10/2024), Domain 1, Task 4B (improper cuts and notches).
Question 8 · Foundation cracks
NHIE-D1-08 · Task 4: Structure
A concrete block basement wall has a long horizontal crack about halfway up, and the wall bows inward roughly an inch. What is the BEST report?
Show explanation for Question 8
Answer: C. A horizontal crack with inward bowing points to sideways pressure from soil or water on the wall, one of the applied forces EBPHI's outline names (including hydrostatic pressure). It is not the same as a thin vertical shrinkage crack. ASHI's standard asks the inspector to report significant deficiencies and recommend further evaluation, but not to judge structural adequacy or price repairs. A misreads the pattern. B understates it. D adds a cost estimate the inspector isn't required, or usually qualified, to give.
Source: EBPHI content outline in PSI's NHIE candidate bulletin (updated 12/10/2024), Domain 1, Task 4A (foundation defects, applied forces); ASHI Standard of Practice for Home Inspections (effective March 1, 2014; current version), 2.2.B, 3.2.B, 13.2.A.5.
Answer: C. A horizontal crack with inward bowing points to sideways pressure from soil or water on the wall, one of the applied forces EBPHI's outline names (including hydrostatic pressure). It is not the same as a thin vertical shrinkage crack. ASHI's standard asks the inspector to report significant deficiencies and recommend further evaluation, but not to judge structural adequacy or price repairs. A misreads the pattern. B understates it. D adds a cost estimate the inspector isn't required, or usually qualified, to give.
Source: EBPHI content outline in PSI's NHIE candidate bulletin (updated 12/10/2024), Domain 1, Task 4A (foundation defects, applied forces); ASHI Standard of Practice for Home Inspections (effective March 1, 2014; current version), 2.2.B, 3.2.B, 13.2.A.5.
Question 9 · Double-tapped breakers
NHIE-D1-09 · Task 5: Electrical
Inside a service panel, two conductors are held under one terminal screw of a standard circuit breaker. Nothing on the breaker shows it is listed for two conductors. What should the inspector report?
Show explanation for Question 9
Answer: D. Most breaker terminals are made to clamp one conductor. Two wires under one screw can loosen, overheat, and arc. The NEC allows more than one conductor on a terminal only when the terminal is identified for it. EBPHI's outline lists double-tapping as a typical panel defect. A and B invent exceptions. C is the trap: inspectors don't perform code inspections, but they still report defects that create a safety or performance problem.
Source: NFPA 70 (NEC) development record, Section 110.14(A), Terminals, Section 110.14(A): terminals for more than one conductor must be identified for that use; EBPHI content outline in PSI's NHIE candidate bulletin (updated 12/10/2024), Domain 1, Task 5B (double-tapping).
Answer: D. Most breaker terminals are made to clamp one conductor. Two wires under one screw can loosen, overheat, and arc. The NEC allows more than one conductor on a terminal only when the terminal is identified for it. EBPHI's outline lists double-tapping as a typical panel defect. A and B invent exceptions. C is the trap: inspectors don't perform code inspections, but they still report defects that create a safety or performance problem.
Source: NFPA 70 (NEC) development record, Section 110.14(A), Terminals, Section 110.14(A): terminals for more than one conductor must be identified for that use; EBPHI content outline in PSI's NHIE candidate bulletin (updated 12/10/2024), Domain 1, Task 5B (double-tapping).
Question 10 · Known problem panels
NHIE-D1-10 · Task 5: Electrical
The main panel is a Federal Pacific Electric panel with Stab-Lok breakers. You see no heat damage. What is the BEST response?
Show explanation for Question 10
Answer: A. EBPHI's outline specifically names Federal Pacific/Stab-Lok (and Zinsco/Sylvania) as known problem panelboards. Even with no visible damage, the inspector should identify the panel and refer it to a licensed electrician. B ignores a known issue. C and D go beyond a visual home inspection: ASHI's standard doesn't require operating safety devices or dismantling equipment, and pulling breakers creates risk.
Source: EBPHI content outline in PSI's NHIE candidate bulletin (updated 12/10/2024), Domain 1, Task 5B.8 (known problem electrical panel boards); ASHI Standard of Practice for Home Inspections (effective March 1, 2014; current version), 2.2.B, 13.2.C.4, 13.2.F.4.
Answer: A. EBPHI's outline specifically names Federal Pacific/Stab-Lok (and Zinsco/Sylvania) as known problem panelboards. Even with no visible damage, the inspector should identify the panel and refer it to a licensed electrician. B ignores a known issue. C and D go beyond a visual home inspection: ASHI's standard doesn't require operating safety devices or dismantling equipment, and pulling breakers creates risk.
Source: EBPHI content outline in PSI's NHIE candidate bulletin (updated 12/10/2024), Domain 1, Task 5B.8 (known problem electrical panel boards); ASHI Standard of Practice for Home Inspections (effective March 1, 2014; current version), 2.2.B, 13.2.C.4, 13.2.F.4.
Question 11 · GFCI locations
NHIE-D1-11 · Task 5: Electrical
In a newer house, which of these receptacles MOST clearly should have GFCI (ground-fault circuit interrupter) protection but doesn't?
Show explanation for Question 11
Answer: A. GFCI protection shuts off power when current leaks to ground, which matters most where water and people meet. The NEC has long required GFCI protection for receptacles in bathrooms. Bedrooms, living rooms, and hallways are typically where AFCI (arc-fault) protection comes up instead, a separate device that guards against fire from arcing. Knowing which device goes where is exactly the kind of distinction EBPHI's outline names under devices and protection.
Source: NFPA 70 (NEC) development record, Section 210.8(A), Dwelling Units, Section 210.8(A)(1): bathroom receptacles require GFCI protection; EBPHI content outline in PSI's NHIE candidate bulletin (updated 12/10/2024), Domain 1, Task 5D (GFCI and AFCI protection).
Answer: A. GFCI protection shuts off power when current leaks to ground, which matters most where water and people meet. The NEC has long required GFCI protection for receptacles in bathrooms. Bedrooms, living rooms, and hallways are typically where AFCI (arc-fault) protection comes up instead, a separate device that guards against fire from arcing. Knowing which device goes where is exactly the kind of distinction EBPHI's outline names under devices and protection.
Source: NFPA 70 (NEC) development record, Section 210.8(A), Dwelling Units, Section 210.8(A)(1): bathroom receptacles require GFCI protection; EBPHI content outline in PSI's NHIE candidate bulletin (updated 12/10/2024), Domain 1, Task 5D (GFCI and AFCI protection).
Question 12 · Outdated wiring
NHIE-D1-12 · Task 5: Electrical
In the attic you see single conductors running on porcelain knobs and through porcelain tubes. Some of the runs are buried under loose-fill insulation. What is the BEST response?
Show explanation for Question 12
Answer: C. Porcelain knobs and tubes carrying single conductors are the signature of knob-and-tube wiring, which EBPHI's outline lists as an outdated wiring system. Reporting where it's buried in insulation tells the electrician where to look. A misidentifies the wiring method. B confuses "working" with "acceptable." D goes beyond the standard: ASHI's standard doesn't require inspectors to disturb insulation.
Source: EBPHI content outline in PSI's NHIE candidate bulletin (updated 12/10/2024), Domain 1, Task 5C.5 (outdated electrical wiring systems); ASHI Standard of Practice for Home Inspections (effective March 1, 2014; current version), 11.2 and 2.2.B.
Answer: C. Porcelain knobs and tubes carrying single conductors are the signature of knob-and-tube wiring, which EBPHI's outline lists as an outdated wiring system. Reporting where it's buried in insulation tells the electrician where to look. A misidentifies the wiring method. B confuses "working" with "acceptable." D goes beyond the standard: ASHI's standard doesn't require inspectors to disturb insulation.
Source: EBPHI content outline in PSI's NHIE candidate bulletin (updated 12/10/2024), Domain 1, Task 5C.5 (outdated electrical wiring systems); ASHI Standard of Practice for Home Inspections (effective March 1, 2014; current version), 11.2 and 2.2.B.
Question 13 · Refrigerant lines
NHIE-D1-13 · Task 6: Cooling
The air conditioner is running in cooling mode. At the outdoor condenser, the larger of the two copper refrigerant lines is bare, cold, and dripping with condensation. What is the BEST response?
Show explanation for Question 13
Answer: B. In cooling mode, the larger line is the suction line. It carries cool, low-pressure refrigerant vapor back to the compressor and is normally insulated. EBPHI's outline lists missing suction-line insulation as a typical cooling defect. A swaps the two lines. C is beyond a visual home inspection. D jumps to a diagnosis the observation doesn't support; a cold suction line actually suggests the system is moving refrigerant.
Source: EBPHI content outline in PSI's NHIE candidate bulletin (updated 12/10/2024), Domain 1, Task 6A (refrigerant cycle; missing suction line insulation).
Answer: B. In cooling mode, the larger line is the suction line. It carries cool, low-pressure refrigerant vapor back to the compressor and is normally insulated. EBPHI's outline lists missing suction-line insulation as a typical cooling defect. A swaps the two lines. C is beyond a visual home inspection. D jumps to a diagnosis the observation doesn't support; a cold suction line actually suggests the system is moving refrigerant.
Source: EBPHI content outline in PSI's NHIE candidate bulletin (updated 12/10/2024), Domain 1, Task 6A (refrigerant cycle; missing suction line insulation).
Question 14 · Condensate control
NHIE-D1-14 · Task 6: Cooling
An air handler in the attic is running in cooling mode. The separate drain pan installed underneath it (the auxiliary pan) holds standing water. What does this MOST likely mean?
Show explanation for Question 14
Answer: D. The auxiliary pan is a backup. The IRC requires one, or a secondary drain or shutoff device, where overflow or a blocked primary drain could damage the building. Water in it is a warning that the primary drain system isn't handling condensate. A misunderstands the pan's purpose. B is an unsupported diagnosis. C would turn a warning into water damage.
Source: International Residential Code (IRC), 2021, Section M1411.3.1 (auxiliary and secondary drain systems); EBPHI content outline in PSI's NHIE candidate bulletin (updated 12/10/2024), Domain 1, Task 6A.4 (condensate control and disposal).
Answer: D. The auxiliary pan is a backup. The IRC requires one, or a secondary drain or shutoff device, where overflow or a blocked primary drain could damage the building. Water in it is a warning that the primary drain system isn't handling condensate. A misunderstands the pan's purpose. B is an unsupported diagnosis. C would turn a warning into water damage.
Source: International Residential Code (IRC), 2021, Section M1411.3.1 (auxiliary and secondary drain systems); EBPHI content outline in PSI's NHIE candidate bulletin (updated 12/10/2024), Domain 1, Task 6A.4 (condensate control and disposal).
Question 15 · Burner safety
NHIE-D1-15 · Task 7: Heating
You see scorch marks and melted wire insulation around the burner compartment opening of a gas furnace. What is the BEST response?
Show explanation for Question 15
Answer: B. Scorching outside the burner area means flame has been escaping where it shouldn't, which EBPHI's outline lists as a heating safety issue (flame rollout). It can start fires and signals a combustion or venting problem that a specialist needs to find. A names a minor issue that doesn't explain the burn marks. C normalizes a hazard. D is dismantling, which is outside a home inspection.
Source: EBPHI content outline in PSI's NHIE candidate bulletin (updated 12/10/2024), Domain 1, Task 7A (common safety issues: flame rollout); ASHI Standard of Practice for Home Inspections (effective March 1, 2014; current version), 2.2.B and 13.2.F.4.
Answer: B. Scorching outside the burner area means flame has been escaping where it shouldn't, which EBPHI's outline lists as a heating safety issue (flame rollout). It can start fires and signals a combustion or venting problem that a specialist needs to find. A names a minor issue that doesn't explain the burn marks. C normalizes a hazard. D is dismantling, which is outside a home inspection.
Source: EBPHI content outline in PSI's NHIE candidate bulletin (updated 12/10/2024), Domain 1, Task 7A (common safety issues: flame rollout); ASHI Standard of Practice for Home Inspections (effective March 1, 2014; current version), 2.2.B and 13.2.F.4.
Question 16 · Combustion by-products
NHIE-D1-16 · Task 7: Heating
A gas furnace burns with a lazy yellow flame and there is soot near the burners, both signs of incomplete combustion. Which hazardous gas is MOST associated with incomplete combustion?
Show explanation for Question 16
Answer: A. When fuel doesn't get enough oxygen to burn completely, it produces carbon monoxide, an odorless gas that can sicken or kill. EBPHI's outline expects candidates to know combustion by-products and when they become a hazard. Water vapor is a normal product of clean combustion. Radon comes from soil, not burners. Ozone isn't a combustion by-product of a furnace.
Source: EBPHI content outline in PSI's NHIE candidate bulletin (updated 12/10/2024), Domain 1, Task 7A.6 (by-products of combustion); U.S. EPA: Carbon monoxide's impact on indoor air quality, Sources of CO in the home.
Answer: A. When fuel doesn't get enough oxygen to burn completely, it produces carbon monoxide, an odorless gas that can sicken or kill. EBPHI's outline expects candidates to know combustion by-products and when they become a hazard. Water vapor is a normal product of clean combustion. Radon comes from soil, not burners. Ozone isn't a combustion by-product of a furnace.
Source: EBPHI content outline in PSI's NHIE candidate bulletin (updated 12/10/2024), Domain 1, Task 7A.6 (by-products of combustion); U.S. EPA: Carbon monoxide's impact on indoor air quality, Sources of CO in the home.
Question 17 · Vent connectors
NHIE-D1-17 · Task 7: Heating
A single-wall vent connector runs from a natural-draft gas furnace to a chimney. The horizontal section slopes downward toward the chimney. What is correct?
Show explanation for Question 17
Answer: C. Hot flue gases rise. A connector that slopes down toward the chimney works against that, cooling the gases and raising the risk that they spill back into the house. The IRC calls for chimney and vent connectors to slope upward at least 1/4 inch per foot of run. EBPHI's outline lists improperly sloped vents and back-drafting or spillage as heating defects. A, B, and D invent conditions that don't fix the problem.
Source: International Residential Code (IRC), 2021, Section G2427.10.8 (503.10.8), vent-connector slope for gas appliances; EBPHI content outline in PSI's NHIE candidate bulletin (updated 12/10/2024), Domain 1, Task 7C (vent systems).
Answer: C. Hot flue gases rise. A connector that slopes down toward the chimney works against that, cooling the gases and raising the risk that they spill back into the house. The IRC calls for chimney and vent connectors to slope upward at least 1/4 inch per foot of run. EBPHI's outline lists improperly sloped vents and back-drafting or spillage as heating defects. A, B, and D invent conditions that don't fix the problem.
Source: International Residential Code (IRC), 2021, Section G2427.10.8 (503.10.8), vent-connector slope for gas appliances; EBPHI content outline in PSI's NHIE candidate bulletin (updated 12/10/2024), Domain 1, Task 7C (vent systems).
Question 18 · Attic ventilation math
NHIE-D1-18 · Task 8: Insulation, moisture, ventilation
A vented attic sits over a 1,500-square-foot ceiling. None of the IRC conditions that allow the reduced ventilation ratio apply. What is the minimum total net free ventilating area?
Show explanation for Question 18
Answer: B. The IRC's base ratio is 1 square foot of net free ventilating area per 150 square feet of vented space. 1,500 / 150 = 10 square feet (1,440 square inches). A uses the 1/300 ratio, which applies only when specific conditions are met, and the stem rules those out. C divides by 100. D divides by 10.
Source: International Residential Code (IRC), 2021, Section R806.2 (minimum vent area); EBPHI content outline in PSI's NHIE candidate bulletin (updated 12/10/2024), Domain 1, Task 8C (ventilation of attics).
Answer: B. The IRC's base ratio is 1 square foot of net free ventilating area per 150 square feet of vented space. 1,500 / 150 = 10 square feet (1,440 square inches). A uses the 1/300 ratio, which applies only when specific conditions are met, and the stem rules those out. C divides by 100. D divides by 10.
Source: International Residential Code (IRC), 2021, Section R806.2 (minimum vent area); EBPHI content outline in PSI's NHIE candidate bulletin (updated 12/10/2024), Domain 1, Task 8C (ventilation of attics).
Question 19 · Attic moisture
NHIE-D1-19 · Task 8: Insulation, moisture, ventilation
During a winter inspection, there's frost on the underside of the roof sheathing. It's heaviest above an unsealed attic hatch and around recessed ceiling lights. Bath fans vent outdoors. What is the MOST likely cause?
Show explanation for Question 19
Answer: A. Frost clustered above openings in the ceiling points to air leaks (attic bypasses) carrying indoor moisture into the attic, where it hits cold sheathing and freezes. EBPHI's outline names attic air bypasses as a moisture-movement concept. The inspector should report it and recommend air sealing and evaluation. B doesn't fit the pattern around the hatch and lights. C isn't the cause; leaks are. D ignores moisture that can lead to rot and mold.
Source: EBPHI content outline in PSI's NHIE candidate bulletin (updated 12/10/2024), Domain 1, Task 8B (moisture movement; attic air bypasses); U.S. DOE Energy Saver: Air sealing your home, Why air leaks matter and common leak locations.
If the DOE web page is unavailable, its Consumer Guide to Air Sealing the Home (PDF) also explains air leakage and moisture.
Answer: A. Frost clustered above openings in the ceiling points to air leaks (attic bypasses) carrying indoor moisture into the attic, where it hits cold sheathing and freezes. EBPHI's outline names attic air bypasses as a moisture-movement concept. The inspector should report it and recommend air sealing and evaluation. B doesn't fit the pattern around the hatch and lights. C isn't the cause; leaks are. D ignores moisture that can lead to rot and mold.
Source: EBPHI content outline in PSI's NHIE candidate bulletin (updated 12/10/2024), Domain 1, Task 8B (moisture movement; attic air bypasses); U.S. DOE Energy Saver: Air sealing your home, Why air leaks matter and common leak locations.
If the DOE web page is unavailable, its Consumer Guide to Air Sealing the Home (PDF) also explains air leakage and moisture.
Question 20 · Bath exhaust termination
NHIE-D1-20 · Task 9: Mechanical exhaust
A bathroom exhaust fan's duct ends loose in the attic, a few feet from the ridge vent. What is correct under the IRC?
Show explanation for Question 20
Answer: D. The IRC requires mechanical exhaust to discharge outdoors and specifically says not into an attic, soffit, ridge vent, or crawl space. Dumping humid bathroom air into the attic feeds condensation, mold, and decay. A and B are the common rationalizations the code rule exists to stop. C has nothing to do with where the air goes.
Source: International Residential Code (IRC), 2021, Section M1501.1 (outdoor discharge); EBPHI content outline in PSI's NHIE candidate bulletin (updated 12/10/2024), Domain 1, Task 9A (improper termination).
Answer: D. The IRC requires mechanical exhaust to discharge outdoors and specifically says not into an attic, soffit, ridge vent, or crawl space. Dumping humid bathroom air into the attic feeds condensation, mold, and decay. A and B are the common rationalizations the code rule exists to stop. C has nothing to do with where the air goes.
Source: International Residential Code (IRC), 2021, Section M1501.1 (outdoor discharge); EBPHI content outline in PSI's NHIE candidate bulletin (updated 12/10/2024), Domain 1, Task 9A (improper termination).
Question 21 · Dryer exhaust
NHIE-D1-21 · Task 9: Mechanical exhaust
The clothes dryer exhaust ends at an exterior wall hood with a bird screen over the opening. The screen is clogged with lint. What should the inspector report?
Show explanation for Question 21
Answer: C. The IRC says screens shall not be installed at the dryer duct termination, because they catch lint, restrict airflow, and raise fire risk. EBPHI's outline lists fire hazards and blockages among exhaust safety issues. A gets the rule backward. B accepts a prohibited condition. D recommends plastic duct, which the outline names as a typical dryer-exhaust defect.
Source: International Residential Code (IRC), 2021, Section M1502.3 (duct termination); EBPHI content outline in PSI's NHIE candidate bulletin (updated 12/10/2024), Domain 1, Task 9A (plastic dryer ducts; blockages).
Answer: C. The IRC says screens shall not be installed at the dryer duct termination, because they catch lint, restrict airflow, and raise fire risk. EBPHI's outline lists fire hazards and blockages among exhaust safety issues. A gets the rule backward. B accepts a prohibited condition. D recommends plastic duct, which the outline names as a typical dryer-exhaust defect.
Source: International Residential Code (IRC), 2021, Section M1502.3 (duct termination); EBPHI content outline in PSI's NHIE candidate bulletin (updated 12/10/2024), Domain 1, Task 9A (plastic dryer ducts; blockages).
Question 22 · T&P discharge piping
NHIE-D1-22 · Task 10: Plumbing and fuel
Under the IRC, a water heater's temperature and pressure relief (T&P) discharge pipe is reduced from the valve's 3/4-inch outlet to 1/2 inch, ends 18 inches above the floor, and has a threaded fitting at its open end. Which of these conditions should be reported as defects?
Show explanation for Question 22
Answer: C. The IRC requires T&P discharge piping to be at least the size of the valve outlet, to end no more than 6 inches above the floor or receptor, and to have no threaded connection at its end (so nobody can cap it). Each condition here breaks one of those rules, and each matters when the valve opens to release scalding water. A and B catch only one problem. D misses that the danger shows up when the valve actually discharges. Note: jurisdictions using the Uniform Plumbing Code have different termination rules, which is why this stem says "under the IRC."
Source: International Residential Code (IRC), 2021, Section P2804.6.1 (discharge pipe); ICC Building Safety Journal: Water heater safety in the International Codes, Discharge piping requirements; EBPHI content outline in PSI's NHIE candidate bulletin (updated 12/10/2024), Domain 1, Task 10D (temperature pressure relief valve defects).
Answer: C. The IRC requires T&P discharge piping to be at least the size of the valve outlet, to end no more than 6 inches above the floor or receptor, and to have no threaded connection at its end (so nobody can cap it). Each condition here breaks one of those rules, and each matters when the valve opens to release scalding water. A and B catch only one problem. D misses that the danger shows up when the valve actually discharges. Note: jurisdictions using the Uniform Plumbing Code have different termination rules, which is why this stem says "under the IRC."
Source: International Residential Code (IRC), 2021, Section P2804.6.1 (discharge pipe); ICC Building Safety Journal: Water heater safety in the International Codes, Discharge piping requirements; EBPHI content outline in PSI's NHIE candidate bulletin (updated 12/10/2024), Domain 1, Task 10D (temperature pressure relief valve defects).
Question 23 · Dissimilar metals
NHIE-D1-23 · Task 10: Plumbing and fuel
Galvanized steel water pipe is joined directly to copper pipe, with heavy corrosion at the joint. What is the BEST report?
Show explanation for Question 23
Answer: B. When two different metals touch in water, one corrodes faster (galvanic corrosion), and the joint is where it shows. EBPHI's outline lists dissimilar metals as a typical water-supply defect. B names the condition, its consequence, and the right professional. A and D excuse visible corrosion. C points to the wrong problem; the issue is the joint, not the water.
Source: EBPHI content outline in PSI's NHIE candidate bulletin (updated 12/10/2024), Domain 1, Task 10A (dissimilar metals); ASHI Standard of Practice for Home Inspections (effective March 1, 2014; current version), 2.2.B.
Answer: B. When two different metals touch in water, one corrodes faster (galvanic corrosion), and the joint is where it shows. EBPHI's outline lists dissimilar metals as a typical water-supply defect. B names the condition, its consequence, and the right professional. A and D excuse visible corrosion. C points to the wrong problem; the issue is the joint, not the water.
Source: EBPHI content outline in PSI's NHIE candidate bulletin (updated 12/10/2024), Domain 1, Task 10A (dissimilar metals); ASHI Standard of Practice for Home Inspections (effective March 1, 2014; current version), 2.2.B.
Question 24 · Stair risers
NHIE-D1-24 · Task 11: Interior
In one flight of interior stairs, the shortest riser measures 7 inches and the tallest measures 7 3/4 inches. What is correct under the IRC?
Show explanation for Question 24
Answer: D. The IRC caps riser height at 7 3/4 inches and also limits how much risers in one flight can vary: no more than 3/8 inch between the tallest and shortest. Here 7 3/4 - 7 = 3/4 inch, double the limit. People's feet expect a steady rhythm, which is why uneven risers cause falls. A checks only the maximum. B ignores risers. C calls a fall hazard cosmetic.
Source: International Residential Code (IRC), 2021, Section R311.7.5.1 (riser height); EBPHI content outline in PSI's NHIE candidate bulletin (updated 12/10/2024), Domain 1, Task 11B (improper riser height).
Answer: D. The IRC caps riser height at 7 3/4 inches and also limits how much risers in one flight can vary: no more than 3/8 inch between the tallest and shortest. Here 7 3/4 - 7 = 3/4 inch, double the limit. People's feet expect a steady rhythm, which is why uneven risers cause falls. A checks only the maximum. B ignores risers. C calls a fall hazard cosmetic.
Source: International Residential Code (IRC), 2021, Section R311.7.5.1 (riser height); EBPHI content outline in PSI's NHIE candidate bulletin (updated 12/10/2024), Domain 1, Task 11B (improper riser height).
Question 25 · Creosote
NHIE-D1-25 · Task 12: Fireplaces and chimneys
Inside a wood-burning fireplace flue, you see a thick, shiny, tar-like coating of creosote. What is the BEST response?
Show explanation for Question 25
Answer: A. Creosote is a flammable by-product of burning wood, and heavy glazed buildup is a chimney fire risk. EBPHI's outline names creosote buildup as a common safety issue for solid-fuel fireplaces. A states the hazard and the right next step. B normalizes a hazard. C is invasive and not part of a visual inspection. D misses the fire risk.
Source: EBPHI content outline in PSI's NHIE candidate bulletin (updated 12/10/2024), Domain 1, Task 12A (creosote buildup); ASHI Standard of Practice for Home Inspections (effective March 1, 2014; current version), 2.2.B.
Answer: A. Creosote is a flammable by-product of burning wood, and heavy glazed buildup is a chimney fire risk. EBPHI's outline names creosote buildup as a common safety issue for solid-fuel fireplaces. A states the hazard and the right next step. B normalizes a hazard. C is invasive and not part of a visual inspection. D misses the fire risk.
Source: EBPHI content outline in PSI's NHIE candidate bulletin (updated 12/10/2024), Domain 1, Task 12A (creosote buildup); ASHI Standard of Practice for Home Inspections (effective March 1, 2014; current version), 2.2.B.
Question 26 · Garage separation
NHIE-D1-26 · Task 13: Life safety
The door between an attached garage and the kitchen is a hollow-core wood door with no fire-rating label. What should the inspector report?
Show explanation for Question 26
Answer: B. Garages hold cars and fuel, so the IRC expects the door into the house to slow fire and fumes: solid wood or solid or honeycomb-core steel at least 1 3/8 inches thick, or a 20-minute fire-rated door. (Doors from a garage directly into a sleeping room aren't allowed at all.) A hollow-core wood door meets none of these. EBPHI's outline puts fire separation under life safety. A, C, and D miss the safety purpose.
Source: International Residential Code (IRC), 2021, Section R302.5.1 (opening protection); EBPHI content outline in PSI's NHIE candidate bulletin (updated 12/10/2024), Domain 1, Task 13 (fire separation, fire-rated doors).
Answer: B. Garages hold cars and fuel, so the IRC expects the door into the house to slow fire and fumes: solid wood or solid or honeycomb-core steel at least 1 3/8 inches thick, or a 20-minute fire-rated door. (Doors from a garage directly into a sleeping room aren't allowed at all.) A hollow-core wood door meets none of these. EBPHI's outline puts fire separation under life safety. A, C, and D miss the safety purpose.
Source: International Residential Code (IRC), 2021, Section R302.5.1 (opening protection); EBPHI content outline in PSI's NHIE candidate bulletin (updated 12/10/2024), Domain 1, Task 13 (fire separation, fire-rated doors).
Question 27 · Emergency escape openings
NHIE-D1-27 · Task 13: Life safety
The only window in a bedroom is large enough, but the bottom of its clear opening is 50 inches above the floor. What is correct under the IRC?
Show explanation for Question 27
Answer: D. Sleeping rooms need an emergency escape and rescue opening. The IRC sets a minimum net clear opening (5.7 square feet, or 5.0 at grade-floor and below-grade openings) and a maximum sill height of 44 inches, so a person can actually climb out. Size alone isn't enough, which eliminates A. B is wrong because the rule covers every sleeping room. C relies on loose furniture that may not be there in an emergency.
Source: International Residential Code (IRC), 2021, Section R310.2 (opening area and sill height); EBPHI content outline in PSI's NHIE candidate bulletin (updated 12/10/2024), Domain 1, Task 13.1 (egress requirements, sill height).
Answer: D. Sleeping rooms need an emergency escape and rescue opening. The IRC sets a minimum net clear opening (5.7 square feet, or 5.0 at grade-floor and below-grade openings) and a maximum sill height of 44 inches, so a person can actually climb out. Size alone isn't enough, which eliminates A. B is wrong because the rule covers every sleeping room. C relies on loose furniture that may not be there in an emergency.
Source: International Residential Code (IRC), 2021, Section R310.2 (opening area and sill height); EBPHI content outline in PSI's NHIE candidate bulletin (updated 12/10/2024), Domain 1, Task 13.1 (egress requirements, sill height).
Question 28 · Smoke alarm placement
NHIE-D1-28 · Task 13: Life safety
A two-story house with a basement has all bedrooms upstairs. Which set of smoke alarm locations meets the IRC's location requirements?
Show explanation for Question 28
Answer: C. The IRC requires smoke alarms in each sleeping room, outside each separate sleeping area in the immediate vicinity of the bedrooms, and on each additional story, including basements. Only C covers all three. A and D miss the bedrooms. B misses the alarm outside the sleeping area and the alarms required on the other stories. ASHI's current standard requires inspectors to inspect smoke and carbon-monoxide alarms and report their presence as specified by that standard; local requirements can add details.
Source: International Residential Code (IRC), 2021, Section R314.3 (smoke alarm locations); EBPHI content outline in PSI's NHIE candidate bulletin (updated 12/10/2024), Domain 1, Task 13.3 (smoke alarm placement); ASHI Standard of Practice for Home Inspections (effective March 1, 2014; current version), 7.1.B.3 and 7.2.A.2.
Answer: C. The IRC requires smoke alarms in each sleeping room, outside each separate sleeping area in the immediate vicinity of the bedrooms, and on each additional story, including basements. Only C covers all three. A and D miss the bedrooms. B misses the alarm outside the sleeping area and the alarms required on the other stories. ASHI's current standard requires inspectors to inspect smoke and carbon-monoxide alarms and report their presence as specified by that standard; local requirements can add details.
Source: International Residential Code (IRC), 2021, Section R314.3 (smoke alarm locations); EBPHI content outline in PSI's NHIE candidate bulletin (updated 12/10/2024), Domain 1, Task 13.3 (smoke alarm placement); ASHI Standard of Practice for Home Inspections (effective March 1, 2014; current version), 7.1.B.3 and 7.2.A.2.
Domain 2 · Analysis of Findings and Reporting (8 questions)
Question 29 · Describing systems
NHIE-D2-01 · Task 1: What was inspected and how
Which report statement DESCRIBES a system, rather than stating its condition or giving advice?
Show explanation for Question 29
Answer: A. In ASHI's standard, "describe" means identifying a system by its type and other distinguishing traits, such as energy source and location. EBPHI's outline asks candidates to describe systems by characteristics like purpose, type, size, and location. B is a condition plus a recommendation. C is a condition statement. D is a cost estimate, which inspectors aren't required to provide.
Source: ASHI Standard of Practice for Home Inspections (effective March 1, 2014; current version), 8.1.C and glossary ("Describe"); EBPHI content outline in PSI's NHIE candidate bulletin (updated 12/10/2024), Domain 2, Task 1.
Answer: A. In ASHI's standard, "describe" means identifying a system by its type and other distinguishing traits, such as energy source and location. EBPHI's outline asks candidates to describe systems by characteristics like purpose, type, size, and location. B is a condition plus a recommendation. C is a condition statement. D is a cost estimate, which inspectors aren't required to provide.
Source: ASHI Standard of Practice for Home Inspections (effective March 1, 2014; current version), 8.1.C and glossary ("Describe"); EBPHI content outline in PSI's NHIE candidate bulletin (updated 12/10/2024), Domain 2, Task 1.
Question 30 · Reporting methods
NHIE-D2-02 · Task 1: What was inspected and how
A roof is too steep to walk safely, so you inspect it from a ladder at the eaves and with binoculars from the ground. How should the report handle this?
Show explanation for Question 30
Answer: C. ASHI's standard requires the inspector to describe the methods used to inspect the roofing, and EBPHI's outline lists common inspection methods (like walking the roof) under reporting. Telling the client how the roof was viewed sets honest expectations about what could and couldn't be seen. A and B hide that. D throws away what was observed.
Source: ASHI Standard of Practice for Home Inspections (effective March 1, 2014; current version), 5.1.B.2; EBPHI content outline in PSI's NHIE candidate bulletin (updated 12/10/2024), Domain 2, Task 1.3 (common methods used to inspect components).
Answer: C. ASHI's standard requires the inspector to describe the methods used to inspect the roofing, and EBPHI's outline lists common inspection methods (like walking the roof) under reporting. Telling the client how the roof was viewed sets honest expectations about what could and couldn't be seen. A and B hide that. D throws away what was observed.
Source: ASHI Standard of Practice for Home Inspections (effective March 1, 2014; current version), 5.1.B.2; EBPHI content outline in PSI's NHIE candidate bulletin (updated 12/10/2024), Domain 2, Task 1.3 (common methods used to inspect components).
Question 31 · Inaccessible areas
NHIE-D2-03 · Task 2: Limitations
The attic hatch is in a closet, and stored boxes are stacked to the ceiling in front of it. What is the BEST approach?
Show explanation for Question 31
Answer: B. ASHI's standard says inspectors aren't required to move personal property, and it requires the report to state systems that were present but not inspected, along with the reason. EBPHI's outline makes reporting limitations its own task. A goes past the standard and risks property damage. C leaves the client unaware of a gap. D reports on something that wasn't inspected.
Source: ASHI Standard of Practice for Home Inspections (effective March 1, 2014; current version), 2.2.B.4 and 13.2.F.3; EBPHI content outline in PSI's NHIE candidate bulletin (updated 12/10/2024), Domain 2, Task 2.
Answer: B. ASHI's standard says inspectors aren't required to move personal property, and it requires the report to state systems that were present but not inspected, along with the reason. EBPHI's outline makes reporting limitations its own task. A goes past the standard and risks property damage. C leaves the client unaware of a gap. D reports on something that wasn't inspected.
Source: ASHI Standard of Practice for Home Inspections (effective March 1, 2014; current version), 2.2.B.4 and 13.2.F.3; EBPHI content outline in PSI's NHIE candidate bulletin (updated 12/10/2024), Domain 2, Task 2.
Question 32 · Weather limitations
NHIE-D2-04 · Task 2: Limitations
Snow covers the entire roof on inspection day. What is the BEST approach?
Show explanation for Question 32
Answer: D. EBPHI's outline lists environmental factors among common inspection limitations. ASHI's standard doesn't require moving snow or entering dangerous areas, and it requires reporting what wasn't inspected and why. D does that and tells the client how to close the gap. A claims a finding the inspector couldn't make. B is unsafe and beyond the standard. C hides the limitation.
Source: EBPHI content outline in PSI's NHIE candidate bulletin (updated 12/10/2024), Domain 2, Task 2.1 (environmental factors); ASHI Standard of Practice for Home Inspections (effective March 1, 2014; current version), 2.2.B.4, 13.2.D.1, 13.2.F.3.
Answer: D. EBPHI's outline lists environmental factors among common inspection limitations. ASHI's standard doesn't require moving snow or entering dangerous areas, and it requires reporting what wasn't inspected and why. D does that and tells the client how to close the gap. A claims a finding the inspector couldn't make. B is unsafe and beyond the standard. C hides the limitation.
Source: EBPHI content outline in PSI's NHIE candidate bulletin (updated 12/10/2024), Domain 2, Task 2.1 (environmental factors); ASHI Standard of Practice for Home Inspections (effective March 1, 2014; current version), 2.2.B.4, 13.2.D.1, 13.2.F.3.
Question 33 · Stating implications
NHIE-D2-05 · Task 3: Defects and implications
Which report statement BEST communicates the implication of a defect?
Show explanation for Question 33
Answer: B. EBPHI's outline asks candidates to describe the implications of what might happen if defects aren't repaired, and ASHI's standard calls for a recommendation and an explanation when a deficiency isn't self-evident. B gives the observation, the consequence, and the next step. A stops at the observation. C cites code instead of explaining the consequence. D recommends a product unrelated to the actual problem.
Source: EBPHI content outline in PSI's NHIE candidate bulletin (updated 12/10/2024), Domain 2, Task 3.5 (implications); ASHI Standard of Practice for Home Inspections (effective March 1, 2014; current version), 2.2.B.2 and 2.2.B.3.
Answer: B. EBPHI's outline asks candidates to describe the implications of what might happen if defects aren't repaired, and ASHI's standard calls for a recommendation and an explanation when a deficiency isn't self-evident. B gives the observation, the consequence, and the next step. A stops at the observation. C cites code instead of explaining the consequence. D recommends a product unrelated to the actual problem.
Source: EBPHI content outline in PSI's NHIE candidate bulletin (updated 12/10/2024), Domain 2, Task 3.5 (implications); ASHI Standard of Practice for Home Inspections (effective March 1, 2014; current version), 2.2.B.2 and 2.2.B.3.
Question 34 · Service life
NHIE-D2-06 · Task 3: Defects and implications
A 20-year-old tank water heater is working normally. What is the BEST way to handle its age in the report?
Show explanation for Question 34
Answer: C. ASHI's standard has the inspector report systems near the end of their service lives, while saying the inspector isn't required to determine remaining life expectancy. EBPHI's outline lists expected service life under describing components. C does both. A promises a prediction nobody can make. B overreaches; the inspector reports and recommends, the client decides. D drops useful information.
Source: ASHI Standard of Practice for Home Inspections (effective March 1, 2014; current version), 2.2.B.1 and 13.2.A.2; EBPHI content outline in PSI's NHIE candidate bulletin (updated 12/10/2024), Domain 2, Task 3.1 (expected service life).
Answer: C. ASHI's standard has the inspector report systems near the end of their service lives, while saying the inspector isn't required to determine remaining life expectancy. EBPHI's outline lists expected service life under describing components. C does both. A promises a prediction nobody can make. B overreaches; the inspector reports and recommends, the client decides. D drops useful information.
Source: ASHI Standard of Practice for Home Inspections (effective March 1, 2014; current version), 2.2.B.1 and 13.2.A.2; EBPHI content outline in PSI's NHIE candidate bulletin (updated 12/10/2024), Domain 2, Task 3.1 (expected service life).
Question 35 · Life-threatening hazards
NHIE-D2-07 · Task 4: Further evaluation and immediate hazards
You smell a strong odor of natural gas at the gas meter during an inspection. What is the BEST response?
Show explanation for Question 35
Answer: A. EBPHI's outline lists a gas leak as a life-threatening hazard that warrants immediate action. ASHI's Code of Ethics lets inspectors disclose immediate safety hazards to exposed occupants, even though inspection results are otherwise confidential. B and D delay warning people who may be at risk. C has the inspector repairing gas equipment.
Source: EBPHI content outline in PSI's NHIE candidate bulletin (updated 12/10/2024), Domain 2, Task 4.3 (life-threatening safety hazards); ASHI Code of Ethics, 2.C.
Answer: A. EBPHI's outline lists a gas leak as a life-threatening hazard that warrants immediate action. ASHI's Code of Ethics lets inspectors disclose immediate safety hazards to exposed occupants, even though inspection results are otherwise confidential. B and D delay warning people who may be at risk. C has the inspector repairing gas equipment.
Source: EBPHI content outline in PSI's NHIE candidate bulletin (updated 12/10/2024), Domain 2, Task 4.3 (life-threatening safety hazards); ASHI Code of Ethics, 2.C.
Question 36 · Choosing the right professional
NHIE-D2-08 · Task 4: Further evaluation and immediate hazards
Inside the main panel, a breaker's housing is melted and the bus bar near it is scorched. Who should the report recommend for further evaluation?
Show explanation for Question 36
Answer: D. ASHI's standard defines further evaluation as examination by a qualified professional, tradesperson, or service technician, and EBPHI's outline asks candidates to match the defect to the right professional. Overheating inside a panel is electrical work that calls for a qualified electrician. A and C are the wrong trades. B does not establish the electrical qualification needed for panel work; licensing titles vary by jurisdiction.
Source: ASHI Standard of Practice for Home Inspections (effective March 1, 2014; current version), 2.2.B.2 and glossary ("Further Evaluation"); EBPHI content outline in PSI's NHIE candidate bulletin (updated 12/10/2024), Domain 2, Task 4.1 (qualified professional or tradesperson).
Answer: D. ASHI's standard defines further evaluation as examination by a qualified professional, tradesperson, or service technician, and EBPHI's outline asks candidates to match the defect to the right professional. Overheating inside a panel is electrical work that calls for a qualified electrician. A and C are the wrong trades. B does not establish the electrical qualification needed for panel work; licensing titles vary by jurisdiction.
Source: ASHI Standard of Practice for Home Inspections (effective March 1, 2014; current version), 2.2.B.2 and glossary ("Further Evaluation"); EBPHI content outline in PSI's NHIE candidate bulletin (updated 12/10/2024), Domain 2, Task 4.1 (qualified professional or tradesperson).
Domain 3 · Professional Responsibilities (4 questions)
Question 37 · Agreement elements
NHIE-D3-01 · Task 1: Pre-inspection agreement
Which item is a typical element of a pre-inspection agreement?
Show explanation for Question 37
Answer: B. EBPHI's outline lists typical elements of a pre-inspection agreement, including exclusions and limitations, limits of liability, and dispute resolution, along with privacy considerations. The agreement sets the scope of the job before it starts. A and C are transaction details that don't define the inspector's service. D isn't part of an agreement and isn't something inspectors are required to provide.
Source: EBPHI content outline in PSI's NHIE candidate bulletin (updated 12/10/2024), Domain 3, Task 1.2 (typical elements of a pre-inspection agreement).
Answer: B. EBPHI's outline lists typical elements of a pre-inspection agreement, including exclusions and limitations, limits of liability, and dispute resolution, along with privacy considerations. The agreement sets the scope of the job before it starts. A and C are transaction details that don't define the inspector's service. D isn't part of an agreement and isn't something inspectors are required to provide.
Source: EBPHI content outline in PSI's NHIE candidate bulletin (updated 12/10/2024), Domain 3, Task 1.2 (typical elements of a pre-inspection agreement).
Question 38 · Agreement timing
NHIE-D3-02 · Task 1: Pre-inspection agreement
In New York, a licensed home inspector's client wants to sign the agreement after receiving the report. What does New York's regulation require?
Show explanation for Question 38
Answer: C. New York's home inspector regulations require that, before performing a home inspection, the inspector provide the client a written pre-inspection agreement clearly describing the scope of service and its cost. Timing is one of the agreement topics in EBPHI's outline. A, B, and D all skip the written, up-front step. Other states set their own rules, so check the one where you'll practice.
Source: New York Department of State, Home Inspection Professional Licensing Law and Regulations (March 2026), 19 NYCRR §197-4.2(a), Written contracts; EBPHI content outline in PSI's NHIE candidate bulletin (updated 12/10/2024), Domain 3, Task 1.4 (timing of delivery and signing).
Answer: C. New York's home inspector regulations require that, before performing a home inspection, the inspector provide the client a written pre-inspection agreement clearly describing the scope of service and its cost. Timing is one of the agreement topics in EBPHI's outline. A, B, and D all skip the written, up-front step. Other states set their own rules, so check the one where you'll practice.
Source: New York Department of State, Home Inspection Professional Licensing Law and Regulations (March 2026), 19 NYCRR §197-4.2(a), Written contracts; EBPHI content outline in PSI's NHIE candidate bulletin (updated 12/10/2024), Domain 3, Task 1.4 (timing of delivery and signing).
Question 39 · Repairs after inspection
NHIE-D3-03 · Task 2: Integrity and objectivity
An inspector who also owns a remodeling company is asked by a client to fix several items from last month's report, for pay. Under ASHI's Code of Ethics, what is correct?
Show explanation for Question 39
Answer: A. If the person who finds the problems can profit from fixing them, the report's objectivity is in question. ASHI's Code of Ethics bars paid repair, replacement, or upgrade of covered systems and components for one year after the inspection. EBPHI's outline lists conflicts of interest under professional responsibilities. B, C, and D all leave the conflict in place. State rules may add their own limits.
Source: ASHI Code of Ethics, 1.F; EBPHI content outline in PSI's NHIE candidate bulletin (updated 12/10/2024), Domain 3, Task 2.2 (conflicts of interest).
Answer: A. If the person who finds the problems can profit from fixing them, the report's objectivity is in question. ASHI's Code of Ethics bars paid repair, replacement, or upgrade of covered systems and components for one year after the inspection. EBPHI's outline lists conflicts of interest under professional responsibilities. B, C, and D all leave the conflict in place. State rules may add their own limits.
Source: ASHI Code of Ethics, 1.F; EBPHI content outline in PSI's NHIE candidate bulletin (updated 12/10/2024), Domain 3, Task 2.2 (conflicts of interest).
Question 40 · Referral fees
NHIE-D3-04 · Task 2: Integrity and objectivity
A real estate agent offers to put an inspector on the brokerage's "preferred inspector" list for a monthly fee. Under ASHI's Code of Ethics, what is correct?
Show explanation for Question 40
Answer: D. An agent has a financial interest in the sale closing. Paying that agent for referrals gives the inspector a reason to keep the agent happy rather than the client informed. ASHI's Code of Ethics prohibits directly or indirectly compensating agents for referrals or for inclusion on recommended-inspector or preferred-provider lists. A, B, and C each try to make the payment acceptable; disclosure or size doesn't remove the conflict.
Source: ASHI Code of Ethics, 1.C; EBPHI content outline in PSI's NHIE candidate bulletin (updated 12/10/2024), Domain 3, Task 2.2 (third-party stakeholders with a financial interest).
Answer: D. An agent has a financial interest in the sale closing. Paying that agent for referrals gives the inspector a reason to keep the agent happy rather than the client informed. ASHI's Code of Ethics prohibits directly or indirectly compensating agents for referrals or for inclusion on recommended-inspector or preferred-provider lists. A, B, and C each try to make the payment acceptable; disclosure or size doesn't remove the conflict.
Source: ASHI Code of Ethics, 1.C; EBPHI content outline in PSI's NHIE candidate bulletin (updated 12/10/2024), Domain 3, Task 2.2 (third-party stakeholders with a financial interest).
This is practice feedback, not an NHIE score or pass prediction.
Raw first-check counts for this visit only. Opening an explanation, using Show all answers, or printing before you check marks a question as assisted, and assisted questions are not counted as correct. Nothing is saved.
| Domain | Correct on first check | Incorrect on first check | Assisted | Not answered |
|---|---|---|---|---|
| Domain 1 · Property and Building Inspection/Site Review | 0 / 28 | 0 | 0 | 28 |
| Domain 2 · Analysis of Findings and Reporting | 0 / 8 | 0 | 0 | 8 |
| Domain 3 · Professional Responsibilities | 0 / 4 | 0 | 0 | 4 |
| All 40 questions | 0 / 40 | 0 | 0 | 40 |
Domain 2 has 8 questions and Domain 3 has 4, so those are small samples. Treat a low score there as a flag to look closer, not a verdict.
| 200 questions | 25 unscored | 4 hours | Pass = 500 (scale 200–800) | 70 / 20 / 10 |
|---|
Sources: EBPHI FAQ, EBPHI content outline in PSI's NHIE bulletin, updated 12/10/2024.
Score your diagnostic and find your weak spots
Count your correct answers in each domain, then write down every miss by topic, not just the total.
| Domain | Questions | Your score | Topics covered |
|---|---|---|---|
| 1 · Property and Building Inspection/Site Review | 1–28 | ___ / 28 | Site, exterior, roof, structure, electrical, cooling, heating, insulation and moisture, exhaust, plumbing, interior, fireplaces, life safety |
| 2 · Analysis of Findings and Reporting | 29–36 | ___ / 8 | Describing systems and methods, limitations, defects and implications, further evaluation and immediate hazards |
| 3 · Professional Responsibilities | 37–40 | ___ / 4 | Pre-inspection agreements, conflicts of interest |
Four or eight questions is a small sample. Treat a low domain score as a flag to look closer, not a verdict.
For each miss, label why you missed it. The label tells you what to do next:
| Why you missed it | What to do |
|---|---|
| I didn't know how the system works | Study the system itself: what it is, how it fails, what the failure causes. |
| I misread the scenario | Slow down. Underline the key facts in the stem before you look at the options. |
| Two answers both looked right | Write one sentence on why the right answer is better. That's the skill the exam's "best answer" format tests. |
| I forgot a number or detail | Make one focused flashcard for it. |
| I missed the same topic twice | Move that topic into your next study block, even if it sits in a smaller domain. |
Your 4-week NHIE study plan
This plan assumes about 8 to 10 hours a week and that you've finished (or nearly finished) your pre-licensing course. It's our editorial plan, not an EBPHI requirement, and it doesn't guarantee a result. Stretch it to six weeks if you're new to construction.
| Week | Main topics | Practice | Done when |
|---|---|---|---|
| 1 | Take the diagnostic above. Then site and drainage, exterior (decks, guards, doors, garage doors), roofing and flashing, structure | Error-log every miss by topic. Redo any missed questions from this page on day 7 without looking at the explanations. | You can explain, for each of these systems, one common defect and what it leads to |
| 2 | Electrical (service, panels, grounding, wiring methods, GFCI/AFCI, problem panels, EV charging equipment), plumbing and fuel (supply, drains and vents, water heaters, gas), life safety (egress, fire separation, smoke and CO alarms) | Short scenario drills: read a defect, say what you'd report and who should evaluate it | You can pick the right trade professional for any defect you studied |
| 3 | Heating and cooling (operation, venting, combustion by-products, refrigerant cycle, condensate), insulation and moisture, attic and crawl space ventilation, exhaust systems, interiors and appliances, smart home basics, fireplaces and chimneys | One mixed block of 40 to 50 questions from any reputable source at about 72 seconds each | Your pacing holds and your repeat misses are shrinking |
| 4 | Reporting (Domain 2) and professional responsibilities (Domain 3). Then a final pass on every topic you've missed twice | Two timed mixed blocks. Re-read every explanation for a question you got wrong | Your registration, ID, test center, and state rules are confirmed (see the exam-day section below) |
Every time you study a defect, practice saying it in three parts: what you saw → why it matters → who should evaluate or repair it. That habit covers a big share of Domain 2.
If you only have 7 days
Seven days won't be enough for everyone. Triage instead of cramming everything equally:
- Day 1: Take the diagnostic and build your error log.
- Days 2–4: Your weakest Domain 1 topics, starting with the heaviest tasks (electrical at 7%; roof, structure, plumbing and fuel, fireplaces, and life safety at 6% each).
- Day 5: Domain 2: describing systems, limitations, implications, referrals.
- Day 6: Domain 3, then one timed mixed block.
- Day 7: Light review of repeat misses and your exam-day check. No new resources.
If you already failed once
- In most states, a failing score report shows how you did in each content area (EBPHI FAQ). Start the plan with your weakest area instead of repeating everything equally.
- You must wait 30 days between attempts, and each attempt is a new fee, unless your state's rules say otherwise (EBPHI Test Policies).
- Don't chase a "percent needed to pass." EBPHI doesn't publish one (more on that below).
- EBPHI's FAQ notes that some candidates lean too heavily on their course's own exams. Compare what you studied against the current outline below.
What's on the NHIE right now
EBPHI's current content outline has 3 domains and 19 tasks. The percentages are the share of exam questions from each.
| Domain | Weight | What it means for your prep |
|---|---|---|
| 1 · Property and Building Inspection/Site Review | 70% | Most study and practice belongs here, but cover all 13 tasks, not just electrical, plumbing, and HVAC |
| 2 · Analysis of Findings and Reporting | 20% | Turning observations into clear report language: what you inspected, what you couldn't, what's wrong, what should happen next |
| 3 · Professional Responsibilities | 10% | Pre-inspection agreements, privacy, conflicts of interest, objectivity, protecting the client |
Domain 1 · Property and Building Inspection/Site Review (70%)
| Task | Weight | What it covers |
|---|---|---|
| 1 · Site conditions | 5% | Grade, drainage, retaining walls, vegetation, driveways and walks, pool and spa barriers |
| 2 · Exterior | 5% | Cladding, flashing, trim, doors and windows, decks, stairs, railings, garage doors and openers |
| 3 · Roof | 6% | Coverings, drainage, flashings, skylights and other penetrations |
| 4 · Structure | 6% | Foundations, floors, walls, roof and ceiling framing, applied forces including hydrostatic pressure |
| 5 · Electrical | 7% | Service, panels and subpanels, grounding and bonding, wiring methods, devices, GFCI and AFCI, known problem panels, alternative energy, EV charging equipment |
| 6 · Cooling | 4% | Refrigerant cycle, condensate, distribution, typical defects |
| 7 · Heating | 5% | Operation, combustion by-products, distribution, vent systems |
| 8 · Insulation, moisture, ventilation | 5% | Heat transfer, insulation, moisture movement, attic and crawl space ventilation, conditioned/encapsulated spaces |
| 9 · Mechanical exhaust and indoor air | 5% | Bath, kitchen, and dryer exhaust, heat recovery ventilators, make-up air |
| 10 · Plumbing and fuel distribution | 6% | Supply, fixtures, drains and vents, water heaters, fuel storage and piping, sump and ejector pumps |
| 11 · Interior | 4% | Walls, ceilings, floors, doors, windows, stairs, cabinets, installed kitchen appliances, smart home technology |
| 12 · Fireplaces and fuel-burning appliances | 6% | Solid-fuel and gas fireplaces, chimneys, vents, clearances, combustion air |
| 13 · Life safety | 6% | Egress, fire separation, smoke and CO alarm placement, sprinkler defects |
Domain 2 · Analysis of Findings and Reporting (20%)
| Task | Weight | What it covers |
|---|---|---|
| 1 · What was inspected and how | 4% | Describing systems; inspection methods; test instruments like moisture meters, CO meters, infrared cameras |
| 2 · Limitations | 4% | What wasn't inspected and why, limits of a visual inspection, smart and emerging technology |
| 3 · Defects | 6% | Service life, signs of failure, common defects, safety issues, implications if not repaired |
| 4 · Further evaluation | 6% | The right professional for each repair, how components relate, life-threatening hazards needing immediate action |
Domain 3 · Professional Responsibilities (10%)
| Task | Weight | What it covers |
|---|---|---|
| 1 · Pre-inspection agreement | 5% | Purpose, typical elements (exclusions and limitations, limits of liability, dispute resolution), privacy, timing |
| 2 · Quality, integrity, objectivity | 5% | Contract and negligence concepts, conflicts of interest, liability and errors-and-omissions coverage, protecting the client's interests and privacy |
Source: EBPHI content outline in PSI's NHIE bulletin, updated 12/10/2024, pages 6–13. EBPHI notes the outline isn't a complete list of everything that can appear.
Why you may see different percentages elsewhere
The previous NHIE outline was weighted 63% / 25% / 12%. The current one is 70% / 20% / 10%, and a PSI bulletin from that transition announced the new outline as coming in the second quarter of 2024 (PSI bulletin). Some prep materials still show the old split. Plan from the current one. Besides the reweighting, the current outline made life safety its own task and added EV charging equipment, smart home technology, and privacy topics.
How NHIE questions work
One best answer. Each question has four options and one correct answer, but EBPHI says some options may be partially correct (PSI bulletin, Examination Preparation). That's why the diagnostic above explains the wrong answers too. The best answer is usually the most complete one that stays inside a home inspector's role.
Stay in the inspector's lane. A home inspector describes what they saw, explains why it matters, and refers it to the right professional. ASHI's Standard of Practice doesn't require inspectors to determine causes, remaining life, repair methods, or costs (ASHI Standard of Practice, sections 2.2 and 13.2). Answers that diagnose, design a fix, or quote a price are often traps.
Code numbers still matter. Home inspections aren't code inspections, but EBPHI lists the 2021 IRC, the 2023 NEC, and the 2021 Life Safety Code among its references. Knowing the common safety numbers helps you recognize a defect.
What a 500 means
The NHIE is scaled from 200 to 800, and 500 passes. The passing point is set by a panel of experts for each exam form based on item difficulty, and you're measured against that standard, not against other candidates (EBPHI Test Policies). EBPHI doesn't publish a raw percentage needed to pass, so don't trust any page that tells you 500 equals a fixed percent. Practice percentages are still useful. They show your weak topics and pacing, but they don't convert to a scaled score.
Numbers worth knowing
These are from the 2021 IRC unless noted. Local amendments can change them, and jurisdictions using the Uniform Plumbing Code handle T&P discharge differently.
| Topic | Number | Where it comes from |
|---|---|---|
| Final grade away from the house | Falls at least 6 in. within the first 10 ft | IRC R401.3 |
| Guards required | Walking surface more than 30 in. above the floor or grade below | IRC R312.1.1 |
| Guard height and openings | At least 36 in. high; no opening passes a 4-in. sphere | IRC R312.1.2, R312.1.3 |
| Stair risers and treads | Risers 7¾ in. max, treads 10 in. min, no more than ⅜ in. variation in a flight | IRC R311.7.5 |
| Handrail height | 34 to 38 in. | IRC R311.7.8.1 |
| Escape and rescue openings | 5.7 sq ft net clear (5.0 at grade-floor or below-grade openings); sill no more than 44 in. above the floor | IRC R310.2 |
| Garage-to-house door | Solid wood or solid/honeycomb-core steel at least 1⅜ in. thick, or 20-minute rated; no garage door into a bedroom | IRC R302.5.1 |
| Joist notches | No notches in the middle third of the span; no deeper than ⅙ of the depth (¼ at the ends) | IRC R502.8.1 |
| Attic ventilation | 1 sq ft net free area per 150 sq ft of attic (1/300 only when specific conditions are met) | IRC R806.2 |
| Dryer exhaust | 35 ft max, reduced for fittings, unless manufacturer says otherwise; no screen at the termination | IRC M1502.4.5.1, M1502.3 |
| T&P discharge pipe | Full valve-outlet size, not trapped, ends no more than 6 in. above floor or receptor, no threads at the end | IRC P2804.6.1 |
| Vent connectors | Rise at least ¼ in. per foot toward the vent or chimney | IRC M1803 |
IRC sections are in the 2021 International Residential Code. The notching rule is explained in ICC's CodeNotes on cutting, drilling, and notching; T&P discharge in ICC's water heater safety article.
Domain 2 in practice: a worked report example
Here's an original example of turning one observation into report language.
What you see: Under the kitchen sink, the drain trap is wet and the cabinet floor is swollen and stained. The trap drips when you run water. You can't see under the cabinet floor.
| Report part | Example wording |
|---|---|
| Describe | Kitchen sink drain: plastic trap and drain piping in the sink base cabinet. |
| Condition | Active leak at the drain trap when water was run. Cabinet floor is swollen and stained. |
| Why it matters | Continued leaking can damage the cabinet and the floor below and can lead to hidden moisture damage. |
| Limitation | The area under the cabinet floor isn't visible, so the extent of any damage there couldn't be determined. |
| Recommendation | Repair by a qualified plumber, then evaluate and repair the cabinet and any concealed damage found. |
A weaker version would say "the subfloor is rotted and must be replaced." That claims something you couldn't see and prescribes a repair. A too-thin version would say only "sink leaks," with no implication, limitation, or next step.
Domain 3 in plain terms
This domain is small (10%) but easy to lose points on, because the answers turn on ethics, not building science.
- Pre-inspection agreement: a written agreement that sets the scope, exclusions and limitations, liability limits, dispute resolution, and privacy terms before the work starts. Some states set the timing by law. New York, for example, requires the inspector to provide the client a written pre-inspection agreement describing the scope of service and its cost before performing the inspection (19 NYCRR §197-4.2, New York Department of State).
- Conflicts of interest: the test is whether anything gives the inspector a reason to shade the report. ASHI's Code of Ethics, for example, bars paying agents for referrals and bars paid repairs on covered systems for one year after an inspection (ASHI Code of Ethics, 1.C and 1.F).
- Confidentiality: results belong to the client. ASHI's code allows disclosing immediate safety hazards to exposed occupants (2.C).
- Objectivity: don't overstate or understate what you found (ASHI 2.B).
State rules vary. Learn the concepts for the exam, then learn your own state's rules for practice.
Registering and exam day
| Item | Current rule |
|---|---|
| Questions and time | 200 multiple choice (25 unscored pretest), 4 hours. PSI's current EBPHI bulletin says its introductory tutorial does not count against exam time; follow your own provider's appointment instructions. |
| Score | Scaled 200–800, pass at 500; you get your score report at the test center (mailed in Canada) |
| Fee | $225 in most states and Canada. Texas, Oklahoma, Illinois, South Dakota, and Washington differ. Confirm when you register |
| Test provider | PSI in most states. Florida, Nevada, and Texas use Pearson VUE. Illinois, Oklahoma, South Dakota, Tennessee, Vermont, and Washington use state-specific PSI registration programs/links. |
| Retakes | As many as you need unless your state limits them; 30-day wait; new fee each time |
| Accommodations | EBPHI's general policy advises requesting arrangements through the appropriate test administrator at least 15 business days before the desired test date. Follow the current process and deadline in your provider/jurisdiction instructions. |
| Veterans | If you pass and have GI Bill education benefits, you may be able to get the exam fee reimbursed through the VA |
Sources: EBPHI registration table, EBPHI Test Policies, EBPHI FAQ.
Find your state's registration link in EBPHI's registration table. Most states register through PSI's EBPHI page.
A few administration rules conflict between EBPHI's general policy page and PSI's current EBPHI bulletin. Your actual test provider, jurisdiction, and appointment confirmation control:
- Canceling or rescheduling: EBPHI's general page says at least four business days; PSI's current EBPHI bulletin says two days for PSI appointments. If you're testing through PSI and can act four business days ahead, doing so avoids relying on the shorter deadline. Pearson VUE and state-specific programs may use different rules.
- ID: EBPHI's general page says two forms of signature ID, one photo-bearing; PSI's current EBPHI bulletin says one valid, unexpired photo ID with a signature. Follow the ID list in your appointment confirmation and bring an additional acceptable ID as backup when permitted.
- Calculators: EBPHI's general page says calculators are not permitted; PSI's current EBPHI bulletin allows certain nonprogrammable calculators. Do not assume a calculator is allowed—follow your provider's current written instructions.
The week before
- Confirm your appointment, test center, and ID requirements from your confirmation.
- Confirm your state's licensing steps and how it wants your passing score.
- Do one timed mixed block, then review only your repeat misses.
- Review Domains 2 and 3 even if Domain 1 feels more urgent.
- Don't start a big new resource. Keep the last day lighter than the days before it.
Passing the NHIE isn't a license
Passing gets you an official score report. It doesn't license you. EBPHI says the NHIE is used in 35 states and several Canadian provinces, and that regulators have additional requirements (EBPHI FAQ). Your state board decides your education, experience, insurance, and application steps, and how to submit your score. Some states give options: New York accepts either the NHIE or its own state exam (NY Department of State). The NHIE is also a membership requirement for the American Society of Home Inspectors and several other associations.
Common questions
Is the NHIE hard? It's broad. You're tested across 19 tasks, from grading to gas venting to contract terms, with options that can be partly right. EBPHI doesn't publish a pass rate we could verify. Candidates who already work in one region sometimes get caught by systems they rarely see, so study every system in the outline, not just your local housing stock.
What percent do I need to pass? There's no published fixed percentage. You need a scaled 500, and the raw-score cut is set for each exam form.
Is there a free official practice test? EBPHI says it no longer offers an online sample test. It sells practice quizzes: a 50-question Whole House quiz and 25-question topic quizzes, each taken once per purchase, with feedback on missed questions at the end (EBPHI practice quizzes). PSI's bulletin lists them at $15 to $25. They're most useful as a format check after you've studied.
Which books does EBPHI reference? EBPHI's two NHIE manuals (Mechanical Systems & NHIE Content Manual, and Structural Systems & Business Manual, both 2019), the 2021 IRC, the 2021 NFPA 101 Life Safety Code Handbook, and the 2023 NEC. EBPHI says studying these sources doesn't by itself mean you'll pass, and you don't need to read them cover to cover (EBPHI FAQ).
Sources
- EBPHI content outline and candidate information, PSI NHIE bulletin (updated 12/10/2024): format, outline and task weights, scoring, references
- PSI NHIE bulletin with the previous and current outlines: 63/25/12 weights and the second-quarter 2024 change
- EBPHI Frequently Asked Questions: fee, scoring, score reports, references, practice materials, state use
- EBPHI Test Policies: fee exceptions, cancellation, retakes, accommodations, ID, scoring
- EBPHI registration table: test provider and registration link by state
- EBPHI practice quizzes
- ASHI Standard of Practice — ASHI states the existing standard remains current until the approved 2026 revision receives an implementation date; current-version PDF
- ASHI Code of Ethics
- 2021 International Residential Code
- New York Department of State: Home Inspection Professional Licensing Law and Regulations (March 2026), §197-4.2
- New York Department of State: Become a Home Inspector
Last verified October 4, 2026: exam format, content outline, scoring, fees, retake rules, test providers, and policies against EBPHI's FAQ, Test Policies, and registration pages and PSI's EBPHI bulletin; ASHI's Standard of Practice status and Code of Ethics on homeinspector.org. Fees, vendors, and state rules can change.
Written by the Castleport Test Prep Editorial Team. See how we verify exam claims and our corrections log.
Castleport Test Prep is an independent exam prep publisher and is not affiliated with, endorsed by, or approved by the Examination Board of Professional Home Inspectors (EBPHI), PSI, Pearson VUE, the American Society of Home Inspectors, or any state licensing board. NHIE and National Home Inspector Examination identify the exam this page covers; trademarks belong to their respective owners. The practice questions here are original Castleport study material, not official exam questions.