Free Master Plumber Practice Test
47 original master-level questions on sizing, venting, water supply, indirect waste, storm drainage, fuel gas, plan reading, safety and business law, each with the answer, an explanation and the code section to look up. Master exams are set by each state, so check how yours is built in the table after the test.
Unofficial practice · Free, no signup
Unofficial practice for US state master plumber exams · Free, no signup · Original questions, not real exam questions · The code edition is named on every question. If your state tests the UPC, the National Standard Plumbing Code or its own state code, some numbers will differ.
Master plumber practice test (47 questions)
Question 1 · 2024 IPC
A 4-inch building drain is installed at a slope of ¼ inch per foot. What is the maximum drainage fixture unit (DFU) load it may carry?
Check answer
Answer: B. 216 DFU
Table 710.1(1) rates a 4-inch building drain at 180 DFU at ⅛ in/ft, 216 at ¼ in/ft and 250 at ½ in/ft. More slope means more capacity from the same pipe, so read the column for the slope you're installing. 180 is the ⅛ in/ft figure and 250 the ½ in/ft figure. 840 is the 6-inch drain at ¼ in/ft, which means the wrong row.
Look up: IPC Table 710.1(1).
Source: 2024 IPC-based text (2025 Plumbing Code of New York State, Public.Resource.Org)
Question 2 · 2024 IPC
A building drain will carry 200 DFU at a slope of ⅛ inch per foot. Which is the smallest of these pipe sizes that can carry that load?
Check answer
Answer: C. 6 inch
At ⅛ in/ft, Table 710.1(1) allows 36 DFU on a 3-inch drain, 180 on a 4-inch and 700 on a 6-inch. 200 DFU is more than the 4-inch limit, so 4-inch fails at this slope even though it would pass at ¼ in/ft (216). 6-inch is the smallest size listed that carries the load. 8-inch works but isn't the smallest.
Look up: IPC Table 710.1(1).
Source: 2024 IPC-based text (2025 Plumbing Code of New York State, Public.Resource.Org)
Question 3 · 2024 IPC
A 4-inch building drain must carry 200 DFU. What is the minimum slope that allows it?
Check answer
Answer: C. ¼ inch per foot
At ⅛ in/ft a 4-inch building drain is rated for 180 DFU, short of 200. At ¼ in/ft it's rated for 216, which covers the load. The table gives no 1/16 in/ft rating for 4-inch pipe at all. ½ in/ft works too, but it isn't the minimum. This is the previous question turned around: master exams ask you to solve for size or for slope from the same table.
Look up: IPC Table 710.1(1).
Source: 2024 IPC-based text (2025 Plumbing Code of New York State, Public.Resource.Org)
Question 4 · 2024 IPC
What is the minimum size of a building drain that serves a water closet?
Check answer
Answer: B. 3 inch
A footnote to Table 710.1(1) sets 3 inches as the minimum for any building drain serving a water closet, no matter how few DFU it carries. 2-inch is too small even for a single toilet. 4-inch is a common job-site choice, but it isn't the code minimum, and 6-inch is a design choice for large loads.
Look up: IPC Table 710.1(1), footnote a.
Source: 2024 IPC-based text (2025 Plumbing Code of New York State, Public.Resource.Org)
Question 5 · 2024 IPC
What is the maximum total DFU load on a 3-inch horizontal fixture branch?
Check answer
Answer: B. 20 DFU
Table 710.1(2) limits a 3-inch horizontal fixture branch to 20 DFU. 48 is the limit for a 3-inch stack of three branch intervals or fewer, so it comes from reading the stack column instead of the branch column. 6 is the 2-inch branch limit and 160 is the 4-inch branch limit.
Look up: IPC Table 710.1(2).
Source: 2024 IPC-based text (2025 Plumbing Code of New York State, Public.Resource.Org)
Question 6 · 2024 IPC
What are the minimum dimensions of a sump pit for a sewage pump?
Check answer
Answer: D. 18 inches in diameter and 24 inches deep
The pit must be at least 18 inches in diameter and 24 inches deep. The other three choices each fall short on diameter, depth or both. The same section also requires a gastight removable cover and a vent that meets Chapter 9, because a sealed sewage pit still needs air.
Look up: IPC 712.3.2.
Source: 2024 IPC-based text (2025 Plumbing Code of New York State, Public.Resource.Org)
Question 7 · 2024 IPC
A sewage pump receives discharge from water closets. What size spherical solids must it be able to pass?
Check answer
Answer: D. 2 inches
Pumps that receive water closet discharge must pass 2-inch spherical solids. ½ inch is the requirement for pumps that don't receive water closets, so it's the trap answer here. 1 inch and 1½ inches aren't the code's figures. Grinder pumps and macerating toilets have their own exceptions in the same section.
Look up: IPC 712.4.2.
Source: 2024 IPC-based text (2025 Plumbing Code of New York State, Public.Resource.Org)
Question 8 · 2024 IPC
A sewage pump discharge line connects to a horizontal building drain. How must the connection be made?
Check answer
Answer: D. Through a wye fitting into the top of the drain, at least 10 pipe diameters from the base of any stack
Pumped flow enters from the top through a wye, so it joins the gravity flow without backing it up. Keeping 10 pipe diameters away from the base of a stack keeps it out of the turbulent zone where the stack turns horizontal. A side or bottom entry, or a connection at the stack base, puts pumped flow where it fights the gravity flow.
Look up: IPC 712.3.5.
Source: 2024 IPC-based text (2025 Plumbing Code of New York State, Public.Resource.Org)
Question 9 · 2021 & 2024 IPC
A vent stack is required for every drainage stack with how many branch intervals?
Check answer
Answer: A. Five or more
Five or more branch intervals triggers a vent stack. A branch interval is a vertical stretch of stack, at least 8 ft, where horizontal branches connect. 'More than 10' is the separate trigger for relief vents (next question), which is why the two numbers get swapped. Eight isn't a trigger at all; it's the minimum height of one branch interval.
Look up: IPC 904.2.
Source: ICC Building Safety Journal: venting methods in the 2021 IPC · 2024 IPC-based text (2025 Plumbing Code of New York State, Public.Resource.Org)
Question 10 · 2024 IPC
Relief vents are required for drainage stacks in buildings having more than how many branch intervals?
Check answer
Answer: C. 10
In buildings with more than 10 branch intervals, stacks need relief vents to balance pressure along that height. 5 is the vent-stack trigger from the previous question, 8 is the minimum height of a branch interval in feet, and 15 isn't a code threshold.
Look up: IPC 908.1.
Source: 2024 IPC-based text (2025 Plumbing Code of New York State, Public.Resource.Org)
Question 11 · 2024 IPC
A building is in a climate where the 97.5-percent winter design temperature is 0°F. What does the IPC require for a vent extension through the roof?
Check answer
Answer: D. At least 3 inches in diameter, with any size increase made at least 1 foot inside the thermal envelope
Frost-closure protection requires vent extensions of at least 3 inches. Any increase in size must start at least 1 foot inside the thermal envelope, where the pipe is still warm, so frost can't build up at a reducer in cold air. Options that put the increase at or above the roof, or outside the envelope, put the reducer where it can freeze shut. The rule applies where the 97.5% design temperature is 0°F or lower.
Look up: IPC 903.2.
Source: 2024 IPC-based text (2025 Plumbing Code of New York State, Public.Resource.Org)
Question 12 · 2024 IPC
Before it turns horizontal, a dry vent must rise vertically to at least how far above the flood level rim of the highest trap or trapped fixture it serves?
Check answer
Answer: C. 6 inches
At least 6 inches. If the drain backs up, waste then can't run into the horizontal vent and block it. 2 and 4 inches leave too little margin, and 12 inches is more than the code asks.
Look up: IPC 905.4.
Source: 2024 IPC-based text (2025 Plumbing Code of New York State, Public.Resource.Org)
Question 13 · 2021 & 2024 IPC
What is the minimum size of a water service pipe?
Check answer
Answer: A. ¾ inch
The water service must be at least ¾ inch. Larger sizes come from the design calculation for the building's demand, so 1 inch and up are common results but not the code minimum.
Look up: IPC 603.1.
Source: 2024 IPC-based text (2025 Plumbing Code of New York State, Public.Resource.Org)
Question 14 · 2021 & 2024 IPC
A water service will share a trench with, and run within 5 feet of, a building sewer made of a material not listed in Table 702.2. The water service won't be sleeved. Which arrangement complies?
Check answer
Answer: A. The bottom of the water service is at least 12 inches above the top of the building sewer
The default rule is 5 feet of horizontal separation in undisturbed or compacted earth. Closer is allowed only if the sewer is a Table 702.2 material, the water service is sleeved at a crossing, or the bottom of the water service is at least 12 inches above the top of the sewer. 6 inches above isn't enough, and 3 feet apart is less than the 5 feet required. Running the water line below the sewer is the worst choice, because a leaking sewer drains toward it.
Look up: IPC 603.2.
Source: 2024 IPC-based text (2025 Plumbing Code of New York State, Public.Resource.Org) · Ohio Plumbing Code rule 4101:3-6-01 (2021 IPC-based)
Question 15 · 2021 & 2024 IPC
Under the IPC, what is the maximum developed length of hot or tempered water piping from the source of hot water to the fixtures it serves?
Check answer
Answer: B. 50 feet
The IPC limits this to 50 feet. Beyond that you need a circulating system or heat-trace piping so users don't wait for hot water. 100 feet is the IRC's residential figure, which is the usual trap for candidates who study both codes. 25 and 75 feet aren't code figures. In the 2024 edition the circulation and heat-trace subsection moves from 607.2.1 to 607.2.2.
Look up: IPC 607.2.
Source: 2012 IPC text (Public.Resource.Org) · 2024 IPC-based text (2025 Plumbing Code of New York State, Public.Resource.Org) · ICC 2024 IPC significant changes (EduCode session)
Question 16 · 2021 IPC
Lavatories in a public toilet room receive tempered water through an ASSE 1070 temperature-limiting device. The device must be set to deliver water no hotter than:
Check answer
Answer: B. 110°F
Tempered water from an ASSE 1070 (also ASME A112.1070/CSA B125.70) device must be set no higher than 110°F. 120°F is the limit for bathtub and whirlpool fillers, a different provision for different fixtures. 100°F is below the limit, and 140°F is a water heater storage temperature, not a delivery limit.
Look up: IPC 607.1.2; public hand-washing provision in Chapter 4 (419.5 in 2021).
Source: ICC Building Safety Journal: hot water safety
Question 17 · 2024 IPC
A storage water heater's cold water supply passes through a pressure-reducing valve, which keeps expanding water from flowing back into the main. What else does the IPC require?
Check answer
Answer: C. A thermal expansion control device downstream of the pressure-reducing valve, sized per the manufacturer
A check valve, PRV or backflow preventer on the cold supply closes the system. When water heats and expands, pressure has nowhere to go, so the code requires a thermal expansion control device (typically an expansion tank) on the heater side of those devices. It must be sized so pressure stays within the IPC's maximum pressure limit (604.8). Relying on the relief valve to drip every heating cycle doesn't comply. A vacuum relief valve or a second PRV doesn't give the expanding water anywhere to go.
Look up: IPC 607.3.
Source: 2024 IPC-based text (2025 Plumbing Code of New York State, Public.Resource.Org)
Question 18 · 2021 IPC
What is the maximum flow rate for a public lavatory faucet that is not a metering faucet?
Check answer
Answer: D. 0.5 gpm at 60 psi
Table 604.4 limits public, non-metering lavatory faucets to 0.5 gpm at 60 psi. 2.2 gpm at 60 psi is the private lavatory limit, and 1.5 and 1.0 gpm aren't lavatory figures in the table. Metering faucets are rated by volume per cycle (0.25 gallon) rather than gpm.
Look up: IPC Table 604.4.
Source: ICC, 2021 IPC Group A code-change proposals (reproduces 2021 text)
Question 19 · 2024 IPC (edition change)
Under the 2024 IPC, what is the maximum flow rate for a showerhead?
Check answer
Answer: C. 2.0 gpm at 80 psi
The 2024 IPC lowered the showerhead maximum to 2.0 gpm at 80 psi. 2.5 gpm is the 2021 figure, so if your exam still uses the 2021 edition, 2.5 is correct there. 1.8 and 1.5 gpm aren't IPC figures, although some states set lower limits by amendment. Always check the edition and amendments your exam uses.
Look up: IPC Table 604.4.
Source: ICC 2024 IPC significant changes (EduCode session) · ICC, 2021 IPC Group A code-change proposals (reproduces 2021 text)
Question 20 · 2021 & 2024 IPC
When must a reduced pressure principle backflow prevention assembly be tested?
Check answer
Answer: A. At the time of installation, immediately after repairs or relocation, and at least annually
Testable assemblies must be tested when installed, after any repair or relocation, and at least once a year. A device that fails gives no visible warning, so the annual test is the only way to know it still protects the supply. Testing only once, every 5 years, or on request leaves years when a failed device goes unnoticed.
Look up: IPC 312.10.2 (2021) / 312.11.2 (2024).
Source: ICC, 2021 IPC Group A code-change proposals (reproduces 2021 text) · 2024 IPC-based text (2025 Plumbing Code of New York State, Public.Resource.Org)
Question 21 · 2024 IPC
Which settings does the IPC require for a water heater's combination temperature and pressure relief valve?
Check answer
Answer: A. Temperature not more than 210°F; pressure not more than the heater's rated working pressure or 150 psi, whichever is less
The answer is 210°F and the lesser of the rated working pressure or 150 psi. 'Whichever is greater' would let the valve stay closed above what the tank is built to handle, which is why that option is the trap. 180°F/125 psi and 250°F/200 psi aren't the code's settings.
Look up: IPC 504.5 (2024 numbering).
Source: 2024 IPC-based text (2025 Plumbing Code of New York State, Public.Resource.Org)
Question 22 · 2024 IPC
The temperature-sensing element of a water heater's relief valve must monitor the water within which part of the tank?
Check answer
Answer: D. The top 6 inches
Hot water rises, so the hottest water sits at the top of the tank. The element must sense the top 6 inches so the valve responds to the true maximum temperature. The shallower figures aren't in the code.
Look up: IPC 504.4.1.
Source: 2024 IPC-based text (2025 Plumbing Code of New York State, Public.Resource.Org)
Question 23 · 2024 IPC
A commercial refrigerator used for food storage needs a waste connection. How must it discharge?
Check answer
Answer: C. Indirectly through an air gap
Food storage, preparation and handling equipment must discharge indirectly through an air gap, an open vertical space between the equipment's waste pipe and the receptor. That physical break means a backup can't reach the food. An air break is allowed for some other equipment, but not food storage. Direct connections, with or without a backwater valve, give sewage a path back into the equipment.
Look up: IPC 802.1.1.
Source: 2024 IPC-based text (2025 Plumbing Code of New York State, Public.Resource.Org)
Question 24 · 2024 IPC
Which method is acceptable for connecting a commercial dishwashing machine to the drainage system?
Check answer
Answer: A. Indirectly through an air break
Commercial dishwashing machines discharge indirectly through an air gap or an air break. An air break (the waste pipe ends below the receptor's rim but isn't sealed into it) is allowed here, even though food storage equipment needs a full air gap. A direct trapped connection isn't allowed, and check valves and backwater valves can fail. Neither substitutes for an indirect connection.
Look up: IPC Section 802.1 (commercial dishwashing machines).
Source: 2024 IPC-based text (2025 Plumbing Code of New York State, Public.Resource.Org)
Question 25 · 2024 IPC
At what point must an indirect waste pipe be trapped?
Check answer
Answer: D. When it exceeds 30 inches in developed length measured horizontally, or 54 inches in total developed length
Past 30 inches horizontally or 54 inches in total developed length, an indirect waste pipe needs its own trap. A long pipe can foul and give off odor at its open end. The shorter figures aren't the code's numbers. Older study guides quote different limits and section numbers, so use your exam's edition.
Look up: IPC Section 802, indirect waste piping (802.3 in 2024; 802.2 in 2018).
Source: 2024 IPC-based text (2025 Plumbing Code of New York State, Public.Resource.Org)
Question 26 · 2024 IPC
Which installation is prohibited?
Check answer
Answer: A. A food waste disposer discharging into a grease interceptor
A food waste disposer must not discharge to a grease interceptor. Ground food solids fill the interceptor and stop it separating grease. Pot sinks and grease-laden prep fixtures are exactly what interceptors and automatic grease removal devices are for, so the other three installations are normal.
Look up: IPC 1003.3.1 and 1003.3.2.
Source: 2024 IPC-based text (2025 Plumbing Code of New York State, Public.Resource.Org)
Question 27 · 2024 IPC
Can storm water from a roof drain into a public sewer that is intended for sewage only?
Check answer
Answer: C. No; storm water must not drain into sewers intended for sewage only
Storm water is prohibited from sewers intended for sewage only, because storm surges overload sanitary sewers and treatment plants. Traps and backwater valves don't change what the sewer is designed to carry, and the code has no small-roof exception. Combined sewers are a separate case, where the local authority allows them.
Look up: IPC 1101.3.
Source: 2024 IPC-based text (2025 Plumbing Code of New York State, Public.Resource.Org)
Question 28 · 2024 IPC
Where must a secondary (emergency) roof drainage system discharge?
Check answer
Answer: B. Above grade, where building occupants or maintenance personnel would normally see it
Secondary drains need their own discharge, separate from the primary system, above grade and where people will notice it. Water coming out of the secondary system is the warning that the primary drains are blocked. Tying into the primary drain or the sanitary sewer, or hiding the discharge below grade, defeats that warning.
Look up: IPC 1108.2.
Source: 2024 IPC-based text (2025 Plumbing Code of New York State, Public.Resource.Org)
Question 29 · 2024 IPC
How is a secondary roof drainage system sized?
Check answer
Answer: D. On the same rainfall rate as the primary system, without counting flow through the primary system
The secondary system must handle the full design storm by itself, because it exists for when the primary drains are blocked. So it's sized on the same rainfall rate, with no credit for primary flow. Half the rate undersizes it, while adding primary flow or doubling the rate oversizes it beyond what the code asks. Scuppers used as secondary drains must be at least 4 inches high.
Look up: IPC 1108.3.
Source: 2024 IPC-based text (2025 Plumbing Code of New York State, Public.Resource.Org)
Question 30 · 2021 IPC
What is the Table 403.1 water closet ratio for a Business (B) occupancy?
Check answer
Answer: A. 1 per 25 for the first 50 occupants, then 1 per 50 for the remainder exceeding 50
Business occupancies use a two-step ratio: 1 water closet per 25 occupants up to 50, then 1 per 50 beyond that. The last option is the Business lavatory ratio, the usual mix-up when reading across the row. The single flat ratios aren't what the table says. When you calculate a real count, also apply 403.1.1, which covers how the total is split between sexes and how fractions are handled.
Look up: IPC Table 403.1 and 403.1.1.
Source: ICC, 2021 IPC Group A code-change proposals (reproduces 2021 text)
Question 31 · 2024 IPC
A Business occupancy has a total occupant load of 22. Under the 2024 IPC, are separate toilet facilities for each sex required?
Check answer
Answer: D. No; Business occupancies with an occupant load of 25 or fewer are exempt
Section 403.2 lists several exceptions to separate facilities, and one covers Business occupancies with a total occupant load of 25 or fewer. The general 'total occupant load of 15 or fewer' exception exists too, but this building qualifies under the Business one, so exceeding 15 doesn't matter. Drinking fountains have nothing to do with it. The 2024 edition also allows all-gender multi-user toilet rooms with stall privacy.
Look up: IPC 403.2 (exceptions).
Source: 2024 IPC-based text (2025 Plumbing Code of New York State, Public.Resource.Org) · ICC 2024 IPC significant changes (EduCode session)
Question 32 · 2021 IPC
How many drinking fountains does Table 403.1 require for a Business occupancy?
Check answer
Answer: B. 1 per 100 occupants
Business occupancies need 1 drinking fountain per 100 occupants, plus 1 service sink. The other ratios belong to other occupancy rows or don't appear at all. Chapter 4 also lets bottle fillers or water dispensers substitute in some cases, so check Section 410 when you size a real job.
Look up: IPC Table 403.1.
Source: ICC, 2021 IPC Group A code-change proposals (reproduces 2021 text)
Question 33 · 2024 IFGC
New gas piping will have a maximum working pressure of 5 psig. What is the minimum test pressure?
Check answer
Answer: C. 7.5 psig
Test pressure is at least 1½ times the proposed maximum working pressure, and never less than 3 psig. 1.5 × 5 = 7.5 psig. 3 psig is only the floor, which controls for low-pressure systems. Testing at the working pressure (5 psig) proves nothing beyond normal use. 10 psig is more than required, but it isn't the minimum.
Look up: IFGC 406.4.1.
Source: 2024 IFGC-based text (2025 Fuel Gas Code of New York State, Public.Resource.Org)
Question 34 · 2024 IFGC
A commercial gas piping system has a volume of 1,000 cubic feet. What is the minimum duration of the pressure test?
Check answer
Answer: D. 1 hour
The test lasts at least ½ hour for each 500 cubic feet of pipe volume: 1,000 ÷ 500 = 2, and 2 × ½ hour = 1 hour. The 10-minute minimum applies only to systems under 10 cubic feet or to single-family dwellings, so it's the trap here. (NFPA 54, used in some states instead of the IFGC, has its own duration rules.) 30 minutes covers only 500 cubic feet.
Look up: IFGC 406.4.2.
Source: 2024 IFGC-based text (2025 Fuel Gas Code of New York State, Public.Resource.Org) · Rehoboth Beach, DE gas test form quoting 2018 IFGC 406.4.2
Source-link status — October 2, 2026: The Rehoboth Beach secondary gas-test form returned 404 and could not be independently retrieved. The primary 2024 IFGC-based New York fuel-gas source cited above remains accessible; the unavailable form is not a replacement for your jurisdiction's code.
Question 35 · 2024 IFGC
An appliance shutoff valve must be located within what distance of the appliance it serves?
Check answer
Answer: B. 6 feet
Within 6 feet, so whoever services the appliance can shut off its gas quickly. The other distances aren't the code's figure. The section also has location and access requirements, with exceptions for some specific appliances.
Look up: IFGC 409.5.1.
Source: 2024 IFGC-based text (2025 Fuel Gas Code of New York State, Public.Resource.Org)
Question 36 · 2024 IFGC
Where must the sediment trap for a gas furnace be installed?
Check answer
Answer: D. Downstream of the appliance shutoff valve, as close to the appliance inlet as practical
The sediment trap goes after the shutoff valve and close to the appliance. Debris then drops out before it reaches the controls, and the trap can be cleaned with the gas off. At the meter or upstream of the valve it can't protect the appliance as well, and sediment collects at low points, not high ones. Some appliances, such as gas ranges and clothes dryers, are exempt, but a furnace isn't.
Look up: IFGC 408.4.
Source: 2024 IFGC-based text (2025 Fuel Gas Code of New York State, Public.Resource.Org)
Question 37 · Calculation
A rectangular tank is 4 feet long and 3 feet wide, and is filled to a depth of 5 feet. Using 1 cubic foot = 7.48 gallons, about how many gallons does it hold?
Check answer
Answer: C. 449 gallons
Volume = 4 × 3 × 5 = 60 cubic feet, and 60 × 7.48 = 448.8, or about 449 gallons. 360 comes from multiplying 60 by 6 instead of 7.48. NIST lists 1 cubic foot as 7.481 US gallons, and exams usually round it to 7.48.
Look up: NIST Handbook 44, Appendix C (unit conversions).
Source: NIST Handbook 44 (2026), Appendix C
Question 38 · Calculation
A 45-degree offset has an offset (the distance between the two parallel pipe runs) of 24 inches. About how long is the travel, the diagonal piece measured center to center?
Check answer
Answer: C. 34 inches
In a 45° offset the offset and the run are equal, so the travel is the hypotenuse: offset × √2, or offset × 1.414. 24 × 1.414 = 33.9, about 34 inches. 17 inches comes from dividing by 1.414 instead of multiplying. 24 inches assumes the travel equals the offset, and 48 inches doubles it.
Look up: Right-triangle geometry (√2 ≈ 1.414).
Question 39 · OSHA 29 CFR 1926
Your crew will dig a trench 6 feet deep in ordinary soil (not stable rock) to install a building sewer. What does OSHA require?
Check answer
Answer: A. A protective system: sloping, benching, shoring or shielding
Excavations need a protective system unless they are entirely in stable rock, or less than 5 feet deep with no sign of cave-in found by a competent person. At 6 feet in soil, neither exception applies, and 'looks firm' isn't an exception. 20 feet is the depth beyond which a registered professional engineer must design the protective system, not the depth where protection starts.
Look up: 29 CFR 1926.652(a)(1).
Source: 29 CFR 1926.652 (eCFR)
Question 40 · OSHA 29 CFR 1926
In a trench 4 feet deep or more, a stairway, ladder, ramp or other means of egress must be within how much lateral travel of every worker?
Check answer
Answer: B. 25 feet
No more than 25 feet of lateral travel in trenches 4 feet deep or deeper. The other distances aren't the rule. Note the different depth triggers: egress at 4 feet, protective systems at 5 feet.
Look up: 29 CFR 1926.651(c)(2).
Source: 29 CFR 1926.651 (eCFR)
Question 41 · Federal rule
You hire a new apprentice for ongoing employment expected to last more than three business days. Under federal rules, when must you, as the employer, complete Section 2 of Form I-9?
Check answer
Answer: B. Within three business days of the employee's first day of work
For employment lasting three business days or more, the employer completes Section 2 within three business days after the employee's first day of employment. If the job will last fewer than three business days, Section 2 is due no later than the first day; the stem excludes that exception. The employee completes Section 1 by the first day of work. State business-law sections can also test state rules, so check your bulletin.
Look up: 8 CFR 274a.2(b)(1)(ii).
Source: 8 CFR 274a.2 (eCFR)
Question 42 · Federal rule
Under the federal Fair Labor Standards Act, how must non-exempt employees be paid for overtime?
Check answer
Answer: A. At least 1½ times the regular rate for hours worked over 40 in a workweek
Federal overtime is based on the workweek, not the day, and the rate is at least time and a half for hours over 40. Daily overtime exists only under some state laws, double time isn't a federal requirement, and 44 hours is an old historical threshold. Check your state if your exam includes state business law.
Look up: 29 CFR 778.101 and 778.107.
Source: 29 CFR Part 778 (eCFR)
Plan reading drill (Questions 43–47)
Plan reading is the largest single area on ICC's National Standard Master Plumber outline (23%), and Colorado's master exam has 10 isometric-analysis items. These five questions use one practice plan.
Practice plan P-1 (an original practice drawing, described in text). Two-story single-family dwelling.
| Location | Fixtures shown |
|---|---|
| Second-floor bathroom | Water closet (1.6 gpf), lavatory, bathtub. These form one bathroom group. |
| First-floor powder room | Water closet (1.6 gpf), lavatory |
| Kitchen | Domestic kitchen sink |
| Laundry | Residential automatic clothes washer |
Plan notes:
- Building drain: 4-inch, 40 ft developed length from the base of the stack to the building sewer, sloped at 1/8 inch per foot.
- Invert elevation of the building drain at the base of the stack: 96.50 ft.
- Kitchen sink: 1½-inch trap. Trap arm developed length from trap weir to vent: 7 ft, sloped at 1/4 inch per foot.
Question 43 · 2021 IPC
Using Practice plan P-1 and Table 709.1, what is the total drainage fixture unit load on the building drain?
Check answer
Answer: B. 13 DFU
Bathroom group with a 1.6-gpf water closet = 5, powder room water closet (private, 1.6 gpf) = 3, powder room lavatory = 1, domestic kitchen sink = 2, residential clothes washer = 2. Total: 5 + 3 + 1 + 2 + 2 = 13 DFU. 14 comes from adding the bathroom group's fixtures one by one (3 + 1 + 2 = 6) instead of using the bathroom-group value of 5. 11 leaves out the washer or the sink. When fixtures form a bathroom group, use the group line.
Look up: IPC Table 709.1.
Source: ICC, 2021 IPC Group A code-change proposals (reproduces 2021 text)
Question 44 · Calculation
Practice plan P-1 shows a 40-ft building drain sloped at ⅛ inch per foot. How much does it fall over its length?
Check answer
Answer: B. 5 inches
Fall = length × slope = 40 ft × ⅛ in/ft = 5 inches. 10 inches would be the fall at ¼ in/ft, and 20 inches at ½ in/ft. 2½ inches would be the fall at 1/16 in/ft.
Look up: Plan note 1 (length × slope).
Question 45 · Calculation
On Practice plan P-1, the building drain invert at the base of the stack is 96.50 ft. What is the invert elevation where the drain meets the building sewer, 40 ft downstream?
Check answer
Answer: A. 96.08 ft
The drain drops 5 inches over 40 ft (previous question). Convert to feet before subtracting: 5 ÷ 12 = 0.42 ft, so 96.50 − 0.42 = 96.08 ft. 96.00 treats 5 inches as 0.5 ft, 95.50 subtracts a full foot, and 91.50 subtracts 5 feet instead of 5 inches. Mixing inches and decimal feet is the most common error on elevation questions.
Look up: Plan notes 1 and 2 (unit conversion).
Question 46 · 2021 IPC Table 709.1 / 2024 IPC Table 710.1(1)
The building drain on Practice plan P-1 carries every fixture shown and stays at ⅛ inch per foot. What is the smallest building drain size the IPC allows for this house?
Check answer
Answer: B. 3 inch
The plan's total load is 13 DFU (Question 43). Two rules apply. A building drain serving a water closet must be at least 3 inches (footnote a to Table 710.1(1)), which rules out 2 inches. A 3-inch building drain at ⅛ in/ft is rated for 36 DFU, comfortably above 13. The plan's 4-inch drain is allowed, but it isn't the minimum, and 6-inch is far larger than needed.
Look up: IPC Table 710.1(1) and footnote a.
Source: 2024 IPC-based text (2025 Plumbing Code of New York State, Public.Resource.Org) · ICC, 2021 IPC Group A code-change proposals (reproduces 2021 text)
Question 47 · 2021 IPC
Practice plan P-1 shows the kitchen sink's 1½-inch trap with a 7-ft trap arm sloped at ¼ inch per foot. Does it comply with Table 909.1?
Check answer
Answer: C. No; the limit for a 1½-inch trap at ¼ inch per foot is 6 feet
Table 909.1 limits the distance from a 1½-inch trap to its vent to 6 feet at ¼ in/ft, so a 7-ft arm doesn't comply. Fix it by moving the vent closer. 8 feet is the 2-inch trap limit, 12 feet the 3-inch limit and 5 feet the 1¼-inch limit, so each wrong answer comes from reading the wrong row.
Look up: IPC Table 909.1 (2021 numbering).
Source: ICC 2021 plumbing venting brochure
Your first-attempt results
First-attempt score: 0/47 correct-first (0.0% of all 47 questions)
Your percentage is feedback on these 47 questions, not an official score or a pass prediction.
- Answered: 0
- Untouched: 47
- Assisted: 0
- Incorrect first: 0
Select an answer, then choose Check answer to lock your first attempt. Opening an answer first counts as assisted, and assisted questions are never scored correct-first. Viewing the answer key or printing counts all unattempted questions as assisted.
| Domain | Correct-first | Incorrect-first | Assisted | Untouched |
|---|---|---|---|---|
| Business and employment law | 0 of 2 | 0 | 0 | 2 |
| Fixture and facility requirements | 0 of 3 | 0 | 0 | 3 |
| Fuel gas | 0 of 4 | 0 | 0 | 4 |
| Indirect waste and interceptors | 0 of 4 | 0 | 0 | 4 |
| Jobsite safety | 0 of 2 | 0 | 0 | 2 |
| Plan reading | 0 of 5 | 0 | 0 | 5 |
| Plumbing math | 0 of 2 | 0 | 0 | 2 |
| Sanitary drainage sizing, sumps and ejectors | 0 of 8 | 0 | 0 | 8 |
| Storm drainage | 0 of 3 | 0 | 0 | 3 |
| Venting design | 0 of 4 | 0 | 0 | 4 |
| Water heaters | 0 of 2 | 0 | 0 | 2 |
| Water supply design and backflow | 0 of 8 | 0 | 0 | 8 |
Answer key
Use this to score a printed or offline attempt. Each question above has its full explanation.
| Q | Answer | Topic |
|---|---|---|
| 1 | B | Sanitary drainage sizing, sumps and ejectors |
| 2 | C | Sanitary drainage sizing, sumps and ejectors |
| 3 | C | Sanitary drainage sizing, sumps and ejectors |
| 4 | B | Sanitary drainage sizing, sumps and ejectors |
| 5 | B | Sanitary drainage sizing, sumps and ejectors |
| 6 | D | Sanitary drainage sizing, sumps and ejectors |
| 7 | D | Sanitary drainage sizing, sumps and ejectors |
| 8 | D | Sanitary drainage sizing, sumps and ejectors |
| 9 | A | Venting design |
| 10 | C | Venting design |
| 11 | D | Venting design |
| 12 | C | Venting design |
| 13 | A | Water supply design and backflow |
| 14 | A | Water supply design and backflow |
| 15 | B | Water supply design and backflow |
| 16 | B | Water supply design and backflow |
| 17 | C | Water supply design and backflow |
| 18 | D | Water supply design and backflow |
| 19 | C | Water supply design and backflow |
| 20 | A | Water supply design and backflow |
| 21 | A | Water heaters |
| 22 | D | Water heaters |
| 23 | C | Indirect waste and interceptors |
| 24 | A | Indirect waste and interceptors |
| 25 | D | Indirect waste and interceptors |
| 26 | A | Indirect waste and interceptors |
| 27 | C | Storm drainage |
| 28 | B | Storm drainage |
| 29 | D | Storm drainage |
| 30 | A | Fixture and facility requirements |
| 31 | D | Fixture and facility requirements |
| 32 | B | Fixture and facility requirements |
| 33 | C | Fuel gas |
| 34 | D | Fuel gas |
| 35 | B | Fuel gas |
| 36 | D | Fuel gas |
| 37 | C | Plumbing math |
| 38 | C | Plumbing math |
| 39 | A | Jobsite safety |
| 40 | B | Jobsite safety |
| 41 | B | Business and employment law |
| 42 | A | Business and employment law |
| 43 | B | Plan reading |
| 44 | B | Plan reading |
| 45 | A | Plan reading |
| 46 | B | Plan reading |
| 47 | C | Plan reading |
What your score means: your percentage is feedback on these 47 original questions. It isn't an official score, a pass prediction or proof that you're ready for your state's exam. Some topics have only two to five questions here, so treat a topic result as a pointer to what to review, not a measurement of your ability.
How master plumber exams differ by state
There is no single nationwide master plumber licensing exam. The licensing authority chooses the code, edition, format and whether you can bring a book. Here's how nine published exams compare.
| Exam | Code tested | Format | To pass | Book rules |
|---|---|---|---|---|
| ICC National Standard Master Plumber (used where a jurisdiction adopts it) | International Plumbing Code; edition set by your jurisdiction | 100 multiple-choice items, 4 hours | Set by your jurisdiction | Open book |
| Colorado | 2021 IPC + 2021 IRC; 2024 editions from Nov. 1, 2026 (2021 on request until Feb. 1, 2027) | 120 scored items, 270 min, plus up to 10 unscored items | 84 correct (70%) | Codes provided at the test center; no writing, highlighting or tabs |
| Georgia | 2024 Georgia Plumbing and Gas Codes | Class I: 120 items · Class II: 140 items · 7 hours in two parts · includes 40 business, administrative and design items | Scaled score of 70 | Closed book |
| Maryland (Master Plumber/Gas Fitter) | 2018 IPC + 2018 IFGC | 100 items, 240 min (40 are gas) | 70% | Open book; indexing and highlighting allowed; approved tab types only |
| Massachusetts | State plumbing code (248 CMR) + NFPA 54 and 58 | Part I: 80 items, 160 min · Part II: 40 items, 160 min (isometrics, calculations, gas) | 70% on each part | Closed book |
| Minnesota | Minnesota Plumbing Code | 300 points, 5½ hours | 70% | Code and calculator provided |
| Montana | 2021 UPC + board statutes and rules | 125 items, 3 hours | 70% | Open book; your own UPC with factory tabs; rules packet provided |
| New Jersey | 2021 National Standard Plumbing Code | Trade exam: 100 items, 195 min · plus a Business and Law exam (50 items, 130 min) and a practical exam (25 items, 130 min) | 70% on each exam | Trade exam is open book |
| Texas | 2018 IPC + 2018 IFGC, or 2018 UPC | 308 items, 360 min + a 30-min break | 70% | Closed book |
Checked October 2, 2026 against each state's or vendor's current posted document. The Minnesota guide is dated April 2022 and the Montana sheet January 2023; those are the latest versions we found. Bulletins change, so download the current one from your board or test vendor before you study. North Carolina's Plumbing Contractor path also lists a separate 1.5-hour Business and Law exam, with an exemption noted for some applicants who already hold an active Board contractor license and previously passed the Board exam after August 2003.
Is the master plumber exam open book?
Not everywhere, and the master exam can be stricter than the journeyman exam you already passed.
- Closed book: Texas, Georgia and Massachusetts.
- Code provided: Colorado and Minnesota hand you the code. Colorado bans any marking in it.
- Bring your own: ICC's national exam, Maryland, Montana and New Jersey's trade exam let you bring your own tabbed books, under each exam's tab rules.
If your exam is closed book, the numbers in this test are worth memorizing. If it's open book, retake the test with your code open and time how long each lookup takes.
How many questions are on the master plumber exam, and what score passes?
It depends entirely on the exam. In the table above it runs from 100 items (ICC's national exam, Maryland and New Jersey's trade exam) to 308 (Texas). Several of the listed exams use 70% as the passing threshold, while Georgia reports a scaled passing score of 70. Your bulletin is the only number that counts.
What changes from the journeyman exam to the master exam
Usually you get more questions, more sizing and design, and sometimes business law and a stricter book rule. But not in every state.
| State | Journeyman exam | Master exam |
|---|---|---|
| Colorado | 100 scored items, 240 min | 120 scored items, 270 min. Adds residential fire sprinkler items and doubles isometric analysis from 5 to 10 items. |
| Georgia | 100 items, 5 hours, open book | 120 or 140 items, 7 hours, closed book, including 40 business, administrative and design items |
| Texas | 100 written items plus a hands-on practical | 308 written items, closed book |
| Montana | 100 items plus a practical | 125 items, open book |
That's why this test leans on sizing, design and plan reading rather than the installation recall a journeyman test stresses.
Which code edition should you study?
Study the one your bulletin names. Moving from the 2021 to the 2024 IPC changes some answers and section numbers:
| Topic | 2021 IPC | 2024 IPC |
|---|---|---|
| Showerhead maximum flow | 2.5 gpm at 80 psi | 2.0 gpm at 80 psi |
| Backflow assembly testing | Section 312.10.2 | Section 312.11.2 (a new drainage vacuum test is added at 312.4) |
| Hot water circulation or heat trace | Section 607.2.1 | Section 607.2.2 |
| All-gender multi-user toilet rooms | Not an exception in 403.2 | Added as an exception in 403.2 |
Colorado moves to the 2024 IPC on November 1, 2026. Georgia already tests its 2024 state codes, and Texas and Maryland list 2018 codes. Sources: ICC 2024 significant changes and ICC 2021 IPC code-change proposals.
Which topics carry the most weight
Two published outlines show where the points are. Neither is your state's blueprint unless your bulletin says so.
ICC National Standard Master Plumber (percent of 100 items):
- Plan Reading 23
- Vents 20
- Sanitary Drainage 16
- Water Supply and Distribution 13
- General Regulations 8
- Fixtures 7
- Administration 4
- Water Heaters 4
- Traps, Interceptors and Separators 4
- Storm Drainage 1
Colorado Master (scored items out of 120):
- Sanitary Drainage 22
- Vents 20
- Water Supply 16
- Storm Drainage 12
- Fixtures and Equipment 10
- Isometric Analysis 10
- Water Heaters 8
- General Regulations 6
- Traps, Interceptors and Separators 6
- Indirect and Special Waste 6
- Residential Fire Sprinklers 4
Other exams add whole areas these two don't. Maryland's has 40 gas items out of 100. Georgia's master exams include 15 business law, 15 administrative and 10 system design items.
What this test doesn't cover
- Full isometric drawings. Colorado has 10 isometric items and Massachusetts Part II has 20, and both use real drawings.
- Complete pipe-sizing problems from tables for water distribution, storm leaders and gas piping. This set tests the rules around sizing, not the full table work.
- Your state's own license law and rules, which Montana, Texas, Georgia and New Jersey test in different ways
- Residential fire sprinklers (Colorado)
- Medical gas, and any hands-on practical
Use your bulletin's outline to plan for those.
How to use this practice test
- Take it once cold, without the book. That shows what you actually know.
- Retake it the way your exam runs. If your exam is open book, use your code and note every lookup that felt slow, even when you got it right. Finding the right table fast is a scored skill when the clock is running.
- Review misses and slow answers together. Read the cited section for each one, not just our explanation.
- Move to your bulletin's outline. Spend the next hours on the areas this test showed are weak, plus anything on your outline it doesn't cover.
These exact questions won't appear on your exam. What should carry over is knowing where each rule lives.
Sources
Exam formats:
- ICC National Standard Master Plumber outline
- ICC current national exams list
- PSI candidate bulletins for Colorado, Georgia, Maryland, Massachusetts, and New Jersey
- Pearson VUE TSBPE Candidate Handbook (Texas)
- Minnesota DLI plumbing guide
- Montana Board of Plumbers exam information
- North Carolina exam information
Code text:
- ICC publications: 2021 IPC code-change proposals, 2024 IPC significant changes, the 2021 venting brochure, and Building Safety Journal articles on venting and hot water safety.
- For 2024 code text we checked New York's 2025 Plumbing Code and Fuel Gas Code, which are derived from the 2024 IPC and IFGC. We used only provisions that New York didn't amend.
- Also: the 2012 IPC, Ohio's 2021-based plumbing rule, and a Rehoboth Beach, Delaware gas test form quoting the 2018 IFGC.
Federal rules:
- 29 CFR 1926.651 and 1926.652 (trenching)
- 8 CFR 274a.2 (Form I-9)
- 29 CFR Part 778 (overtime)
- NIST Handbook 44, Appendix C (unit conversions)
Last verified: October 2, 2026. This covers the exam formats in the tables and the code values, federal rules and conversions used in the questions.
Written by the Castleport Test Prep Editorial Team. We wrote these questions and checked each answer against the code text, bulletins and regulations cited with it. They have not been reviewed by a licensed plumber.
Castleport Test Prep is an independent exam prep publisher. We are not affiliated with, endorsed by, or approved by the International Code Council, IAPMO, the Plumbing-Heating-Cooling Contractors Association, any state plumbing board, PSI, Pearson VUE or any other test vendor. Exam, code and credential names identify their subjects, and trademarks belong to their owners. These are original practice questions, not real exam questions. Practice results don't predict your exam score or licensing outcome.