Here are 40 original, unofficial ARE 5.0 Practice Management (PcM) questions, with a worked explanation under every answer. It's free, with no signup.

Practice questions 1–35

Question 1 · Can the firm take on the work?

Business Operations · Objective 1.1 · Multiple choice

A six-person firm is asked to take on 140 client-project hours over the next four weeks. Each employee is paid for 40 hours a week. The firm reserves 20% of paid time for required training, administration, and business development, and signed work already needs 650 project hours in those four weeks. All six are qualified, reserved hours can't be reassigned, and no overtime or new hires are approved.

What is the best response?

Your response, Question 1 (choose one)
Show answer and explanation, Question 1

Correct answer: C.

Paid time is 6 × 40 × 4 = 960 hours. Keeping the 20% reserve leaves 960 × 0.80 = 768 project hours. Existing work uses 650, leaving 118. The new work needs 140, so the firm is 22 hours short.

  • A forgets the reserved time (960 − 650 = 310).
  • B is wrong because 650 is less than 768.
  • D relabels hours without creating any capacity.

AIA's project-fit checklist asks whether the firm has the staff to finish in the client's time frame before it commits.

Source: AIA Best Practices, “Reality check: Assess whether a project is for you”, p. 3, Section E, “Location and available staff”.

Question 2 · Filling an expertise gap

Business Operations · Objective 1.3 · Multiple choice

A firm led by an AIA-member architect is invited to design a performing-arts hall. No one on staff is qualified to provide its acoustical design, which must begin immediately. Under the AIA Code of Ethics, what is the most appropriate way to cover the acoustics work?

Your response, Question 2 (choose one)
Show answer and explanation, Question 2

Correct answer: B.

Rule 3.102 lets members take on services when they, together with the consultants they engage, are qualified. A qualified consultant closes the gap.

  • A risks practicing outside competence on a technical specialty.
  • C silently drops a service the building needs.
  • D isn't required when qualified help is available.

Source: AIA Code of Ethics and Professional Conduct, 2024 edition, p. 3, Rule 3.102.

Question 3 · Working in another state

Business Operations · Objective 1.2 · Multiple choice

A firm whose architects are licensed only in their home state wins a project in a neighboring state. Assume this work requires an architectural license in the project’s state and will be performed by the firm’s own architects. Before the firm provides those services, what is needed?

Your response, Question 3 (choose one)
Show answer and explanation, Question 3

Correct answer: A.

NCARB's Guidelines say you must earn a license from the jurisdiction where you intend to practice, and that an NCARB Certificate helps architects apply for reciprocal licensure. Licenses aren't national (B), a contractor’s license alone does not authorize an architectural seal (C), and reciprocity doesn't mean retaking the ARE (D). Firm-registration rules vary, so check the state board.

Source: NCARB, ARE 5.0 Guidelines (effective Oct 1, 2026), pp. 5–6; NCARB, “Apply for a Reciprocal License”, “How to Apply for a Reciprocal License”; NCARB, Licensing Requirements Tool, jurisdiction selection.

Question 4 · Who is exempt from overtime?

Business Operations · Objective 1.2 · Multiple choice

A firm treats every employee titled “Designer II” as exempt from overtime. Under the FLSA learned-professional exemption, what determines whether a Designer II qualifies?

Your response, Question 4 (choose one)
Show answer and explanation, Question 4

Correct answer: D.

The Department of Labor’s regulations state that job titles don’t determine exemption. The learned-professional exemption requires qualifying compensation on a salary or fee basis and a primary duty involving advanced knowledge in a field of science or learning, customarily acquired through specialized intellectual instruction. The duties must involve the consistent exercise of discretion and judgment. A degree alone (C) isn’t enough, and a written waiver (B) does not substitute for the exemption requirements.

Source: 29 CFR §541.2 — Job titles insufficient, §541.2; 29 CFR §541.300 — Professional employees, §541.300(a)(1); 29 CFR §541.301 — Learned professionals, §541.301(a)–(d).

Question 5 · Accommodation request

Business Operations · Objective 1.2 · Multiple choice

A private firm has employed 18 people for each working day in at least 20 calendar weeks of the current year. An employee with a disability who can perform the job’s essential functions with a reasonable accommodation requests a modified schedule. Which federal obligation applies?

Your response, Question 5 (choose one)
Show answer and explanation, Question 5

Correct answer: A.

ADA Title I covers qualifying employers with 15 or more employees for each working day in at least 20 calendar weeks in the current or preceding calendar year and requires reasonable accommodation for qualified individuals unless it causes undue hardship. A modified schedule can be an accommodation; the obligation is to provide an effective reasonable accommodation, not automatically every schedule an employee requests. Title III (B) covers public accommodations, not employment. C gives the wrong threshold. State laws can apply to smaller firms, so a firm under 15 should still check its state.

Source: Americans with Disabilities Act, as amended (ADA.gov), 42 U.S.C. §§12111(5)(A), (8), (9)(B), and 12112(b)(5)(A).

Question 6 · Owner overrides a life-safety requirement

Business Operations · Objective 1.3 · Multiple choice

During construction documents, the owner tells an AIA-member architect to delete a code-required exit to gain leasable area. The architect advised against it, but the owner insists. The architect believes the change would materially harm public safety in the finished building. What does the AIA Code of Ethics require?

Your response, Question 6 (choose one)
Show answer and explanation, Question 6

Correct answer: C.

Rule 2.105: when a member learns of a client or employer decision that violates law and will materially and adversely affect public safety in the finished project, the member must advise against it, refuse to consent, and report it to the local building inspector or other enforcing official, unless the member can resolve it satisfactorily another way. A and D leave the violation in place; B skips the reporting duty.

Source: AIA Code of Ethics and Professional Conduct, 2024 edition, p. 2, Rule 2.105.

Question 7 · A financial interest in a product

Business Operations · Objective 1.3 · Multiple choice

An AIA-member architect owns 20% of a company that distributes a flooring product suitable for a client's project. What should the architect do before recommending it?

Your response, Question 7 (choose one)
Show answer and explanation, Question 7

Correct answer: D.

Rule 3.201 bars services where the member's judgment could be affected by the member's own interests, unless everyone relying on that judgment consents after full disclosure. Suitability (A) or price (C) doesn't cure the conflict, and the nominal transfer in B keeps the financial benefit while hiding it.

Source: AIA Code of Ethics and Professional Conduct, 2024 edition, p. 3, Rule 3.201.

Question 8 · Leaving the firm

Business Operations · Objective 1.3 · Check all that apply

An AIA-member project architect is leaving for another firm. Under the AIA Code of Ethics, which items need the current employer's permission to take? Select FOUR answers.

Your response, Question 8 (Select FOUR answers.)
Show answer and explanation, Question 8

Correct answers: A, B, C, F.

Rule 5.302: members leaving a firm shall not, without permission, take designs, drawings, data, reports, notes, or other materials relating to the firm's work, whether or not the member did that work. Renderings (B), master specs (C), and fee data (F) are firm work product. The personally owned code copy (D) and personal CE certificates (E) aren't firm work product in this scenario.

Source: AIA Code of Ethics and Professional Conduct, 2024 edition, p. 4, Rule 5.302.

Question 9 · “Highest standard” contract language

Business Operations · Objective 1.4 · Multiple choice

A new client's draft agreement says the architect “shall perform all services to the highest standard of the architectural profession.” What is the best response?

Your response, Question 9 (choose one)
Show answer and explanation, Question 9

Correct answer: B.

B101–2017 §2.2 sets the duty at the skill and care ordinarily provided by architects in the same or similar locality under the same or similar circumstances. The law doesn't require perfection, and AIA recommends discussing expectations early in negotiations. “Highest standard” promises more than that ordinary-practice benchmark.

  • A misstates B101.
  • C prices the risk instead of fixing it.
  • D doesn't remove the duty; a professional is still measured against ordinary practice.

Source: AIA, “Standard of care: Confronting errors & omissions up front” (Nov 2023), “Mutual project expectation”; AIA B101–2017, in the official 2007/2017 comparison, p. 3, §2.2.

Question 10 · An owner-drafted indemnity clause

Finances, Risk, & Development of Practice · Objective 2.2 · Multiple choice

A private owner's draft contract requires the architect to “defend, indemnify, and hold harmless the Owner from all claims arising out of the Project,” with no link to the architect's negligence. What should the firm do before signing?

Your response, Question 10 (choose one)
Show answer and explanation, Question 10

Correct answer: A.

AIA warns that owner-drafted indemnity clauses often reach beyond what the law would otherwise require, may be uninsurable, and can require paying the owner's defense costs even when the architect isn't at fault. Professional liability coverage is subject to its terms; contractual liability beyond covered professional negligence may not be insured (B is wrong). A bigger fee (C) doesn't cap the exposure, and a silent edit (D) isn't a negotiated agreement.

Source: AIA, “Why architects should be wary of indemnification clauses” (Feb 2018), “Indemnification clause risks,” paragraphs beginning “First” and “Second”.

Question 11 · Setting a billing rate

Finances, Risk, & Development of Practice · Objective 2.3 · Multiple choice

Firm policy requires a 20% operating margin on net revenue. A designer's direct salary cost is $40/hour, and the firm's overhead rate is 1.70. Ignoring other direct expenses, what hourly billing rate meets the policy?

Your response, Question 11 (choose one)
Show answer and explanation, Question 11

Correct answer: D.

Break-even multiplier = 1 + overhead rate = 2.70, so the cost to cover is $40 × 2.70 = $108/hour. A 20% margin means profit is 20% of the billing rate, so cost must be 80% of it: $108 ÷ 0.80 = $135. Check: ($135 − $108) ÷ $135 = 20%.

  • A applies only the overhead rate ($40 × 1.70).
  • B is break-even with no profit.
  • C marks cost up by 20% ($108 × 1.20), which yields a margin of only about 16.7% ($21.60 ÷ $129.60).

Source: AIA, “Accounting basics: The income statement & KPIs” (Dec 2023), overhead rate and break-even rate.

Question 12 · Working capital vs. cash

Finances, Risk, & Development of Practice · Objective 2.1 · Multiple choice

At year-end a firm reports current assets of $240,000 (including $170,000 in accounts receivable and $20,000 in cash) and current liabilities of $150,000. Which statement is most accurate?

Your response, Question 12 (choose one)
Show answer and explanation, Question 12

Correct answer: B.

Working capital = current assets − current liabilities = $240,000 − $150,000 = $90,000. AIA points out that receivables aren't cash, and only cash pays salaries, so a healthy working-capital figure can hide a cash shortage. A treats working capital as cash, C adds instead of subtracting, and D confuses working capital with cash.

Source: AIA, “Accounting basics: The balance sheet & KPI” (Dec 2023), working capital.

Question 13 · Who is under the utilization target?

Finances, Risk, & Development of Practice · Objective 2.1 · Multiple choice

Quarterly hours for a small studio are below. The firm's utilization target for production staff is 75%. Principals and administrative staff are excluded from that target.

Question 13 · Who is under the utilization target?
RowRoleHours charged to projectsTotal paid hours
1Principal210520
2Project architect410520
3Designer A440520
4Designer B350520
5Office manager30520

Which row identifies the production staff member furthest below the target?

Your response, Question 13 (choose one)
Show answer and explanation, Question 13

Correct answer: C.

Utilization here is charged hours ÷ paid hours. Production staff: project architect 410 ÷ 520 = 78.8%, Designer A 440 ÷ 520 = 84.6%, Designer B 350 ÷ 520 = 67.3%. Only Designer B is under 75%. The principal (40.4%) and office manager (5.8%) are lower, but the stem excludes them; picking the lowest number without checking who the target covers is the trap.

Source: AIA Best Practices, “Budgeting key performance indicators”, pp. 2–3, utilization and role-dependent non-project work; this item explicitly uses hours.

Question 14 · Is the firm making money?

Finances, Risk, & Development of Practice · Objective 2.1 · Multiple choice

A firm has net revenue of $2,400,000, direct labor of $800,000, and an overhead rate of 1.75. Which statement is correct?

Your response, Question 14 (choose one)
Show answer and explanation, Question 14

Correct answer: A.

Net multiplier = $2,400,000 ÷ $800,000 = 3.00. Break-even rate = 1 + 1.75 = 2.75. Overhead = 1.75 × $800,000 = $1,400,000, so operating profit = $2,400,000 − $800,000 − $1,400,000 = $200,000. Overhead larger than direct labor (C) does not by itself mean a loss; a loss occurs when the net multiplier falls below break-even.

Source: AIA, “Accounting basics: The income statement & KPIs” (Dec 2023), net multiplier, overhead rate, break-even rate.

Question 15 · Claims after retirement

Finances, Risk, & Development of Practice · Objective 2.2 · Multiple choice

An architect retires and closes her firm. Her claims-made-and-reported professional liability policy expires, with no applicable extended reporting period or replacement coverage. Two years later, a client first makes a professional-negligence claim about work performed during the policy period; neither that claim nor related circumstances had been reported earlier. What is the coverage position under the expired policy?

Your response, Question 15 (choose one)
Show answer and explanation, Question 15

Correct answer: D.

Under the specified claims-made-and-reported policy, the date the work was performed is not enough: the claim also has to meet the policy’s claims and reporting conditions. Here it was first made after coverage ended, with no applicable extension or earlier report. An Extended Reporting Period (“tail”) can extend reporting coverage for eligible claims, subject to the policy. A describes occurrence-based reasoning. C does not establish coverage under the expired professional liability policy, and the stem rules out replacement coverage. B invents an automatic period.

Source: Victor, “Facing the Future: Smooth Transitions for Small Design Firms” (March 19, 2025), p. 6, slides 16–18.

Question 16 · What the standard B101 says

Finances, Risk, & Development of Practice · Objective 2.2 · Check all that apply

Under the unmodified AIA B101–2017, which statements are true? Select FOUR answers.

Your response, Question 16 (Select FOUR answers.)
Show answer and explanation, Question 16

Correct answers: B, C, E, F.

§9.5 (termination for convenience on at least seven days' notice), §9.1 (seven days' notice before suspending for nonpayment), §8.2.1 (mediation first), and §8.1.3 (mutual waiver of consequential damages) are standard terms. A is false: §6.2 says the architect cannot and does not warrant that bids will match the budget. D is false: §4.2.1 requires prior written authorization for its listed services; §4.2.2 addresses specified services needed to avoid construction delay, with prompt notice.

Source: AIA B101–2017, in the official 2007/2017 comparison, pp. 11–12, §§4.2.1–4.2.2; p. 14, §6.2; p. 16, §§8.1.3, 8.2.1; p. 17, §§9.1, 9.5; AIA, Instructions: G801–2017, Notice of Additional Services, “Completing G801”.

Question 17 · A copied house design

Finances, Risk, & Development of Practice · Objective 2.3 · Multiple choice

A builder constructs another house copying an original custom house design the firm created in 2015, using photos and site visits rather than the drawings. The firm never registered the design with the U.S. Copyright Office. Which statement is accurate?

Your response, Question 17 (choose one)
Show answer and explanation, Question 17

Correct answer: C.

The Copyright Office defines an architectural work as the design of a building embodied in any tangible medium, including the building itself, for works created on or after December 1, 1990. Under 17 U.S.C. §408(a), registration isn't a condition of protection, though it matters for enforcement steps. A, B, and D contradict those sources. Whether this builder infringed would turn on the facts, so a firm in this spot should talk to an attorney.

Source: U.S. Copyright Office, Circular 41 (rev. Mar 2021), pp. 1–2; U.S. Copyright Office, Copyright Act §408(a), §408(a).

Question 18 · Courting a public client

Business Operations · Objective 1.3 · Multiple choice

To improve its chances on a city library commission, a firm’s AIA-member principal considers sending a city council member season tickets during the selection period. Under the AIA Code of Ethics, this is:

Your response, Question 18 (choose one)
Show answer and explanation, Question 18

Correct answer: A.

Rule 2.102 bars offering or making any payment or gift to a public official with the intent of influencing the official's judgment on a prospective or existing project in which the member is interested. The Code sets no dollar safe harbor (B), and disclosure (C) doesn't cure the intent. Ordinary marketing (D) does not excuse the influence-seeking gift described here.

Source: AIA Code of Ethics and Professional Conduct, 2024 edition, p. 2, Rule 2.102.

Question 19 · Marketing work from a previous firm

Business Operations · Objective 1.3 · Multiple choice

A newly founded firm wants to feature a hospital its AIA-member founder worked on as project architect at her previous employer. Assume she has permission to reproduce all material shown. Under the AIA Code of Ethics, what is the right way to present it?

Your response, Question 19 (choose one)
Show answer and explanation, Question 19

Correct answer: D.

Rule 4.201 bars misleading, deceptive, or false claims about professional qualifications, experience, or performance, and requires members to accurately state the scope and nature of their responsibilities on work they claim credit for. A, C, and B overstate or blur her role.

Source: AIA Code of Ethics and Professional Conduct, 2024 edition, p. 3, Rule 4.201.

Question 20 · Mid-project change request

Finances, Risk, & Development of Practice · Objective 2.3 · Multiple choice

After the owner approves design development, the owner asks the architect to add a second wing. What should the architect do first under B101–2017?

Your response, Question 20 (choose one)
Show answer and explanation, Question 20

Correct answer: B.

B101 §4.2.1.1 covers services caused by changes to the owner’s previous approvals or a material change in project size. The architect must obtain the owner’s written authorization before proceeding with those services; Article 4 also addresses compensation and schedule adjustments. A skips authorization, C gives away fee, and D is unnecessary.

Source: AIA B101–2017, in the official 2007/2017 comparison, p. 11, §§4.2–4.2.1.1; AIA, Instructions: G801–2017, Notice of Additional Services, “Completing G801”.

Question 21 · A fixed fee for an undefined scope

Practice-Wide Delivery of Services · Objective 3.1 · Multiple choice

A prospective client asks for a fixed fee for “all design services.” The request doesn't say who provides the site survey, which engineering consultants are needed, what the deliverables are, or when the work must be finished. What is the best response?

Your response, Question 21 (choose one)
Show answer and explanation, Question 21

Correct answer: C.

A fixed fee is only as reliable as the scope behind it. B101 is built around agreed initial information and allocated services, and AIA's project-fit checklist asks whether the firm can produce the work on the client's schedule before committing. A prices unknowns, B surprises the client after acceptance, and D starts work with no agreement on scope or fee.

Source: AIA Contract Documents, “Summary: B101–2017”, Article 1 and Supplemental/Additional Services; AIA Best Practices, “Reality check: Assess whether a project is for you”, pp. 2–3, project viability and available staff.

Question 22 · One point of responsibility

Practice-Wide Delivery of Services · Objective 3.2 · Multiple choice

A healthcare owner wants one entity contractually responsible for both design and construction. A contractor invites an architect to join its proposal team. If the owner chooses this approach, who will the architect most likely contract with?

Your response, Question 22 (choose one)
Show answer and explanation, Question 22

Correct answer: D.

In design-build, one entity is responsible for both design and construction under a single contract with the owner. When the architect and design-builder are separate companies, the architect typically contracts with the design-builder (AIA's B143), not the owner. A describes design-bid-build or CM delivery; C is the CM-as-adviser model.

Source: AIA Contract Documents, “AIA Contract Documents by delivery method”, Design-Build.

Question 23 · Choosing a delivery method

Practice-Wide Delivery of Services · Objective 3.2 · Multiple choice

A school district wants a traditional process: complete construction documents first, then a builder chosen by competitive price under its own contract with the district. It does not want to hire a construction manager. Which delivery method fits?

Your response, Question 23 (choose one)
Show answer and explanation, Question 23

Correct answer: A.

In design-bid-build, the owner contracts separately with the architect for design and with the contractor for construction, and the contractor is brought on after the design is done. B places design and construction responsibility with one entity. C specifically introduces a construction manager during schematic design, and D adds the construction manager the district doesn't want.

Source: AIA Contract Documents, “AIA Contract Documents by delivery method”, Design-Bid-Build.

Question 24 · Estimate over budget in design

Finances, Risk, & Development of Practice · Objective 2.3 · Multiple choice

During design development, the architect's updated estimate exceeds the owner's budget for the cost of the work. Under B101–2017, what should the architect do?

Your response, Question 24 (choose one)
Show answer and explanation, Question 24

Correct answer: B.

B101 §6.5: when the estimate exceeds the budget, the architect makes recommendations to adjust the project's size, quality, or budget, and the owner cooperates. Staying silent (C) lets a known risk grow. A guarantee (D) contradicts §6.2, where the architect does not warrant bids.

Source: AIA B101–2017, in the official 2007/2017 comparison, p. 14, §§6.2, 6.5.

Question 25 · Bids come in over budget

Finances, Risk, & Development of Practice · Objective 2.2 · Check all that apply

Under unmodified B101–2017 §6.6, the lowest bona fide bid exceeds the owner’s Cost of the Work budget established at the end of the Construction Documents Phase. Which owner responses does the provision allow? Select FOUR answers.

Your response, Question 25 (Select FOUR answers.)
Show answer and explanation, Question 25

Correct answers: A, C, E, F.

B101 §6.6 lists approving a budget increase, rebidding or renegotiating, terminating under §9.5, and revising scope in consultation with the architect (plus other mutually acceptable alternatives). The budget overrun alone does not require the architect to fund the difference (B) or authorize withholding earned fees (D).

Source: AIA B101–2017, in the official 2007/2017 comparison, p. 14, §6.6.

Question 26 · Services agreed at signing

Practice-Wide Delivery of Services · Objective 3.2 · Multiple choice

When signing B101–2017, the owner and architect agree to assign LEED certification documentation and furniture selection to the architect as services beyond Basic Services. In B101–2017 terms, these are:

Your response, Question 26 (choose one)
Show answer and explanation, Question 26

Correct answer: A.

AIA's B101 summary explains that Supplemental Services are non-basic services the architect agrees to at signing. Additional Services now refer only to services that come up as the project proceeds (C). Basic Services are performed in five standard phases; the agreed services here extend beyond those described in Article 3 (B).

Source: AIA Contract Documents, “Summary: B101–2017”, Supplemental and Additional Services; AIA B101–2017, in the official 2007/2017 comparison, pp. 9–11, §§4.1.1, 4.1.1.28, 4.1.3.

Question 27 · Promising a certification

Business Operations · Objective 1.3 · Multiple choice

A developer asks an AIA-member architect to promise in the proposal that the building “will achieve LEED Platinum.” Under the AIA Code of Ethics, what is the appropriate response?

Your response, Question 27 (choose one)
Show answer and explanation, Question 27

Correct answer: D.

Rule 3.301 bars members from intentionally or recklessly misleading clients about the results their services can achieve. Certification depends on many parties, including the contractor and the certifying body, so a guarantee overpromises (A, C). Declining (B) isn't required.

Source: AIA Code of Ethics and Professional Conduct, 2024 edition, p. 3, Rule 3.301; AIA, Instructions: E204–2017, Sustainable Projects Exhibit, §§2.4.1, 2.7, 6.1.

Question 28 · Adding an investor to an S corporation

Practice Methodologies · Objective 4.1 · Multiple choice

A two-owner firm taxed as an S corporation wants a construction company, organized as a corporation, to buy 15% of its stock. Under federal S corporation eligibility rules, what is the main tax-structure problem?

Your response, Question 28 (choose one)
Show answer and explanation, Question 28

Correct answer: B.

The IRS allows S corporation shareholders to be individuals, certain trusts, and estates, not partnerships or corporations. The limit is 100 shareholders, not two (A). Check architecture-firm ownership requirements with the applicable licensing board separately.

Source: IRS, “S corporations”, “To qualify for S corporation status”; NCARB, Licensing Requirements Tool, jurisdiction selection for the separate licensing-board check.

Question 29 · Sole proprietor vs. LLC

Practice Methodologies · Objective 4.1 · Multiple choice

A sole proprietor architect is sued over an unpaid office lease. Compare that with a jurisdiction-permitted architectural LLC that was the tenant from the start, with no personal guarantee by the owner and no exception to limited liability. What is the key difference?

Your response, Question 29 (choose one)
Show answer and explanation, Question 29

Correct answer: C.

The SBA explains that a sole proprietorship isn't a separate entity, so the owner can be personally liable for business obligations, while an LLC protects owners from personal liability in most instances. Entity protection has limits; this question concerns the stated lease-debt scenario.

Source: SBA, “Launch your business,” Choose a business structure, “Sole proprietorship” and “Limited liability company (LLC)”.

Question 30 · Taxed twice

Practice Methodologies · Objective 4.1 · Multiple choice

For federal income-tax purposes, assume individual owners and ordinary operating profits. Which structure can see the same profits taxed twice, once at the entity level and again when paid to owners as dividends?

Your response, Question 30 (choose one)
Show answer and explanation, Question 30

Correct answer: C.

The SBA notes that C corporations pay income tax on profits, and those profits can be taxed again when paid to shareholders as dividends. A sole proprietor (A) reports business income directly, and an S corporation (D) generally passes income through to shareholders. An LLC under the default federal rules (B) is a disregarded entity or partnership, rather than a corporation by election.

Source: SBA, “Launch your business,” Choose a business structure, “Corporation — C corp”; IRS, “S corporations”, opening explanation of pass-through income; IRS Publication 3402, Taxation of Limited Liability Companies (March 2020), “Default classification”.

Question 31 · Planning ownership succession

Practice Methodologies · Objective 4.1 · Multiple choice

Two founding owners plan to retire in about three years. They hold every key client relationship and make all major decisions. Two capable project leaders want to become owners but have no management experience. What is the best approach?

Your response, Question 31 (choose one)
Show answer and explanation, Question 31

Correct answer: A.

AIA's guidance separates ownership (an equity stake) from leadership, says every owner needs strong leadership skills, notes that transitions can run over several years, and urges firms to identify, train, and mentor future leaders. Buying shares (B) doesn't transfer relationships or management ability. C separates ownership from control in a way that won't survive the founders leaving, and D leaves no time to prepare.

Source: AIA, “Pathways to firm ownership & leadership” (Dec 2023), “Ownership, leadership, & governance” and leadership-transition discussion.

Question 32 · A project with a sustainability target

Practice Methodologies · Objective 4.2 · Multiple choice

An owner wants a project to pursue a defined sustainability certification. Which AIA document is intended to set up the Sustainability Plan process alongside B101–2017?

Your response, Question 32 (choose one)
Show answer and explanation, Question 32

Correct answer: B.

AIA's B101 summary says that if the owner identifies a Sustainable Objective, the parties should use E204–2017, Sustainable Projects Exhibit, to establish the Sustainability Plan process. A201 is the construction general conditions, C401 is the architect–consultant agreement, and G702 is a payment application.

Source: AIA Contract Documents, “Summary: B101–2017”, “Related documents”; AIA B101–2017, in the official 2007/2017 comparison, p. 2, §1.1.6.1.

Question 33 · Sharing digital files

Practice Methodologies · Objective 4.2 · Multiple choice

Before the architect sends BIM models and CAD files to the owner's contractor, what does B101–2017 contemplate?

Your response, Question 33 (choose one)
Show answer and explanation, Question 33

Correct answer: D.

AIA's summary notes that before transmitting Instruments of Service or other information in digital form, the parties should set transmission protocols. C conflicts with B101's Article 7 copyright and license terms, and B isn't a B101 default.

Source: AIA B101–2017, in the official 2007/2017 comparison, p. 3, §1.3; pp. 15–16, Article 7; AIA Contract Documents, “Summary: B101–2017”, Article 1, digital protocols.

Question 34 · A federal commission

Practice-Wide Delivery of Services · Objective 3.1 · Multiple choice

A federal agency is selecting an architect for a courthouse under the Brooks Act. Which process applies?

Your response, Question 34 (choose one)
Show answer and explanation, Question 34

Correct answer: A.

FAR 36.602-3 and 36.602-4 require a preference ranking of the most highly qualified firms, with the evaluation board recommending at least three. FAR 36.606 requires negotiating a fair and reasonable fee with the top firm and, if that fails, formally ending talks and moving to the next. Price isn’t the basis for the qualifications ranking (B, C).

Source: Federal Acquisition Regulation, Subpart 36.6 — Architect-Engineer Services, 36.601-1; 36.602-3(c)–(d), 36.602-4(b), 36.606(a), (f).

Question 35 · Fixing repeat coordination errors

Practice Methodologies · Objective 4.2 · Check all that apply

On three recent projects, conflicts between the architectural and MEP drawings weren't caught until construction. Which process changes address that pattern? Select THREE answers.

Your response, Question 35 (Select THREE answers.)
Show answer and explanation, Question 35

Correct answers: B, D, F.

AIA's risk guidance says an in-house quality-control program can reduce professional liability exposure, ties many problems to poor communication between the prime design firm and its consultants, and warns that compressed schedules leave too little time for review, coordination, and checking. B, D, and F add independent review, planned coordination, and follow-through. A makes the cause worse, C removes the coordination that failed, and E drops review entirely while waiting on a tool.

Source: AIA Best Practices, “Risky business: Managing the top five hazards”, pp. 1–2, “Five problem areas,” “Failure to communicate between the prime professional and consultants,” and “Lack of quality control on design changes”.

Case study: Larkspur Studio (Questions 36–40)

Larkspur Studio is a fictional 14-person firm. It is reviewing last year's finances and a proposed agreement from a new client. Use Resources 1 and 2 to answer Questions 36–40.

Resource 1 — Larkspur Studio, last fiscal year (fictional)

Resource 1 — Larkspur Studio, last fiscal year (fictional)
LineAmount
Total revenue (all billings)$3,400,000
Consultant fees billed through$520,000
Reimbursable expenses billed through$80,000
Total salaries, all staff$1,500,000
Salaries charged to projects (direct labor)$900,000
Total overhead (includes $600,000 indirect salaries plus rent, insurance, software, and marketing)$1,530,000

Net revenue = total revenue minus consultant fees and reimbursable expenses. Overhead excludes direct labor.

The consultant and reimbursable amounts are direct nonlabor costs passed through at cost; there are no other direct nonlabor expenses.

Resource 2 — Proposed terms from Kestrel Senior Living (fictional private owner)

Delivery method: construction manager as constructor, with a guaranteed maximum price (GMP).

  • T1. Owner may terminate for convenience on seven days' written notice. Services properly performed before termination remain payable.
  • T2. Architect warrants that the construction manager's GMP will not exceed $14.2 million.
  • T3. Disputes go to mediation before litigation.
  • T4. The construction manager joins during design development to provide preconstruction services.

Question 36 · Larkspur's utilization

Finances, Risk, & Development of Practice · Objective 2.1 · Multiple choice

Using Resource 1, what was Larkspur's labor-cost utilization rate?

Your response, Question 36 (choose one)
Show answer and explanation, Question 36

Correct answer: C.

Labor-cost utilization = direct labor cost ÷ total labor cost = $900,000 ÷ $1,500,000 = 60%. B is the indirect share ($600,000 ÷ $1,500,000). A divides direct labor by total revenue, and D flips the ratio.

Source: AIA, “Accounting basics: The income statement & KPIs” (Dec 2023), utilization rate.

Question 37 · Net multiplier vs. break-even

Finances, Risk, & Development of Practice · Objective 2.1 · Multiple choice

Using Resource 1, which statement correctly compares Larkspur's net multiplier with its break-even rate?

Your response, Question 37 (choose one)
Show answer and explanation, Question 37

Correct answer: B.

Net revenue = $3,400,000 − $520,000 − $80,000 = $2,800,000. Net multiplier = $2,800,000 ÷ $900,000 ≈ 3.11. Overhead rate = $1,530,000 ÷ $900,000 = 1.70, so break-even = 1 + 1.70 = 2.70. A uses total revenue ($3,400,000 ÷ $900,000 ≈ 3.78), and D forgets to add 1 to the overhead rate.

Source: AIA, “Accounting basics: The income statement & KPIs” (Dec 2023), net multiplier, overhead rate, break-even rate.

Question 38 · Operating margin

Finances, Risk, & Development of Practice · Objective 2.1 · Multiple choice

Using Resource 1, what was Larkspur's operating profit as a percentage of net revenue?

Your response, Question 38 (choose one)
Show answer and explanation, Question 38

Correct answer: D.

Operating profit = net revenue − direct labor − overhead = $2,800,000 − $900,000 − $1,530,000 = $370,000. $370,000 ÷ $2,800,000 ≈ 13.2%. A divides by total revenue ($3,400,000), C divides by direct labor ($900,000), and B subtracts overhead but forgets direct labor ($1,270,000 ÷ $2,800,000).

Source: AIA, “Accounting basics: The income statement & KPIs” (Dec 2023), operating profit.

Question 39 · The riskiest proposed term

Practice-Wide Delivery of Services · Objective 3.3 · Multiple choice

Using Resource 2, which proposed term should Larkspur push back on most strongly?

Your response, Question 39 (choose one)
Show answer and explanation, Question 39

Correct answer: B.

The proposed warranty would make Larkspur responsible for a construction price that the CM proposes and negotiates with the owner. In the standard A133–2019 arrangement, the CM becomes bound to complete construction at or below the accepted GMP; B133–2019 assigns cost estimating to the CM and contract administration to the architect. Larkspur should negotiate removal or revision of this warranty. T1 and T3 address termination and dispute procedures, and T4 describes preconstruction involvement; none imposes the same price warranty.

Source: AIA, Summary: A133–2019, Owner–Construction Manager as Constructor Agreement, Synopsis, GMP proposal/acceptance and construction obligations; AIA, Summary: B133–2019, Owner–Architect Agreement, CM as Constructor Edition, Synopsis and Purpose.

Question 40 · Who is responsible for construction?

Practice-Wide Delivery of Services · Objective 3.2 · Multiple choice

Under the CM-as-constructor arrangement in Resource 2, which party contracts with Kestrel to perform construction and commits to the GMP?

Your response, Question 40 (choose one)
Show answer and explanation, Question 40

Correct answer: C.

The construction manager contracts directly with Kestrel to construct the project and, in the arrangement described, commits to the accepted GMP. Kestrel has a separate agreement with Larkspur for architectural services; B133 is the matching standard owner–architect form.

Source: AIA Contract Documents, “AIA Contract Documents by delivery method”, “Construction Manager as Constructor”; AIA, Summary: A133–2019, Owner–Construction Manager as Constructor Agreement, Synopsis; AIA, Summary: B133–2019, Owner–Architect Agreement, CM as Constructor Edition, Synopsis and Purpose.

Answer key and how to score yourself

Every question is worth one point. For check-all-that-apply questions (8, 16, 25, and 35), you earn the point only if you picked exactly the right set of options: no missing answers, no extras. That's how NCARB scores its check-all-that-apply items too (ARE 5.0 Guidelines, pp. 40, 58). Record your first answer before opening its explanation. Count a question you skipped, or revealed before answering, as wrong.

Answer key and how to score yourself
QuestionAnswerSectionObjective
1CBusiness Operations1.1
2BBusiness Operations1.3
3ABusiness Operations1.2
4DBusiness Operations1.2
5ABusiness Operations1.2
6CBusiness Operations1.3
7DBusiness Operations1.3
8A, B, C, FBusiness Operations1.3
9BBusiness Operations1.4
10AFinances, Risk, & Development of Practice2.2
11DFinances, Risk, & Development of Practice2.3
12BFinances, Risk, & Development of Practice2.1
13CFinances, Risk, & Development of Practice2.1
14AFinances, Risk, & Development of Practice2.1
15DFinances, Risk, & Development of Practice2.2
16B, C, E, FFinances, Risk, & Development of Practice2.2
17CFinances, Risk, & Development of Practice2.3
18ABusiness Operations1.3
19DBusiness Operations1.3
20BFinances, Risk, & Development of Practice2.3
21CPractice-Wide Delivery of Services3.1
22DPractice-Wide Delivery of Services3.2
23APractice-Wide Delivery of Services3.2
24BFinances, Risk, & Development of Practice2.3
25A, C, E, FFinances, Risk, & Development of Practice2.2
26APractice-Wide Delivery of Services3.2
27DBusiness Operations1.3
28BPractice Methodologies4.1
29CPractice Methodologies4.1
30CPractice Methodologies4.1
31APractice Methodologies4.1
32BPractice Methodologies4.2
33DPractice Methodologies4.2
34APractice-Wide Delivery of Services3.1
35B, D, FPractice Methodologies4.2
36CFinances, Risk, & Development of Practice2.1
37BFinances, Risk, & Development of Practice2.1
38DFinances, Risk, & Development of Practice2.1
39BPractice-Wide Delivery of Services3.3
40CPractice-Wide Delivery of Services3.2

Tally your results by section:

Answer key and how to score yourself
SectionQuestionsYour correct
Business Operations1, 2, 3, 4, 5, 6, 7, 8, 9, 18, 19, 27__ / 12
Finances, Risk, & Development of Practice10, 11, 12, 13, 14, 15, 16, 17, 20, 24, 25, 36, 37, 38__ / 14
Practice-Wide Delivery of Services21, 22, 23, 26, 34, 39, 40__ / 7
Practice Methodologies28, 29, 30, 31, 32, 33, 35__ / 7
Total__ / 40

Your result describes how you did on these 40 questions. It isn't an ARE scaled score and doesn't predict a pass. Seven to fourteen questions per section is a small sample, so treat a weak section as a place to look harder, not a verdict. On the real exam, NCARB scores the whole division together, so doing poorly in one section doesn't fail you by itself if you do well elsewhere (Guidelines, p. 40).

Turn each miss into a review task

Use these four categories to review a miss. Name the type, then do the matching fix.

Turn each miss into a review task
Why you missed itWhat to do next
Wrong rule or authority. You mixed up what an ethics rule, a contract clause, an insurance policy, or a law requires.Open the source linked under the question and restate the rule in your own words, including who it applies to.
Formula or denominator. You used total revenue instead of net revenue, or divided by the wrong labor figure.Redo the math from the original numbers. Label every figure and say out loud what the denominator stands for.
Missed a fact in the question. A detail in the stem or resource changed the answer.Find the sentence or table cell that decides it, and explain why the tempting option breaks that fact.
Stopped comparing too early. You picked a plausible option without testing the others.Write one line on why each wrong option fails. For check-all-that-apply, judge each option on its own.

Copy this log for your misses:

Turn each miss into a review task
QuestionType of missRule, formula, or fact to reviewMy corrected explanation
Blank log row

Come back in a few days and try your missed questions again before reading the explanation. Explain why the answer is right, not just which letter you remember.

What this practice test covers

NCARB splits PcM into four sections. The percentages describe a typical exam form (ARE 5.0 Guidelines, p. 72). The study-topic assignments below are our editorial choices; this set’s distribution does not reproduce an NCARB exam form.

What this practice test covers
NCARB sectionTypical share of the real examQuestions in this setShare of this set
Business Operations20–26%1230%
Finances, Risk, & Development of Practice29–35%1435%
Practice-Wide Delivery of Services22–28%717.5%
Practice Methodologies17–23%717.5%

These questions cover study topics associated with all 12 PcM objectives. They combine foundational rule checks with application and analysis; their objective distribution and cognitive difficulty do not reproduce the live exam blueprint. The budget-response questions also reinforce contract fundamentals shared with Project Management.

What this practice test covers
ObjectiveQuestions
1.1 Assess resources within the practice1
1.2 Apply the regulations and requirements governing the work environment3, 4, 5
1.3 Apply ethical standards to comply with accepted principles within a given situation2, 6, 7, 8, 18, 19, 27
1.4 Apply appropriate Standard of Care within a given situation9
2.1 Evaluate the financial well-being of the practice12, 13, 14, 36, 37, 38
2.2 Identify practice policies and methodologies for risk, legal exposures, and resolutions10, 15, 16, 25
2.3 Select and apply practice strategies for a given business situation and policy11, 17, 20, 24
3.1 Analyze and determine response for client services requests21, 34
3.2 Analyze applicability of contract types and delivery methods22, 23, 26, 40
3.3 Understand potential project risks and how a practice can mitigate those risks39
4.1 Identify and compare practice and business structures relevant to an architectural practice28, 29, 30, 31
4.2 Identify and compare processes, policies, and resources used in the design, coordination, and documentation of different project types32, 33, 35

Objective wording is NCARB's, as of the changes that took effect April 27, 2026. That update narrowed objective 3.3 to project risk (project rewards were dropped) and clarified 4.1 and 4.2 (NCARB, “Updated ARE Guidelines for April 2026 Exam Changes”).

How this set compares with the real PcM exam

How this set compares with the real PcM exam
Row labelThis practice setARE 5.0 Practice Management
Questions40 original questions65 items: 59 scored and 6 unscored pretest items that aren’t identified
TimeUntimed, or an optional pacing target of about 98 minutes2 hr 40 min of testing, plus 30 min of break time (3 hr 20 min appointment)
Question types36 multiple-choice and 4 check-all-that-apply questions; one case studyMultiple choice (3–4 options), check-all-that-apply (6 options; select 2–4), and hotspot; case studies use these response formats
Case studiesOne, with two resources and five questionsUp to six, containing up to 14 items in total; each uses one to two resources
ScoringNumber correct out of 40, for your own reviewPass/fail against a cut score for the whole division; 1 point per scored item, no partial credit, no penalty for wrong answers
CostFree$263 per attempt

The optional pacing target is proportional arithmetic: 40 × 160 ÷ 65 ≈ 98.46 minutes, or about 98 minutes. It does not establish that these questions match the difficulty or timing of the real exam. This set does not include a graphical hotspot.

Sources: ARE 5.0 Guidelines, pp. 8, 37, 40, 57–60, 72; NCARB, “Updates to ARE Now Effective”; NCARB fees.

A few other facts worth knowing before you book:

  • Pass rates. NCARB's PcM pass rate was 51% in 2025 and 48% in 2024, counting first-time and repeat test takers together (NCARB pass rates).
  • Retakes. Wait at least 60 days after a failed attempt. You may take the same division at most three times in any 12-month period, including the initial attempt. A failing score report shows a scaled score and your relative strengths and weaknesses by section (Guidelines, pp. 38–41).
  • Answer everything. Wrong answers cost nothing and blank answers count as wrong (Guidelines, p. 40).
  • Breaks lock your work. After a break, every item you've already viewed is locked, including flagged ones (Guidelines, p. 22). Decide before test day whether you'll finish the case studies before or after your break.

PcM formulas used in this test

These are the definitions behind questions 11–14 and 36–38, using the stated accounting conventions and AIA’s practice resources (AIA, “Accounting basics: The income statement & KPIs”; AIA, “Accounting basics: The balance sheet & KPI”).

PcM formulas used in this test
MeasureFormulaWorked example from this test
Net revenueTotal revenue − direct nonlabor expenses (such as consultant fees and reimbursables)$3,400,000 − $520,000 − $80,000 = $2,800,000 (Q37)
Labor-cost utilizationDirect labor cost ÷ total labor cost$900,000 ÷ $1,500,000 = 60% (Q36)
Individual hour-based utilizationHours charged to projects ÷ total paid hours350 ÷ 520 ≈ 67.3% (Designer B, Q13)
Overhead rateTotal overhead ÷ direct labor$1,530,000 ÷ $900,000 = 1.70 (Q37)
Break-even rate1 + overhead rate1 + 1.70 = 2.70 (Q37)
Net multiplierNet revenue ÷ direct labor$2,800,000 ÷ $900,000 ≈ 3.11 (Q37)
Operating profitNet revenue − direct labor − overhead$2,800,000 − $900,000 − $1,530,000 = $370,000 (Q38)
Working capitalCurrent assets − current liabilities$240,000 − $150,000 = $90,000 (Q12)
Billing rate for target operating marginDirect salary cost × (1 + overhead rate) ÷ (1 − target margin), when no other direct expenses apply$40 × 2.70 ÷ 0.80 = $135/hour (Q11)
Operating marginOperating profit ÷ net revenue$370,000 ÷ $2,800,000 ≈ 13.2% (Q38)

A quick sanity check: a firm makes an operating profit when its net multiplier is above its break-even rate.

Take NCARB's free practice exam next

Once you've worked through this set and reviewed your weak section, NCARB's own practice exam is the best next step. NCARB offers one free, full-length practice exam for each division, built to the current objectives and refreshed case-study format (NCARB practice exams; NCARB, “NCARB Has Launched Updated Practice Exams”).

  • Where to find it. Sign in to your NCARB Record. If you're eligible to test, open the Exams tab, then Additional Resources, then the Practice Exam Dashboard. If you aren't eligible yet, choose “Practice the ARE” under Quick Links.
  • What you get. Results by section, plus the correct answer and rationale for every item.
  • How to read the score. NCARB’s practice exams use a fixed passing mark of about 68%, separate from the form-specific live-exam standard. Do not apply that threshold to this 40-question set or convert its result into a predicted ARE outcome.

If you take ours untimed first, you'll know which section to study before you spend NCARB's full-length exam on a timed run.

Sources and verification

We checked the exam facts on this page against NCARB’s ARE 5.0 Guidelines (effective October 1, 2026) and its fees, pass-rate, practice-exam, and change-announcement pages on October 12, 2026. Each answer explanation links to the source for the rule or formula it relies on. Ethics questions use the 2024 AIA Code of Ethics and Professional Conduct, the edition listed in NCARB’s current reference matrix (Guidelines p. 115). B101 questions link to AIA’s official 2007/2017 comparison and relevant publisher explanations; the CM-as-constructor case uses A133–2019 and B133–2019 sources.

The firms, clients, projects, and numbers in the questions are fictional. Legal and insurance questions teach general principles for exam study; they aren't legal advice for a real contract or claim.

AI tools assisted with drafting and source checking. This is an editorial source check, not a credentialed professional review; see how we create and check study material.

Exam facts last verified: October 12, 2026

By: Castleport Test Prep Editorial Team

Castleport Test Prep is an independent exam prep publisher. We are not affiliated with, endorsed by, or approved by the National Council of Architectural Registration Boards (NCARB). These practice questions are original and unofficial; they are not ARE questions. Exam and credential names are used to identify their subjects, and trademarks belong to their respective owners.