Free NCIDQ IDPX Practice Test
This free NCIDQ IDPX practice test has 40 original, unofficial questions for the Interior Design Professional Exam, with every answer and explanation here and no signup. It is a focused practice set, not a full-length exam or a prediction of your score.
IDPX practice questions
Question 1 · Comparing furniture quotations
IDPX-01 · III. Contracts, Procurement, and Permitting · Multiple choice, 3 options
Two furniture vendors meet every specification and can deliver on time. Vendor A quotes $19,600 plus $1,100 for delivery and $1,500 for installation. Vendor B quotes $21,800 with delivery and installation included. Taxes are identical, and there are no other charges. Which offer costs less?
- A. Vendor A, by $2,200
- B. Vendor B, by $400
- C. They cost the same
Show answer and explanation
Correct answer: B. Vendor B, by $400.
Compare the full cost of the same scope. Vendor A totals $19,600 + $1,100 + $1,500 = $22,200. Vendor B totals $21,800, which is $400 less. Quotation instructions exist so every vendor prices the same defined scope; your job is to compare like with like.
Why the other options are wrong
- A. $2,200 compares Vendor A's base price with Vendor B's all-in price. It leaves out A's delivery and installation.
- C. Once every listed charge is added, the totals differ by $400.
Source: Original scenario; arithmetic shown in the explanation · AIA, A751–2019 FF&E quotation instructions summary — Synopsis; Purpose
Question 2 · An old plan that doesn't match the space
IDPX-02 · I. Feasibility Studies · Multiple choice, 4 options
You're preparing a feasibility study for renovating an office floor. The owner's only floor plan is from 2004. On your walk-through, a corridor wall sits about 4 feet east of where the plan shows it. The study has to say whether a new training room will fit. What should you do before using the plan to test the layout?
- A. Use the 2004 plan as drawn, because owner-supplied documents are presumed accurate
- B. Split the difference between the plan and what you saw
- C. Field-measure the affected area, record the discrepancy, and base the fit test on the verified dimensions
- D. Assume the larger room fits and list the wall location as a risk to check during construction
Show answer and explanation
Correct answer: C. Field-measure the affected area, record the discrepancy, and base the fit test on the verified dimensions.
A feasibility study is only as good as its existing-conditions information. When an old drawing conflicts with what you can see, verify the part that affects the decision before you rely on it. CSU's feasibility guidelines treat existing conditions and the quality of prior data as core inputs. A walk-through won't reveal concealed conditions, so note what you couldn't verify, but measure what you can.
Why the other options are wrong
- A. The plan is already contradicted by the space. Treating it as accurate builds the error into the study.
- B. Averaging two numbers doesn't produce a real dimension.
- D. Feasibility is meant to answer the fit question before design and construction money is spent, not after.
Source: California State University, Feasibility Study Guidelines — §§1.1–1.2, p. 3
Question 3 · When a delay eats the float
IDPX-03 · II. Scheduling and Budgeting · Fill in the blank (number)
Use the schedule below. Each activity starts as soon as all its predecessors finish. Durations are in working days on one calendar, with no lag or resource constraints.
| Activity | Duration | Predecessor |
|---|---|---|
| A — Demolition | 4 | None |
| B — Electrical rough-in | 6 | A |
| C — Custom glazing fabrication | 10 | A |
| D — Ceiling close-up | 2 | B and C |
The planned duration is 16 working days. Electrical rough-in (B) then runs 6 working days late, so it takes 12 days instead of 6. Nothing else changes. What is the new total duration, in working days?
Your answer: ________ working days
Show answer and explanation
Correct answer: 18 working days.
The original critical path is A–C–D: 4 + 10 + 2 = 16 days. B had 4 days of float, because A–B–D took only 4 + 6 + 2 = 12. A 6-day slip uses up those 4 days of float, and the extra 2 days push the finish. The new longest path is A–B–D: 4 + 12 + 2 = 18 days. GAO's scheduling guidance makes the same point: an activity off the driving path can absorb delay up to its float, and anything beyond that moves the finish.
Common mistake: 22 adds the full 6-day slip to the original 16, ignoring B's float. 16 assumes B's float covers the whole delay, but it only covers 4 of the 6 days.
Source: Original scenario; arithmetic shown in the explanation · GAO Schedule Assessment Guide (GAO–16–89G) — pp. 77–79 and 92–96
Question 4 · Shop drawing, product data, or sample?
IDPX-04 · IV. Construction Process · Matching (text-based)
Match each submittal to its type. Use each type once.
- A fabricator's drawing of the reception desk, made for this project, showing dimensions, joinery and wall attachment
- A manufacturer's catalog sheet for a cabinet hinge, with the specified model circled
- A 4-by-4-inch piece of the actual laminate in the specified finish
Choices: Product data · Sample · Shop drawing
Show answer and explanation
Correct matches: 1. Shop drawing; 2. Product data; 3. Sample.
A201–2017 §3.12 defines all three. Shop drawings are prepared specifically for the project to show how part of the work will be built. Product data is standard information from manufacturers or suppliers, marked to show what's being provided. Samples are physical examples that set the standard the finished work is judged against. None of them is a Contract Document; they show how the contractor plans to meet the Contract Documents.
Common mistake: The common mix-up is calling a marked-up catalog page a shop drawing. Here, the catalog sheet is standard manufacturer information with the selected model identified, so it is product data.
Source: AIA A201–2017, standard submittal provisions — §§3.12.1–3.12.4, p. 15 · AIA Contract Documents, What Is a Submittal in Construction? — Common Types; responsibility discussion; Are Submittals Part of the Contract Documents?
Question 5 · What site visits do and don't promise
IDPX-05 · V. Site Observation and Close-Out · Multiple choice, 4 options
This project uses AIA A201–2017 General Conditions, and the architect administers the construction contract. The owner asks whether the architect's site visits mean every drywall defect will be caught. Which statement is accurate?
- A. No. Visits are periodic and not exhaustive, and the contractor controls means, methods and safety
- B. Yes. Under A201 the architect inspects continuously and answers for the quality of the work
- C. Yes, as long as the architect directs the drywall crew's work sequence during each visit
- D. No. Visits only check whether the work is on schedule, not its quality
Show answer and explanation
Correct answer: A. No. Visits are periodic and not exhaustive, and the contractor controls means, methods and safety.
A201–2017 §4.2.2 has the architect visit at appropriate intervals to become generally familiar with progress and quality and to judge whether the work, when finished, will conform. It also says the architect isn't required to make exhaustive or continuous inspections and doesn't control construction means, methods, sequences or safety programs. Those belong to the contractor.
Why the other options are wrong
- B. That describes full-time inspection, which A201 expressly doesn't require.
- C. Directing a crew's sequence is a means-and-methods decision that belongs to the contractor.
- D. Visits cover quality as well as progress.
Source: AIA A201–2017, publisher’s standard-form sample — §4.2.2, p. 18 · AIA, G711–2018 Architect's Field Report instructions — Synopsis; Completing G711–2018
Question 6 · One contract for design and construction
IDPX-06 · III. Contracts, Procurement, and Permitting · Multiple choice, 3 options
An owner wants to sign one contract with a single entity that will both design and build a tenant fit-out. Which project delivery method matches that structure?
- A. Design-bid-build
- B. Construction manager at risk
- C. Design-build
Show answer and explanation
Correct answer: C. Design-build.
Design-build puts design and construction under one agreement with one entity, so one team answers for both. That's the defining feature, not a promise that it's cheaper or faster.
Why the other options are wrong
- A. In design-bid-build, the owner holds separate contracts with the designer and the builder, and the phases run in sequence.
- B. In CM at risk, the owner still holds a separate contract with the architect. The construction manager gives input during design and then holds the trade contracts.
Source: DBIA, What Is Design-Build? — Definition · AIA/AGC, A Primer on Project Delivery Terms — Printed pp. 2–4: design-bid-build, CM at risk, design-build
Question 7 · Who knows how the desk really works?
IDPX-07 · I. Feasibility Studies · Multiple choice, 3 options
A library is redesigning its main service desk. The desk has to handle both checkouts and a new laptop-lending program. The executive sponsor controls the budget but says she doesn't know how either process runs day to day. Whose input fills that gap?
- A. Only the executive sponsor, since she approves the budget
- B. The furniture dealer who will supply the desk
- C. The circulation staff and branch manager who run the desk every day
Show answer and explanation
Correct answer: C. The circulation staff and branch manager who run the desk every day.
Operational requirements come from the people who perform the work. CSU's feasibility guidelines separate sponsors from key stakeholders and call for gathering user needs directly. The sponsor keeps her budget authority; she just isn't the source for workflow detail.
Why the other options are wrong
- A. Budget authority isn't operational knowledge, and she has said so.
- B. A dealer can advise on products, but doesn't know the library's workflows.
Source: California State University, Feasibility Study Guidelines — §§1.1 and 1.4, pp. 3–4
Question 8 · Building the project budget
IDPX-08 · II. Scheduling and Budgeting · Fill in the blank (number)
A project budget has these parts: construction $240,000; furniture $60,000; design fees $30,000; permit allowance $2,000. The owner wants a contingency of 10% of the construction cost only. There are no taxes or other costs. What is the total project budget, in dollars?
Your answer: ________ dollars
Show answer and explanation
Correct answer: $356,000.
Contingency = 10% × $240,000 = $24,000. Total = $240,000 + $60,000 + $30,000 + $2,000 + $24,000 = $356,000. Read the base for a percentage carefully; here it's construction only. These figures are made up for practice and aren't typical rates or real permit fees.
Common mistake: $365,200 applies 10% to everything ($332,000 × 1.10). $332,000 leaves the contingency out.
Source: Original scenario; arithmetic shown in the explanation
Question 9 · Does a review stamp change the specification?
IDPX-09 · IV. Construction Process · Multiple choice, 4 options
This project uses AIA A201–2017 General Conditions, and the architect administers the construction contract. The specification calls for solid-surface countertops. The contractor's casework shop drawings show plastic laminate, but the contractor didn't point out the change. The architect returned the drawings marked "no exceptions taken" without noticing. Laminate is now installed. Which statement is correct?
- A. The stamp approved laminate, so laminate is now the contract requirement
- B. The specification governs, but the owner must pay extra to get solid surface
- C. The specification still governs, because the deviation wasn't flagged and approved through a modification
- D. The architect's review marks replace the specification for this item
Show answer and explanation
Correct answer: C. The specification still governs, because the deviation wasn't flagged and approved through a modification.
Under A201–2017 §3.12.8, approving a submittal doesn't excuse a deviation from the Contract Documents unless the contractor specifically told the architect about it in writing when submitting, and the change was then authorized through a minor change, change order or construction change directive. None of that happened here.
Why the other options are wrong
- A. A review stamp isn't a contract modification.
- B. The requirement didn't change, so the stamp doesn't create an owner-paid extra.
- D. Submittals aren't Contract Documents (§3.12.4), so review marks on them don't rewrite the contract.
Source: AIA A201–2017, standard submittal provisions — §3.12.8, p. 16 · AIA Contract Documents, What Is a Submittal in Construction? — Common Types; responsibility discussion; Are Submittals Part of the Contract Documents?
Question 10 · Which bond does what?
IDPX-10 · III. Contracts, Procurement, and Permitting · Matching (text-based)
Match each promise to the bond that makes it. Use each bond once.
- The low bidder will sign the contract and provide the required bonds
- The contract work will be completed
- Subcontractors and suppliers will be paid
Choices: Bid bond · Payment bond · Performance bond
Show answer and explanation
Correct matches: 1. Bid bond; 2. Performance bond; 3. Payment bond.
The SBA describes all three. A bid bond backs up the bid itself. A performance bond guarantees the work gets done. A payment bond guarantees the people supplying labor and materials get paid. A surety company stands behind each one.
Common mistake: Performance and payment bonds are easy to swap. Performance protects the owner's finished project; payment protects the subs and suppliers.
Source: U.S. Small Business Administration, Surety bonds — Types of surety bonds
Question 11 · Looks installed, but does it work?
IDPX-11 · V. Site Observation and Close-Out · Multiple choice, 4 options
Occupancy-sensor lighting controls are installed and look right on a walk-through. The owner's documented requirements say the lights in every room must turn off after a set delay when the room is empty. What shows that requirement is met?
- A. Dated photos of each installed sensor in every room
- B. The contractor's paid invoice for the specified control system
- C. Documented functional testing against the owner's requirements
- D. The certificate of occupancy issued by the building official
Show answer and explanation
Correct answer: C. Documented functional testing against the owner's requirements.
That's what commissioning does: it verifies and documents that systems perform the way the owner requires. GSA describes it as confirming the building and its systems work as intended, with a process that runs from planning to occupancy. Seeing equipment in place doesn't prove it performs.
Why the other options are wrong
- A. Photos show installation, not performance.
- B. An invoice proves payment, not function.
- D. A certificate of occupancy is the jurisdiction's approval to occupy. It doesn't verify the owner's own performance requirements.
Source: GSA, Building commissioning, retro-commissioning and re-tuning — Building commissioning
Question 12 · Enough hours for the deadline?
IDPX-12 · I. Feasibility Studies · Multiple choice, 4 options
A task due next week needs 44 hours of design work. Two qualified designers each have 18 hours available next week. Their hours are interchangeable, and nothing else limits the work. What does this tell you?
- A. There's enough capacity, since two designers can share the work
- B. There's a 26-hour shortfall that only overtime can close
- C. There's a 36-hour surplus to assign to other tasks
- D. There's an 8-hour shortfall to solve with more qualified hours or a scope or date change
Show answer and explanation
Correct answer: D. There's an 8-hour shortfall to solve with more qualified hours or a scope or date change.
Available: 2 × 18 = 36 hours. Needed: 44. Shortfall: 44 − 36 = 8 hours. Spotting the gap is the first step; the fix is to find qualified hours or adjust scope or date with the people who can approve that. Don't assume overtime exists. CSU's guidelines list team members' available time as part of assessing resources.
Why the other options are wrong
- A. 36 hours is less than 44.
- B. 26 counts only one designer's hours.
- C. 36 is the hours available, not a surplus.
Source: Original scenario; arithmetic shown in the explanation · California State University, Feasibility Study Guidelines — §2.2, p. 5
Question 13 · A real value-engineering proposal
IDPX-13 · II. Scheduling and Budgeting · Multiple choice, 4 options
Corridor flooring must meet three stated requirements: a heavy-commercial durability rating, the specified slip-resistance value, and wet-mop cleanability. Which cost-saving proposal is true value engineering?
- A. Another manufacturer's sheet vinyl: 12% cheaper and meets all three requirements
- B. Carpet tile: 20% cheaper, meets durability and slip resistance, but can't be wet-mopped
- C. Delete flooring in the back corridors and leave sealed concrete that fails the specified slip-resistance value
- D. The same sheet vinyl with a thinner wear layer that falls below the durability rating
Show answer and explanation
Correct answer: A. Another manufacturer's sheet vinyl: 12% cheaper and meets all three requirements.
Value engineering cuts cost while keeping the essential functions. The FAR defines it that way: remove cost without giving up the item's required functions and characteristics. Only the other manufacturer's sheet vinyl keeps every stated requirement.
Why the other options are wrong
- B. Cheaper, but it drops a required function (cleanability).
- C. This proposal fails the required slip-resistance value. Removing scope is not automatically wrong; sacrificing an essential requirement is the problem.
- D. It saves money by failing the durability requirement.
Source: FAR 48.101, Value engineering: general — 48.101(a)
Question 14 · Damaged in transit
IDPX-14 · III. Contracts, Procurement, and Permitting · Multiple choice, 4 options
The owner is the purchaser on a purchase order for lounge seating. For this scenario, apply Maine's Uniform Commercial Code rules in §§2-319 and 2-509. The order says "FOB shipping point," with no contrary risk-of-loss agreement. Conforming, properly packed seating is duly delivered to the carrier, and there is no seller breach. One chair is then crushed inside the carrier's truck. As between buyer and seller, who bore the risk of loss in transit?
- A. The seller, because risk stays with it until delivery to the site
- B. The installer, because it was scheduled to receive the chair
- C. The designer, because it specified the chair and the freight terms
- D. The buyer, because risk passed when the conforming chair was duly delivered to the carrier
Show answer and explanation
Correct answer: D. The buyer, because risk passed when the conforming chair was duly delivered to the carrier.
Under Maine's §§2-319 and 2-509, this shipment contract places transit risk on the buyer once conforming goods are duly delivered to the carrier. A destination contract instead keeps risk with the seller until the required tender at the destination. Contrary agreements and seller-breach rules can change the result; neither applies in this scenario. This answers the allocation between buyer and seller, not the carrier's liability or an insurance claim. Read the freight terms before the order is placed; that's when they matter.
Why the other options are wrong
- A. That describes FOB destination.
- B. Scheduling the installer to receive the goods does not assign it the buyer's transit risk in this order.
- C. Specifying a product doesn't make the designer the buyer or the carrier.
Source: Maine UCC §2-319, F.O.B. and F.A.S. terms — §2-319(1)(a)–(b) · Maine UCC §2-509, Risk of loss — §2-509(1), (4) · Maine UCC §2-510, Effect of breach on risk of loss — §2-510(1)
Question 15 · A request for a price
IDPX-15 · IV. Construction Process · Multiple choice, 4 options
The contractor receives an AIA G709 proposal request with a sketch of added shelving. Nothing else has been issued about the shelving. What should the contractor do?
- A. Build the shelving now and bill for it on the next pay application
- B. Price the change and wait for authorization before doing the work
- C. Treat the request as a construction change directive and start work
- D. Ignore it, because a proposal request is for information only
Show answer and explanation
Correct answer: B. Price the change and wait for authorization before doing the work.
AIA describes the G709 proposal request as a request for pricing on a possible change. It doesn't authorize the work. Authorization would come later, typically through a change order, or a construction change directive when the owner and architect direct a change before full agreement on the adjustment.
Why the other options are wrong
- A. Nothing has authorized the work yet.
- C. A construction change directive is a separate, signed direction to proceed. A pricing request isn't one.
- D. It asks for a response: the contractor's pricing.
Source: AIA, G709–2018 Proposal Request instructions — Synopsis
Question 16 · When do the warranties start?
IDPX-16 · V. Site Observation and Close-Out · Multiple choice, 3 options
The architect issues a G704–2017 Certificate of Substantial Completion that records May 3 as the date of substantial completion, with a list of items still to finish. The certificate doesn't list any different warranty start dates. When do the required warranties begin?
- A. May 3, the date of substantial completion
- B. When final payment is made
- C. When every item on the list is finished
Show answer and explanation
Correct answer: A. May 3, the date of substantial completion.
AIA's G704–2017 instructions say required warranties start on the date of substantial completion unless the certificate lists different start dates. Unfinished list items don't push that date; they get finished within the time the certificate allows.
Why the other options are wrong
- B. Final payment comes later and doesn't set the warranty start under this form.
- C. Substantial completion can be certified while listed items remain.
Source: AIA, G704–2017 Certificate of Substantial Completion instructions — Using G704–2017; warranty start
Question 17 · Is the use even allowed here?
IDPX-17 · I. Feasibility Studies · Multiple choice, 3 options
A client wants to lease a former bank branch and open a fitness studio there. Before the lease is signed, which check answers whether a fitness studio is a permitted use at that address?
- A. A zoning (land-use) review with the local jurisdiction
- B. Confirming the building already has a certificate of occupancy
- C. Measuring the space to confirm the usable area
Show answer and explanation
Correct answer: A. A zoning (land-use) review with the local jurisdiction.
Zoning decides which uses are allowed where, and zoning is one of the feasibility knowledge areas on CIDQ's IDPX blueprint. Check it before the client commits to the lease.
Why the other options are wrong
- B. An existing certificate does not establish that the proposed fitness-studio use is permitted by zoning at that address.
- C. Area tells you whether it fits, not whether it's allowed.
Source: CIDQ IDPX Exam Blueprint (2026 & forward) — Both pages: overview, domain headings and task lists · SBA, Launch your business — Local zoning ordinances — Local zoning ordinances
Question 18 · Escalating an estimate
IDPX-18 · II. Scheduling and Budgeting · Fill in the blank (number)
Today's construction estimate is $200,000. Bids are expected in 2 years. The owner tells you to escalate the estimate at 4% per year, compounded yearly, with no other changes. What is the escalated estimate, in dollars?
Your answer: ________ dollars
Show answer and explanation
Correct answer: $216,320.
Year 1: $200,000 × 1.04 = $208,000. Year 2: $208,000 × 1.04 = $216,320. The 4% rate is given for this question; it isn't a forecast of real market pricing.
Common mistake: $216,000 adds simple interest (4% of $200,000, twice) instead of compounding. $208,000 escalates only one year.
Source: Original scenario; arithmetic shown in the explanation
Question 19 · Who contracts with whom under CM at risk?
IDPX-19 · III. Contracts, Procurement, and Permitting · Multiple choice, 4 options
Which statement about contract relationships on a construction-manager-at-risk (CM at risk) project is correct?
- A. The owner holds separate contracts with the architect and the CM
- B. The construction manager holds the architect's contract as a subconsultant
- C. The CM only advises the owner and takes on no construction risk
- D. The architect and the CM together form a single design-build entity
Show answer and explanation
Correct answer: A. The owner holds separate contracts with the architect and the CM.
The AIA/AGC primer describes CM at risk as a construction manager who provides preconstruction services during design and then takes on construction risk by holding the trade contracts. The architect has a separate contract with the owner, with no contract between the architect and the CM.
Why the other options are wrong
- B. There's no contract between the architect and the CM at risk.
- C. That describes a CM as adviser. "At risk" means the CM holds the trade contracts.
- D. That would be design-build.
Source: AIA/AGC, A Primer on Project Delivery Terms — pp. 3–4, CM at risk
Question 20 · Which submittal needs a follow-up?
IDPX-20 · IV. Construction Process · Table-row selection
Today is May 14. This log is current: a dash in the return field means the item is still awaiting review. Select the row in this submittal log that needs follow-up now because it's still awaiting the architect's action and past its review due date.
| Row | Exhibit entry |
|---|---|
| 1 | Casework shop drawings · Received Apr 20 · Due May 4 · Returned May 3 · Approved as noted |
| 2 | Wall-covering samples · Received Apr 28 · Due May 12 · Returned: — · Status: — |
| 3 | Light fixture product data · Received May 10 · Due May 24 · Returned: — · Status: — |
| 4 | Door hardware product data · Received Apr 15 · Due Apr 29 · Returned May 6 · Revise and resubmit |
Your answer: Row ________
Show answer and explanation
Correct answer: Row 2.
Row 2 is open and its due date (May 12) has passed. Row 3 is open but not due until May 24. Row 4 came back late, but it was returned, so the next move is the contractor's resubmittal. Under this log's stated convention, a dash means the review remains open; it doesn't mean approved or rejected. Under A201–2017 §4.2.7, the architect reviews submittals on the agreed submittal schedule or, without one, with reasonable promptness, so tracking due dates matters.
Common mistake: Row 4 is tempting because it was late, but it isn't open. Row 3 is open but on time.
Source: AIA A201–2017, publisher’s standard-form sample — §4.2.7, p. 18 · AIA Contract Documents, What Is a Submittal in Construction? — Common Types; responsibility discussion; Are Submittals Part of the Contract Documents?
Question 21 · The field-report line that oversteps
IDPX-21 · V. Site Observation and Close-Out · Table-row selection
This project uses AIA A201–2017 General Conditions, and the architect administers the construction contract. Select the line in the architect's field report that goes beyond the architect's role.
| Row | Exhibit entry |
|---|---|
| 1 | Level 2 corridor ceiling grid installed; spacing appears consistent with the drawings. |
| 2 | Wall covering in Room 214 has a visible seam misalignment; contractor to correct per the specification. |
| 3 | Told the drywall foreman to change the crew's taping sequence to speed up the work. |
| 4 | Requested the contractor's updated millwork delivery schedule before the next visit. |
| 5 | Weather clear; about 12 workers on site. |
Your answer: Row ________
Show answer and explanation
Correct answer: Row 3.
Changing a crew's work sequence is a construction means-and-methods decision, and A201–2017 §4.2.2 leaves those to the contractor. The other lines record observations, note a deviation for the contractor to correct, or request information, which is what a field report like AIA's G711 is for.
Common mistake: Line 2 can look like an order, but it records a deviation from the specification for the contractor to fix. It doesn't tell the contractor how to do the work.
Source: AIA A201–2017, publisher’s standard-form sample — §4.2.2, p. 18 · AIA, G711–2018 Architect's Field Report instructions — Synopsis; Completing G711–2018
Question 22 · Using the responsibility matrix
IDPX-22 · I. Feasibility Studies · Matching (text-based)
The project's responsibility matrix says: the owner's sponsor approves the funding cap; the operations manager confirms how spaces will be used; the design lead coordinates the engineering consultants. Match each open question to the person who answers it under this matrix.
- Can the budget rise from $1.2 million to $1.3 million?
- Will the mailroom run two shifts?
- Do the light fixtures conflict with the sprinkler heads?
Choices: Design lead · Operations manager · Owner's sponsor
Show answer and explanation
Correct matches: 1. Owner's sponsor; 2. Operations manager; 3. Design lead.
A responsibility matrix exists so decisions go to the person assigned to them. Funding is the sponsor's, how the space operates is the operations manager's, and coordination between consultants is the design lead's. CSU's guidelines call for sorting stakeholders by role and interest for the same reason.
Common mistake: This tests the stated matrix, not a universal rule. On another project the same decisions could sit with different people.
Source: California State University, Feasibility Study Guidelines — §1.4, p. 4; role assignments supplied in the item
Question 23 · Find the estimate error
IDPX-23 · II. Scheduling and Budgeting · Table-row selection
Select the line in this cost estimate whose total is wrong.
| Row | Exhibit entry |
|---|---|
| 1 | Carpet tile: 1,200 sq yd × $42.00 = $50,400 |
| 2 | Paint: 9,500 sq ft × $1.20 = $11,400 |
| 3 | Acoustic ceiling tile: 4,000 sq ft × $3.50 = $12,000 |
| 4 | Rubber base: 800 lin ft × $4.25 = $3,400 |
Your answer: Row ________
Show answer and explanation
Correct answer: Row 3.
4,000 × $3.50 = $14,000, not $12,000, so line 3 understates the estimate by $2,000. The others check out: 1,200 × 42 = 50,400; 9,500 × 1.20 = 11,400; 800 × 4.25 = 3,400. Check every extension before an estimate goes to the owner.
Common mistake: Line 4 has the odd-looking unit price, but its math is right.
Source: Original scenario; arithmetic shown in the explanation
Question 24 · A quotation with a blank
IDPX-24 · III. Contracts, Procurement, and Permitting · Multiple choice, 4 options
An FF&E invitation for quotations requires vendors to list installation as a separate priced item. The instructions allow the owner to ask for clarifications before award. Vendor C has the lowest total, but its quotation lists delivery only and leaves installation blank. No award has been made. What should happen before the quotations are compared?
- A. Award to Vendor C, since its total is the lowest received
- B. Assume Vendor C's total already includes installation
- C. Ask Vendor C to clarify its installation scope and price
- D. Reject every quotation and issue a new invitation
Show answer and explanation
Correct answer: C. Ask Vendor C to clarify its installation scope and price.
You can't compare quotations until they cover the same scope. AIA's A751 FF&E quotation instructions set out how vendors ask questions and how quotations are clarified and reviewed, and these instructions expressly allow clarification. The clarification does not itself establish that Vendor C is eligible for award; the issued quotation instructions still control.
Why the other options are wrong
- A. The lowest total may be lowest only because installation is missing.
- B. Assuming the scope is included is how disputes start.
- D. One incomplete quotation doesn't spoil the others. The permitted clarification establishes the missing information before the owner decides how to treat Vendor C's quotation.
Source: AIA, A751–2019 FF&E quotation instructions summary — Articles 3–4; project’s clarification rule stated in the item
Question 25 · What submittal review covers
IDPX-25 · IV. Construction Process · Multiple choice, 4 options
This project uses AIA A201–2017 General Conditions, and the architect administers the construction contract. The contractor asks the architect to confirm every dimension on the casework shop drawings so the shop can fabricate without field measuring. What does the architect's review cover?
- A. Every dimension and quantity, so the shop can fabricate from the reviewed drawings
- B. Conformance with the design concept and the Contract Documents, not verification of the accuracy and completeness of field dimensions or quantities
- C. The fabricator's methods and installation sequence, so the work goes in correctly
- D. Only whether the owner likes the look, since the specifications cover the rest
Show answer and explanation
Correct answer: B. Conformance with the design concept and the Contract Documents, not verification of the accuracy and completeness of field dimensions or quantities.
A201–2017 §4.2.7 limits the architect's review to checking conformance with the information and design concept in the Contract Documents. It does not transfer responsibility for the accuracy and completeness of dimensions or quantities from the contractor. The standard provision also says review is not approval of construction means, methods or safety precautions. Field measuring stays with the contractor.
Why the other options are wrong
- A. Review does not relieve the contractor of checking the accuracy and completeness of field dimensions or quantities.
- C. Means and methods aren't approved by review.
- D. The review is against the Contract Documents, not taste.
Source: AIA A201–2017, publisher’s standard-form sample — §4.2.7, pp. 18–19
Question 26 · Starting the close-out list
IDPX-26 · V. Site Observation and Close-Out · Multiple choice, 3 options
Under AIA A201–2017, the contractor believes the work is substantially complete. What happens first?
- A. The contractor prepares a list of the items still to finish or correct
- B. The architect writes the punch list from scratch
- C. The owner issues the certificate of substantial completion
Show answer and explanation
Correct answer: A. The contractor prepares a list of the items still to finish or correct.
AIA's G704–2017 instructions say the contractor prepares the list of items to complete or correct, and the architect checks and revises it. The architect prepares the certificate once the work is substantially complete, and the owner, architect and contractor all sign it. Leaving an item off the list doesn't relieve the contractor of finishing it.
Why the other options are wrong
- B. The architect reviews and revises the contractor's list rather than starting it.
- C. The architect prepares the certificate; the owner signs it along with the others.
Source: AIA, G704–2017 Certificate of Substantial Completion instructions — Using G704–2017 · AIA A201–2017, publisher’s standard-form sample — §9.8.2, p. 26
Question 27 · Does the program fit?
IDPX-27 · I. Feasibility Studies · Multiple choice, 3 options
A client's program needs 2,000 net square feet of rooms. The client's planning standard adds circulation equal to 25% of the net area, so required usable area = net × 1.25. The candidate space has 2,400 usable square feet. What's the result?
- A. It fits, with 400 square feet to spare
- B. It's 100 square feet short
- C. It's 200 square feet short
Show answer and explanation
Correct answer: B. It's 100 square feet short.
Required usable area = 2,000 × 1.25 = 2,500 square feet. Available is 2,400, so the space is 100 square feet short. The circulation factor comes from the client's standard in this question; it isn't a code value.
Why the other options are wrong
- A. That compares net program area with usable area and skips circulation.
- C. That applies the factor to the available space (2,400 × 0.75 = 1,800 net), which isn't the stated method.
Source: Original scenario; arithmetic shown in the explanation
Question 28 · Will the order arrive in time?
IDPX-28 · II. Scheduling and Budgeting · Multiple choice, 3 options
A custom reception desk goes through these steps, one after another: shop drawing review, 1 week; fabrication, 6 weeks; shipping, 2 weeks; installation, 1 week. Eight weeks remain before the opening date. What does the schedule show?
- A. It fits, with about two weeks to spare
- B. It needs 10 weeks, two more than are available
- C. It fits exactly into the eight weeks
Show answer and explanation
Correct answer: B. It needs 10 weeks, two more than are available.
1 + 6 + 2 + 1 = 10 weeks, against 8 available. Finding the conflict early lets the owner choose among real options, such as a different product, an interim desk, or a later date. Whether any of them works depends on the project; the schedule only tells you there's a problem.
Why the other options are wrong
- A. Ten weeks is more than eight.
- C. It's two weeks over, not even.
Source: Original scenario; arithmetic shown in the explanation · GAO Schedule Assessment Guide (GAO–16–89G) — Best Practice 2, sequencing activities
Question 29 · Billing additional services
IDPX-29 · III. Contracts, Procurement, and Permitting · Fill in the blank (number)
The owner authorized additional services in writing, billed hourly plus reimbursable expenses. The lead designer worked 12 hours at $150 per hour, and a technical designer worked 20 hours at $90 per hour. Reimbursable expenses were $120. There's no markup or tax. What is the total additional fee, in dollars?
Your answer: ________ dollars
Show answer and explanation
Correct answer: $3,720.
(12 × $150) + (20 × $90) + $120 = $1,800 + $1,800 + $120 = $3,720. Fee structures are an IDPX contract topic. The rates here are invented for practice, not market data.
Common mistake: $3,600 leaves out the reimbursables. $7,680 multiplies all 32 hours by the $240 combined rate.
Source: Original scenario; arithmetic shown in the explanation · CIDQ IDPX Exam Blueprint (2026 & forward) — Both pages: overview, domain headings and task lists
Question 30 · A six-inch move
IDPX-30 · IV. Construction Process · Multiple choice, 3 options
This project uses AIA A201–2017 General Conditions, and the architect administers the construction contract. The owner asks to move a wall sconce 6 inches so it centers over a bench. It doesn't change the contract sum or time, and it fits the design intent. Which instrument may the architect issue alone, without the owner's and contractor's signatures?
- A. A change order
- B. A construction change directive
- C. The architect's order for a minor change in the work
Show answer and explanation
Correct answer: C. The architect's order for a minor change in the work.
A201–2017 §§7.1.2 and 7.4 let the architect alone issue a written order for a minor change that does not adjust the contract sum or time and is consistent with the intent of the Contract Documents. This matches the facts given. The instruction still needs to be in writing.
Why the other options are wrong
- A. A change order can record a zero-cost change, but it requires the owner, architect and contractor to sign.
- B. A construction change directive requires the owner's and architect's signatures; it is not issued by the architect alone.
Source: AIA A201–2017, publisher’s standard-form sample — §§7.1.2, 7.2.1, 7.3.1 and 7.4, pp. 21–23 · AIA, G710–2017 Architect’s Supplemental Instructions — Synopsis · AIA Contract Documents, Construction Change Directives vs. Change Orders — Comparison of change orders and construction change directives; signatures and proceeding with work
Question 31 · Is the new office working?
IDPX-31 · V. Site Observation and Close-Out · Multiple choice, 4 options
Eight months after move-in, the owner wants to know whether the new open office is working for staff and what to change on the next floor. Which activity fits?
- A. A punch-list walk
- B. A post-occupancy evaluation
- C. Commissioning
- D. A warranty claim
Show answer and explanation
Correct answer: B. A post-occupancy evaluation.
A post-occupancy evaluation (POE) systematically assesses a building after people have used it for a while, measures it against the goals that guided the design, and feeds lessons into future projects. That's exactly the owner's question.
Why the other options are wrong
- A. Punch lists close out construction; they don't evaluate how the space works for people.
- C. Functional testing of building systems alone does not answer how well staff experience the office layout. The requested activity is an occupant-focused evaluation.
- D. Warranty claims address defective work.
Source: National Academies, Learning from Our Buildings (2001), ch. 2 — Chapter 2, p. 9
Question 32 · The estimate is over the grant
IDPX-32 · I. Feasibility Studies · Multiple choice, 4 options
Your feasibility estimate is $1.15 million. The owner's funding is a grant capped at $1.0 million that can't be increased. What's the best next step?
- A. Start schematic design and plan to value-engineer the gap away later
- B. Delete the contingency so the estimate fits within the grant
- C. Go to bid and see whether prices come back under the cap
- D. Report the $150,000 gap now with options so the owner decides before design continues
Show answer and explanation
Correct answer: D. Report the $150,000 gap now with options so the owner decides before design continues.
The funding gap is $1,150,000 − $1,000,000 = $150,000. Feasibility studies exist to surface problems like this while they're cheap to fix. The owner needs the gap and real options before more design money is spent. CSU's guidelines frame the study as the basis for that decision.
Why the other options are wrong
- A. Designing a project the owner can't fund wastes fees and time.
- B. Removing contingency hides the risk rather than solving it.
- C. Bidding an unfundable project wastes everyone's effort.
Source: California State University, Feasibility Study Guidelines — §1.1, p. 3
Question 33 · Phasing an occupied office
IDPX-33 · II. Scheduling and Budgeting · Ordering (text-based)
An office renovation happens in two phases while staff keep working. One swing space (temporary space) is available and can hold only one phase's staff at a time. Each area must be vacated before renovation, and a receiving area must be finished, furnished and approved as ready for use before staff move in. Put these steps in order, first to last.
- A. Renovate the Phase 1 area
- B. Move Phase 2 staff into the swing space and start Phase 2
- C. Finish and furnish the swing space
- D. Move Phase 1 staff into their renovated area
- E. Move Phase 1 staff into the swing space
Your sequence: ________ → ________ → ________ → ________ → ________
Show answer and explanation
Correct order: C → E → A → D → B.
Each step depends on the one before it. Staff can't move into swing space that isn't ready, the Phase 1 area can't be renovated while people are in it, and the swing space isn't free for Phase 2 until Phase 1 staff move out. That chain of dependencies is what a phasing schedule maps.
Common mistake: The usual slip is starting Phase 2 before Phase 1 staff have moved home, which leaves two groups needing one swing space.
Source: GAO Schedule Assessment Guide (GAO–16–89G) — Best Practice 2; project dependencies stated in the item
Question 34 · Buying as the owner's agent
IDPX-34 · III. Contracts, Procurement, and Permitting · Multiple choice, 3 options
The architect provides FF&E purchasing agent services under AIA B254–2019 and signs a contract for task chairs within the owner's authorization. Who must the vendor contract name as the purchaser?
- A. The architect
- B. The owner
- C. The installer
Show answer and explanation
Correct answer: B. The owner.
Under B254–2019 the architect acts as the owner's agent. Each vendor contract must name the owner as purchaser, and warranties are issued in the owner's name. The architect isn't buying the chairs for resale.
Why the other options are wrong
- A. The architect signs as the owner's agent, not as the buyer.
- C. The installer isn't a party to the purchase.
Source: AIA, B254–2019 FF&E purchasing agent services summary — Synopsis; Purpose
Question 35 · A change before quotations are due
IDPX-35 · III. Contracts, Procurement, and Permitting · Multiple choice, 4 options
Ten days before FF&E quotations are due, the owner switches the specified upholstery fabric. The instructions say changes are issued to all vendors as numbered addenda. What's the right step?
- A. Issue a numbered addendum to every vendor before the due date
- B. Call the one vendor who asked about fabric and tell them
- C. Wait and issue a change order after award
- D. Answer it as an RFI to the vendor who asked
Show answer and explanation
Correct answer: A. Issue a numbered addendum to every vendor before the due date.
Addenda keep every vendor pricing the same documents. AIA's A751 FF&E quotation instructions cover how updates to the quotation documents are sent out, and this project's instructions say how: numbered addenda to all vendors. A change order is for changes after a contract exists.
Why the other options are wrong
- B. Telling one vendor gives them an unfair advantage and leaves the others pricing the wrong fabric.
- C. Nothing has been awarded yet, and waiting means every quotation prices the wrong fabric.
- D. An RFI answer to one vendor doesn't reach everyone.
Source: AIA, A751–2019 FF&E quotation instructions summary — Article 3, addenda
Question 36 · Pricing the award with alternates
IDPX-36 · III. Contracts, Procurement, and Permitting · Fill in the blank (number)
The low bid is an $88,000 base bid. Alternate A adds $6,000. Alternate B deducts $4,000. The owner accepts only Alternate B. There are no other adjustments. What contract amount should the award recommendation show, in dollars?
Your answer: ________ dollars
Show answer and explanation
Correct answer: $84,000.
$88,000 − $4,000 = $84,000. Only accepted alternates change the contract amount; Alternate A was priced but not accepted.
Common mistake: $90,000 applies both alternates. $94,000 applies only Alternate A, the one the owner rejected.
Source: Original scenario; arithmetic shown in the explanation
Vignette: Riverside Branch Library renovation (Questions 37–40)
A city is renovating its Riverside Branch Library. The city (owner) has separate contracts with the architect and the general contractor. The construction contract uses AIA A201–2017 General Conditions, and the architect administers it. The children's area is finished; the main reading room is still under construction. The city wants to open the children's area for a summer reading program.
| Project item | Status |
|---|---|
| Circulation desk top | Drawing A-501 shows quartz. Specification section 12 36 00 calls for solid surface. Nothing has been issued to resolve it. |
| Added power at the circulation desk | The owner and architect signed a construction change directive. The contractor disagrees with the proposed price adjustment. |
| Pay application No. 4 | Work completed and stored to date: $250,000. Retainage: 10% of work completed and stored. Total of previous certificates for payment: $180,000. |
Question 37 · Opening part of the building early
IDPX-37 · V. Site Observation and Close-Out · Multiple choice, 4 options
In the Riverside Branch Library renovation, the finished children's area is to open while the reading room remains under construction. For this scenario, apply the 2021 IBC §111.3 temporary-occupancy provision. The building official has determined that the children's area can be occupied safely. Which governmental approval permits that early use for the period the official specifies?
- A. A certificate of substantial completion for the children's area
- B. The contractor's sign-off that the children's area is done
- C. A letter from the city's facilities director
- D. A temporary certificate of occupancy from the building official
Show answer and explanation
Correct answer: D. A temporary certificate of occupancy from the building official.
The 2021 IBC §111.3 provision allows the building official to issue a temporary certificate of occupancy before all permitted work is finished when the portion to be occupied can be used safely. The official sets its validity period. A certificate of substantial completion for a portion is a contract milestone between the parties, but it isn't the jurisdiction's permission to occupy.
Why the other options are wrong
- A. It's a contract milestone between owner, architect and contractor, not a governmental approval.
- B. The contractor doesn't have that authority.
- C. A facilities director isn't the building official, even when the owner is the same city.
Source: ICC, 2021 Application and Administration of the I-Codes — §111.3, slide 144, PDF p. 48 · AIA, G704–2017 Certificate of Substantial Completion instructions — Synopsis; Using G704–2017; execution/signature guidance
Question 38 · Quartz or solid surface?
IDPX-38 · IV. Construction Process · Multiple choice, 4 options
At Riverside Branch Library, AIA A201–2017 governs and the architect administers the construction contract. Drawing A-501 shows a quartz circulation desk top, but the specification calls for solid surface. Nothing has been issued to resolve it. What should the contractor do?
- A. Use whichever of the two materials costs less
- B. Send the architect an RFI and hold fabrication of that top
- C. Ask the city's project manager and build to that answer
- D. Fabricate both tops and bill the city for the extra one
Show answer and explanation
Correct answer: B. Send the architect an RFI and hold fabrication of that top.
A201–2017 §3.2.2 requires the contractor to report discovered document inconsistencies to the architect as an RFI. Here, holding fabrication of the disputed top avoids committing to an unresolved material choice; it is not a direction to stop unrelated work. An RFI asks for clarification; it doesn't by itself authorize extra cost or time.
Why the other options are wrong
- A. Picking the cheaper option resolves the conflict in the contractor's favor without authority.
- C. Questions about the documents go through the architect, who administers the contract.
- D. Nothing authorizes a second top.
Source: AIA A201–2017, publisher’s standard-form sample — §3.2.2, p. 12 · AIA, G716–2004 Request for Information instructions — Synopsis
Question 39 · Directed, but not agreed
IDPX-39 · IV. Construction Process · Multiple choice, 3 options
At Riverside Branch Library, AIA A201–2017 governs and the architect administers the construction contract. The owner and architect signed a construction change directive for added power at the circulation desk. The contractor disagrees with the proposed price adjustment. What should the contractor generally do?
- A. Proceed with the directed work while the adjustment is worked out
- B. Refuse to start until a change order is signed
- C. Treat the directive as void because it lacks the contractor's signature
Show answer and explanation
Correct answer: A. Proceed with the directed work while the adjustment is worked out.
A construction change directive takes effect with the owner's and architect's signatures; the contractor's isn't required. AIA explains that under A201 the contractor is generally expected to proceed with the directed work while cost and time are settled. If the parties later agree, a change order records it.
Why the other options are wrong
- B. Waiting for agreement is exactly what a CCD is designed to avoid.
- C. The contractor's signature isn't needed for a CCD to take effect.
Source: AIA Contract Documents, Construction Change Directives vs. Change Orders — Signatures and proceeding with directed work
Question 40 · Calculating Pay Application No. 4
IDPX-40 · V. Site Observation and Close-Out · Fill in the blank (number)
Riverside Branch Library's Pay Application No. 4 lists eligible work completed and stored to date of $250,000, retainage of 10% of that entire amount, and previous certificates for payment totaling $180,000. There are no other adjustments. Using the G702 calculation (work completed and stored, less retainage, less previous certificates), what is the current payment requested, in dollars?
Your answer: ________ dollars
Show answer and explanation
Correct answer: $45,000.
Retainage = 10% × $250,000 = $25,000. Earned less retainage = $225,000. Less previous certificates: $225,000 − $180,000 = $45,000. That's the same flow as AIA's G702 form: work completed and stored, less retainage, less previous certificates. The architect still reviews the application and may certify a different amount.
Common mistake: $70,000 forgets retainage. $20,000 subtracts retainage twice.
Source: Original scenario; arithmetic shown in the explanation · AIA, G702–1992 Application and Certificate for Payment instructions — Using G702, lines 4–8
Score yourself
Count one point per question. Matching and ordering questions count only if every part is right. Then total your points by domain using the domain column below.
For a first-attempt tally, record your answer before revealing the explanation. Keep correct, incorrect and unanswered counts separate; mark an answer you viewed first as studied, not independently correct. Retrying a question is useful practice, but it does not replace the first-attempt record. These are this set's practice rules, not CIDQ's marking rules.
| Question | Domain | Answer |
|---|---|---|
| 1 | III | B |
| 2 | I | C |
| 3 | II | 18 working days |
| 4 | IV | 1 → Shop drawing; 2 → Product data; 3 → Sample |
| 5 | V | A |
| 6 | III | C |
| 7 | I | C |
| 8 | II | $356,000 |
| 9 | IV | C |
| 10 | III | 1 → Bid bond; 2 → Performance bond; 3 → Payment bond |
| 11 | V | C |
| 12 | I | D |
| 13 | II | A |
| 14 | III | D |
| 15 | IV | B |
| 16 | V | A |
| 17 | I | A |
| 18 | II | $216,320 |
| 19 | III | A |
| 20 | IV | Row 2 |
| 21 | V | Row 3 |
| 22 | I | 1 → Owner's sponsor; 2 → Operations manager; 3 → Design lead |
| 23 | II | Row 3 |
| 24 | III | C |
| 25 | IV | B |
| 26 | V | A |
| 27 | I | B |
| 28 | II | B |
| 29 | III | $3,720 |
| 30 | IV | C |
| 31 | V | B |
| 32 | I | D |
| 33 | II | C → E → A → D → B |
| 34 | III | B |
| 35 | III | A |
| 36 | III | $84,000 |
| 37 | V | D |
| 38 | IV | B |
| 39 | IV | A |
| 40 | V | $45,000 |
| Domain | Questions on this page | Your score |
|---|---|---|
| I. Feasibility Studies | 7 | ___ / 7 |
| II. Scheduling and Budgeting | 7 | ___ / 7 |
| III. Contracts, Procurement, and Permitting | 10 | ___ / 10 |
| IV. Construction Process | 8 | ___ / 8 |
| V. Site Observation and Close-Out | 8 | ___ / 8 |
| Total | 40 | ___ / 40 |
Your total is feedback on these 40 questions, nothing more. The real IDPX is scored on CIDQ's scale of 200 to 800, with 500 to pass, and the scale is statistically equated across exam versions (CIDQ, About the Exams). A percentage here doesn't convert to that scale or predict a result, and these small domain samples cannot measure domain readiness precisely. Use the domain column to see where your misses cluster.
Turn each miss into a review task
- Say the distinction out loud without looking. Many of these questions hinge on two documents or roles that sound alike, such as a change order and a construction change directive. If you can't explain the difference in one sentence, that's the gap.
- Open the source under the explanation. Read the specific section linked there, not the whole document.
- Redo the math questions from scratch. For Questions 3, 8, 18, 29, 36 and 40, cover the explanation and rework the numbers. The common mistakes listed under each one show the usual slips: counting something twice or leaving something out.
Who does what: the documents in this practice set
The IDPX tests construction administration and project management, and many questions in this set turn on who prepares, signs or decides something. This table pulls those answers together. It follows AIA's standard documents; your own project's contract governs.
| Document or action | What it's for | Who acts | Practice questions |
|---|---|---|---|
| Change order | Records a change the parties agree on, including any change to price or time | Signed by owner, architect and contractor (AIA) | 39 |
| Construction change directive (CCD) | Directs changed work before price or time is agreed | Signed by owner and architect; the contractor's signature isn't required, and the contractor generally proceeds (AIA) | 39 |
| Order for a minor change | Small change with no change to price or time, consistent with design intent | Architect issues a written order (A201–2017 §§7.1.2, 7.4) | 30 |
| Proposal request (G709) | Asks the contractor to price a possible change; doesn't authorize work | Architect sends; contractor prices (AIA) | 15 |
| Request for information (RFI) | Asks for clarification of the documents; doesn't authorize extra cost or time | Contractor reports conflicts to the architect (A201–2017 §3.2.2; AIA) | 38 |
| Submittal review | Checks design/document conformance; does not take over field-dimension verification or automatically authorize deviations | Contractor submits; architect reviews (A201–2017 §4.2.7, §3.12.8) | 9, 20, 25 |
| Substantial completion list (punch list) | Items still to finish or correct | Contractor prepares; architect checks and revises (AIA G704) | 26 |
| Certificate of substantial completion | Sets the substantial completion date; warranties start then unless the form lists other dates | Architect prepares; owner, architect and contractor sign (AIA G704) | 16 |
| Certificate for payment | Certifies the amount due on a pay application | Contractor applies; architect certifies; owner pays (AIA G702) | 40 |
| Certificate of occupancy (permanent or temporary) | Permission to use the building or a portion of it | Building official (ICC, 2021 IBC §111, slides 142–144) | 37 |
A201 calls the contract administrator "the architect," and these questions use that word. These scenarios do not assign that contractual authority to every interior designer.
How this set compares with the real IDPX
| Row label | Real IDPX | This practice set |
|---|---|---|
| Questions | 115, of which 15 are unscored pretest questions | 40, all counted |
| Time | 3 hours | Untimed. Multiplying the official average of 180 ÷ 115 minutes per question by 40 gives about 63 minutes; that is arithmetic, not an exam-equivalent time limit |
| Question types | Three- and four-option multiple choice, drag and place, fill in the blank, and hot spot | 27 multiple-choice questions, 6 numeric entries, 3 matching tasks, 1 ordering task and 3 table-row selections; no graphical hot-spot activity or testing-interface simulation |
| Vignettes | Short scenarios with 3–5 questions each appear on all three NCIDQ exams | One vignette with 4 questions (37–40) |
| Codes | Based on the 2021 IBC, 2021 IRC, 2021 IPC and ICC A117.1–2017 for the April 2026-and-forward framework. CIDQ provides its exam code resource with relevant questions | No code lookups needed |
| Calculator | On-screen calculator; a handheld calculator requires an approved accommodation | Use whatever you like |
| Scoring | Scaled 200–800; 500 passes | Points out of 40 |
Sources: CIDQ IDPX Exam Blueprint; NCIDQ Candidate Handbook, p. 19 (format), p. 26 (calculator and accommodation exception), p. 32 (scoring); CIDQ blueprint FAQs (vignettes); CIDQ Building Codes document; CIDQ Exam Reference Materials.
The IDPX is given in two windows a year, April 1–30 and October 1–31, at Prometric test centers or by remote proctoring, and you can take each section once per window (Handbook, pp. 13, 24, 33). CIDQ reported a 60% IDPX pass rate for Spring 2026 and 65% for Fall 2025 (CIDQ, About the Exams). Those administrations used different blueprint versions. The published table does not give cohort counts or separate first-time and repeat candidates, so the figures do not establish a trend or your personal chance of passing.
CIDQ's publicly linked code-reference roadmap is a table of contents and section list, not the full code text supplied within the examination. No external code lookup is needed to answer this set.
What this practice test covers
CIDQ's current IDPX blueprint focuses on construction administration and project management. This set samples all five domains. Questions are mapped to the task they actually test; the counts below are not an exact reproduction of the exam weights.
| Domain | CIDQ weight | Questions here | Question numbers |
|---|---|---|---|
| I. Feasibility Studies | 17% | 7 | 2, 7, 12, 17, 22, 27, 32 |
| II. Scheduling and Budgeting | 17% | 7 | 3, 8, 13, 18, 23, 28, 33 |
| III. Contracts, Procurement, and Permitting | 28% | 10 | 1, 6, 10, 14, 19, 24, 29, 34, 35, 36 |
| IV. Construction Process | 21% | 8 | 4, 9, 15, 20, 25, 30, 38, 39 |
| V. Site Observation and Close-Out | 17% | 8 | 5, 11, 16, 21, 26, 31, 37, 40 |
| Total | 100% | 40 | Blank |
Weights are from the CIDQ IDPX Exam Blueprint. Forty questions sample each domain; they can't cover every task and knowledge statement on the blueprint. There are no questions on the BOMA calculation method or business structures, which CIDQ removed from the exams starting in 2026; Question 27 uses only its expressly supplied, hypothetical area factor (blueprint FAQs).
Free practice from CIDQ
When you're done here, CIDQ's own free materials are the next stop:
- IDPX practice questions: 10 official multiple-choice sample questions. This is a separate official sample, not the source of the questions above.
- Demo exam and study materials: CIDQ's demo shows the testing interface, and this page links the blueprints, the exam reference list and the code document.
- NCIDQ Candidate Handbook: the rules for scheduling, exam day and scoring.
For an overview of all three NCIDQ sections, see our NCIDQ exam prep guide.
Sources
Examination facts are supported by the CIDQ publications linked above. Each question links the source for its own teaching principle; the project facts and arithmetic are original examples.
CIDQ
CIDQ IDPX Exam Blueprint (2026 & forward); NCIDQ Candidate Handbook (Dec 2025 edition); CIDQ, About the Exams; CIDQ, New Exam Blueprint FAQs; CIDQ exam code-reference roadmap (rev. 9/2025); CIDQ, Exam Reference Materials (rev. Nov 3, 2025).
Contracts and project practice
AIA A201–2017, publisher’s standard-form sample; AIA Contract Documents, Construction Change Directives vs. Change Orders; AIA Contract Documents, What Is a Submittal in Construction?; AIA, G702–1992 Application and Certificate for Payment instructions; AIA, G704–2017 Certificate of Substantial Completion instructions; AIA, G709–2018 Proposal Request instructions; AIA, G710–2017 Architect’s Supplemental Instructions; AIA, G711–2018 Architect's Field Report instructions; AIA, G716–2004 Request for Information instructions; AIA, A751–2019 FF&E quotation instructions summary; AIA, B254–2019 FF&E purchasing agent services summary; AIA/AGC, A Primer on Project Delivery Terms; DBIA, What Is Design-Build?.
Codes, procurement and building performance
ICC, 2021 Application and Administration of the I-Codes; Maine UCC §2-319, F.O.B. and F.A.S. terms; Maine UCC §2-509, Risk of loss; Maine UCC §2-510, Effect of breach on risk of loss; U.S. Small Business Administration, Surety bonds; SBA, Launch your business — Local zoning ordinances; FAR 48.101, Value engineering: general; GAO Schedule Assessment Guide (GAO–16–89G); California State University, Feasibility Study Guidelines; GSA, Building commissioning, retro-commissioning and re-tuning; National Academies, Learning from Our Buildings (2001), ch. 2.
By Castleport Test Prep Editorial Team
Last verified: October 13, 2026. The linked CIDQ publications were checked for examination format, domain weights, scoring, testing windows, the two published pass-rate figures and reference editions. The linked primary sources and original calculations were checked for the question explanations. AI assistance was used for source checking and consistency checks, as described in our editorial methodology. This was not a credentialed professional review.
Castleport Test Prep is an independent exam prep publisher. We aren't affiliated with, endorsed by, or approved by the Council for Interior Design Qualification (CIDQ). NCIDQ, IDFX, IDPX and IDIX are used only to identify the exams; trademarks belong to their respective owners. These practice questions are original and are not real, recalled or reproduced exam questions. AIA document references describe the named standard forms; your actual contract governs. Practice results don't guarantee an exam score, certification or licensure.