Site drawings held by the general contractor show an abandoned fuel tank buried near where your outriggers will be set. Under OSHA's crane rule, who has to tell the crane user and the operator where that tank is?
- A. The general contractor, as the controlling entity
- B. The local building department
- C. The rigging crew foreman
- D. The operator, after ordering a soil survey
Show answer and explanation
Correct answer: A. OSHA puts this on the controlling entity, the prime or general contractor with overall responsibility for the project. It must tell the equipment user and the operator about hazards beneath the set-up area, such as voids, tanks and utilities, when those hazards appear in documents it holds or are otherwise known to it. It must also make sure the ground preparations are provided.
Why the other choices don't fit
- B: The building department isn't the party named in 1926.1402.
- C: The rigging foreman has no duty under this paragraph.
- D: The rule doesn't require the operator to commission a survey. The operator still checks ground conditions on every shift inspection.
Source: OSHA, 29 CFR 1926.1402 Ground conditions, paragraph (c)(1) and (c)(2); OSHA, 29 CFR 1926.1401 Definitions, "Controlling entity"; CCO, Mobile Crane Operator Candidate Handbook (MCO CH rev. 01/25), Core outline, Domain 1, item 6
Question 2 of 50
Domain 2: Operations · NCCCO-002
You're setting precast panels on the far side of a building and can't see the landing area from the cab. What does OSHA require?
- A. A mounted video camera
- B. A signal person
- C. A slower hoist speed, with no other change
- D. A second operator in the cab
Show answer and explanation
Correct answer: B. A signal person must be provided when the point of operation (the load travel or the area at load placement) is not in full view of the operator. OSHA also requires one when the view in the direction of travel is obstructed, or when the operator or the person handling the load decides one is needed for site-specific safety.
Why the other choices don't fit
- A: Video is one possible way to transmit signals, but the requirement is a signal person.
- C: Speed doesn't fix a blind landing.
- D: A second operator doesn't give you a view of the landing area.
Source: OSHA, 29 CFR 1926.1419 Signals, general requirements, paragraphs (a) and (e); CCO, Mobile Crane Operator Candidate Handbook (MCO CH rev. 01/25), Core outline, Domain 2, item 7
Question 3 of 50
Domain 3: Technical Knowledge · NCCCO-003
Who must perform the shift inspection on a crane, and what does it involve?
- A. A qualified person, disassembling and booming down
- B. A competent person, doing a visual check for apparent deficiencies
- C. A factory technician, with a 125 percent load test
- D. A registered engineer, once a week
Show answer and explanation
Correct answer: B. A competent person must begin a visual inspection before each shift the crane is used and finish it before or during that shift. It looks for apparent deficiencies in controls, hydraulics, hooks and latches, wire rope and reeving, tires, ground conditions, level, cab windows, safety devices and operational aids. Taking components apart or booming down isn't required unless what you see calls for it.
Why the other choices don't fit
- A: Disassembly is part of the annual/comprehensive inspection, not the shift inspection.
- C: A load test isn't part of the shift inspection.
- D: The shift inspection happens every shift, and an engineer isn't required.
Source: OSHA, 29 CFR 1926.1412 Inspections, paragraph (d)(1)
Question 4 of 50
Domain 1: Site · NCCCO-004
What is the main job of crane mats or blocking (cribbing) placed under outrigger floats?
- A. To insulate the crane from the ground near power lines
- B. To level the crane so a level indicator isn't needed
- C. To raise the crane so the tires clear the ground sooner
- D. To spread the outrigger load over a larger area of ground
Show answer and explanation
Correct answer: D. OSHA defines blocking (cribbing) as wood or other material used to support equipment and distribute loads to the ground, typically under outrigger and stabilizer floats. Manufacturer load charts make the same point: depending on the supporting surface, supports under the floats may be needed to spread the load to a larger bearing surface.
Why the other choices don't fit
- A: Wood blocking is not a power line protection measure. Power line rules rely on clearance distances and listed devices.
- B: Blocking doesn't replace the level check. OSHA requires a crane level indicator on the equipment.
- C: Tires come off the ground by extending and setting the outriggers. That isn't what blocking is for.
Source: OSHA, 29 CFR 1926.1401 Definitions, "Blocking"; OSHA, 29 CFR 1926.1402 Ground conditions, paragraph (a)(2); Manitowoc (Grove) RT640C Load Chart, Notes for Lifting Capacities (a real manufacturer chart, shown as an example), Setup note 1
Question 5 of 50
Domain 2: Operations · NCCCO-005
Mid-lift, a laborer who is not the assigned signal person gives an emergency stop signal. What do you do?
- A. Finish the current motion, then stop
- B. Radio the signal person to confirm first
- C. Stop
- D. Ignore it, since only the signal person can signal
Show answer and explanation
Correct answer: C. The operator must obey a stop or emergency stop signal no matter who gives it. OSHA's general rule is that only one person signals a crane at a time, with one exception: anyone who becomes aware of a safety problem must alert the operator or signal person with a stop or emergency stop signal.
Why the other choices don't fit
- A: A stop signal means stop, not finish the move.
- B: Checking first wastes the seconds the signal is meant to save.
- D: The one-signal-person rule has an exception for stop signals.
Source: OSHA, 29 CFR 1926.1417 Operation, paragraph (y); OSHA, 29 CFR 1926.1419 Signals, general requirements, paragraphs (h) and (j)
Question 6 of 50
Domain 3: Technical Knowledge · NCCCO-006
How long must the employer keep the documentation of a monthly crane inspection?
- A. 1 month
- B. 3 months
- C. 12 months
- D. 5 years
Show answer and explanation
Correct answer: B. The monthly inspection record must list the items checked and the results, plus the name and signature of the person who did it and the date. It must be kept for at least three months. Annual/comprehensive inspection records must be kept for at least 12 months.
Why the other choices don't fit
- A: Too short.
- C: 12 months is the retention period for the annual/comprehensive inspection record.
- D: Five years is the length of a crane operator certification, not an inspection record.
Source: OSHA, 29 CFR 1926.1412 Inspections, paragraphs (e)(3) and (f)(7)
Question 7 of 50
Domain 1: Site · NCCCO-007
Before assembling a crane near a power line rated up to 350 kV, the employer must find out whether any part of the crane, load line or load could get closer than what distance to the line during assembly?
- A. 10 feet
- B. 15 feet
- C. 20 feet
- D. 50 feet
Show answer and explanation
Correct answer: C. Under 1926.1407(a), the trigger distance is 20 feet for lines up to 350 kV. If the crane could get closer than that, the employer must choose one of three options: have the line deenergized and visibly grounded, keep 20 feet of clearance using the required precautions, or use the Table A clearance for the line's actual voltage with those same precautions.
Why the other choices don't fit
- A: 10 feet is the Table A minimum clearance for lines up to 50 kV. It isn't the trigger distance.
- B: 15 feet is the Table A minimum for lines over 50 kV up to 200 kV.
- D: 50 feet replaces 20 feet for lines over 350 kV, up to 1,000 kV (1926.1409).
Source: OSHA, 29 CFR 1926.1407 Power line safety, assembly and disassembly, paragraph (a); OSHA, 29 CFR 1926.1408 Power line safety, equipment operations, Table A; OSHA, 29 CFR 1926.1409 Power line safety (over 350 kV), paragraph (a)
Question 8 of 50
Domain 2: Operations · NCCCO-008
Which voice signal follows the order OSHA requires?
- A. "Stop... swing left... ten feet."
- B. "Up, up, up... OK, that's good."
- C. "Ten feet, slow... hoist up... stop."
- D. "Hoist up... ten feet, slow... hoist stop."
Show answer and explanation
Correct answer: D. Each voice signal must contain three elements in this order: function and direction (hoist up), distance and/or speed (ten feet, slow), then function and stop command (hoist stop). Before operations, the operator, signal person and lift director (if there is one) must also agree on the voice signals to be used.
Why the other choices don't fit
- A: It starts with the stop command and never closes with a function stop.
- B: No distance or speed and no function stop command.
- C: Distance comes before the function.
Source: OSHA, 29 CFR 1926.1421 Signals, voice signals, paragraphs (a) and (b)
Question 9 of 50
Domain 3: Technical Knowledge · NCCCO-009
A crane has sat idle in the yard for four months. Before it's put back to work, what does OSHA require?
- A. An inspection by a qualified person that meets the monthly requirements
- B. Only a shift inspection by the operator
- C. Nothing, if it passed its last annual
- D. A new annual inspection by an engineer
Show answer and explanation
Correct answer: A. Equipment idle for 3 months or more must be inspected by a qualified person, meeting the monthly inspection requirements, before its first use.
Why the other choices don't fit
- B: A shift inspection alone isn't enough after 3 months idle.
- C: The idle-equipment inspection is required regardless of the last annual.
- D: OSHA doesn't require a new annual or an engineer for idle equipment.
Source: OSHA, 29 CFR 1926.1412 Inspections, paragraph (h)
Question 10 of 50
Domain 1: Site · NCCCO-010
During disassembly, part of the boom would have to sit below an energized distribution line. When does OSHA allow that?
- A. When the boom stays at least 10 feet from the line
- B. When every tag line in use is nonconductive
- C. When a dedicated spotter watches the line the whole time
- D. Only after the utility deenergizes the line and visibly grounds it at the worksite
Show answer and explanation
Correct answer: D. OSHA prohibits any part of a crane, load line or load, partly or fully assembled, from being below a power line during assembly or disassembly unless the employer has confirmed that the utility owner/operator deenergized the line and visibly grounded it at the worksite.
Why the other choices don't fit
- A: A clearance distance alone doesn't lift the prohibition on assembly below the line.
- B: Tag lines near power lines must be nonconductive, but that doesn't make assembly below a live line allowed.
- C: A dedicated spotter is one of the encroachment precautions for working near a line. It doesn't permit assembly below one.
Source: OSHA, 29 CFR 1926.1407 Power line safety, assembly and disassembly, paragraph (c)
Question 11 of 50
Domain 2: Operations · NCCCO-011
You're lifting on radio signals when the radio goes dead in the middle of a lift. What should you do?
- A. Safely stop until communication is back and a proper signal is given and understood
- B. Keep making the last motion you were told to make
- C. Set the load down wherever it is, as fast as you can
- D. Take hand signals from whoever is closest
Show answer and explanation
Correct answer: A. If the ability to transmit signals is interrupted, the operator must safely stop operations that require signals until it is reestablished and a proper signal is given and understood. Radio equipment must also be tested on site before operations begin, use a dedicated channel, and be received hands-free.
Why the other choices don't fit
- B: Continuing blind is what the rule forbids.
- C: The rule says stop safely, not rush the load down.
- D: Only one person may give signals at a time, and the signals need to be agreed in advance.
Source: OSHA, 29 CFR 1926.1419 Signals, general requirements, paragraphs (f) and (h); OSHA, 29 CFR 1926.1420 Signals, radio and electronic transmission, paragraphs (a) through (c)
Question 12 of 50
Domain 3: Technical Knowledge · NCCCO-012
On a running wire rope that is not rotation resistant, which count of visible broken wires is a Category II deficiency under OSHA?
- A. Six random broken wires in one rope lay, or three in one strand in one lay
- B. Any single broken wire anywhere on the rope
- C. Two broken wires anywhere along the whole rope
- D. Twelve broken wires in one rope lay, and no fewer
Show answer and explanation
Correct answer: A. For running ropes, OSHA's Category II broken-wire criterion is six randomly distributed broken wires in one rope lay, or three broken wires in one strand in one rope lay. A rope lay is the length along the rope in which one strand makes one complete turn around it. Use of the rope must stop until it is replaced, the localized damage is cut out, or the rope manufacturer's own removal criterion is met.
Why the other choices don't fit
- B: A single broken wire isn't the running-rope removal criterion.
- C: Not OSHA's running-rope number. Two wires shows up in the rotation-resistant criterion, measured over six rope diameters.
- D: Twelve is double the threshold.
Source: OSHA, 29 CFR 1926.1413 Wire rope inspection, paragraphs (a)(2)(ii)(A)(1) and (a)(4)(ii)
Question 13 of 50
Domain 1: Site · NCCCO-013
You're traveling a crane across the site with no load and the boom lowered, passing under a 138 kV line. What minimum clearance does OSHA's Table T require?
- A. 4 feet
- B. 6 feet
- C. 10 feet
- D. 16 feet
Show answer and explanation
Correct answer: C. Table T in 1926.1411 sets travel clearances with no load. Over 50 kV up to 345 kV, the minimum is 10 feet. The employer must also lower the boom enough, account for speed and terrain bouncing the boom, and use a dedicated spotter if any part of the crane will get closer than 20 feet.
Why the other choices don't fit
- A: 4 feet applies to lines up to 0.75 kV.
- B: 6 feet applies to lines over 0.75 kV up to 50 kV.
- D: 16 feet applies to lines over 345 kV up to 750 kV.
Source: OSHA, 29 CFR 1926.1411 Power line safety while traveling with no load, Table T and paragraph (b)
Question 14 of 50
Domain 2: Operations · NCCCO-014
Your load line contacts an energized power line. There's no fire, explosion risk or other emergency forcing you out. What's the safest action for you as the operator?
- A. Have a crew member pull the load away with a tag line
- B. Stay in the cab and warn the crew to keep away from the crane and load
- C. Jump clear of the crane with your feet together
- D. Climb down carefully, keeping a hand on the crane
Show answer and explanation
Correct answer: B. OSHA's required power line training covers this exact case: the danger of touching the equipment and the ground at the same time, the importance of staying inside the cab unless there's an imminent danger of fire, explosion or another emergency, the energized zone around the equipment (step potential), and the need for the crew to avoid approaching or touching the equipment and the load.
Why the other choices don't fit
- A: Crew members must avoid touching the equipment and the load.
- C: Leaving the cab is for an imminent danger such as fire. With no such danger, you stay put.
- D: Touching the crane while stepping onto the ground is the electrocution path OSHA warns about.
Source: OSHA, 29 CFR 1926.1408 Power line safety, equipment operations, paragraph (g)(1)(i)
Question 15 of 50
Domain 3: Technical Knowledge · NCCCO-015
For rotation resistant wire rope, what is OSHA's Category II broken-wire criterion?
- A. Six broken wires in one rope lay
- B. Broken wires over 10 percent of all wires in eight diameters
- C. Three broken wires in one strand in one rope lay
- D. Two random broken wires in six rope diameters, or four in 30 diameters
Show answer and explanation
Correct answer: D. Rotation resistant rope has a tighter limit: two randomly distributed broken wires in six rope diameters, or four randomly distributed broken wires in 30 rope diameters. Core protrusion or other distortion showing core failure in rotation resistant rope is a Category III deficiency.
Why the other choices don't fit
- A: That's part of the running-rope criterion for standard ropes.
- B: That 10 percent rule comes from OSHA's rigging-equipment standard (1926.251) for wire rope used in rigging, not the crane rope criterion.
- C: Also part of the standard running-rope criterion.
Source: OSHA, 29 CFR 1926.1413 Wire rope inspection, paragraphs (a)(2)(ii)(A)(2) and (a)(2)(iii)(A); OSHA, 29 CFR 1926.251 Rigging equipment for material handling, paragraph (c)(4)(iv)
Question 16 of 50
Domain 1: Site · NCCCO-016
While traveling with no load, part of your crane will pass within 20 feet of a power line. Besides keeping the Table T clearance, what does OSHA require?
- A. An insulating link installed on the hook
- B. Nothing more, as long as the boom is fully lowered
- C. A dedicated spotter in continuous contact with the operator
- D. A lift plan signed by a professional engineer
Show answer and explanation
Correct answer: C. When any part of the equipment will get closer than 20 feet to the line while traveling, the employer must use a dedicated spotter who stays in continuous contact with the driver/operator, is positioned to judge the clearance, and gives timely information. At night or in poor visibility, the lines must also be illuminated or otherwise identified and a safe path of travel identified and used.
Why the other choices don't fit
- A: An insulating link is one option for lifting operations near lines (1926.1408). It isn't the travel requirement.
- B: Lowering the boom is required, but the spotter requirement still applies inside 20 feet.
- D: 1926.1411 doesn't call for an engineered lift plan.
Source: OSHA, 29 CFR 1926.1411 Power line safety while traveling with no load, paragraphs (b)(4) and (b)(5)
Question 17 of 50
Domain 2: Operations · NCCCO-017
No one has told you whether an overhead line near your lift is live. How must you treat it?
- A. As dead, if it isn't humming or sparking
- B. As energized, unless the utility confirms it is deenergized and visibly grounded at the site
- C. As energized only if it carries more than 50 kV
- D. As insulated, if it has a covering
Show answer and explanation
Correct answer: B. OSHA requires the employer to assume every power line is energized unless the utility owner/operator confirms that it has been and continues to be deenergized and visibly grounded at the worksite. Lines are also presumed uninsulated unless the utility or a qualified registered engineer confirms otherwise.
Why the other choices don't fit
- A: Sound and sparks prove nothing. The presumption is energized.
- C: The presumption applies at every voltage.
- D: A covering doesn't establish insulation. Lines are presumed uninsulated.
Source: OSHA, 29 CFR 1926.1408 Power line safety, equipment operations, paragraphs (e) and (g)(1)(ii) through (iii)
Question 18 of 50
Domain 3: Technical Knowledge · NCCCO-018
Your hoist rope touched an energized power line but looks undamaged. What has to happen?
- A. Replace the rope; repairing rope that contacted a live line is prohibited
- B. Cut out the contacted section and keep the rest in use
- C. Keep using it if a qualified person sees no visible damage
- D. Inspect it more closely at the next monthly
Show answer and explanation
Correct answer: A. Prior electrical contact with a power line is a Category III deficiency. Operations with that rope stop until it is replaced. OSHA allows cutting out other localized Category III damage, but it specifically excludes power line contact and prohibits repairing a rope that contacted an energized line. The hoist or the whole crane must be tagged out until the rope is replaced.
Why the other choices don't fit
- B: Severing is not allowed for power line contact.
- C: Contact damage may not be visible. The rule requires replacement.
- D: Category III stops use now.
Source: OSHA, 29 CFR 1926.1413 Wire rope inspection, paragraphs (a)(2)(iii)(B), (a)(4)(iii) and (a)(4)(iv)
Question 19 of 50
Domain 1: Site · NCCCO-019
Your crane's counterweight will swing within 2 feet of a building wall where laborers walk. What does OSHA require the employer to do about this swing-radius hazard?
- A. Mark the hazard area with control lines, warning lines, railings or similar barriers
- B. Post a flagger at the wall for every swing
- C. Lock out the swing function for the rest of the shift
- D. Have the operator sound the horn before each swing
Show answer and explanation
Correct answer: A. Where the rotating superstructure could strike someone or pinch them against another object, the employer must train workers to recognize the hazard area and erect and maintain control lines, warning lines, railings or similar barriers marking its boundaries. If barriers are not feasible on the ground or on the crane, the area must be marked with warning signs and high-visibility markings on the equipment.
Why the other choices don't fit
- B: A flagger isn't the measure OSHA specifies.
- C: OSHA doesn't require locking out swing. It requires marking the hazard area.
- D: A horn warning alone doesn't meet the barrier requirement.
Source: OSHA, 29 CFR 1926.1424 Work area control, paragraphs (a)(1) and (a)(2)
Question 20 of 50
Domain 2: Operations · NCCCO-020
The anti-two-block device on your telescopic boom crane (built in 2015) stops working. While it's being repaired, which temporary alternative measure does OSHA specify?
- A. Reduce every chart rating by 25 percent until it's fixed
- B. Turn off the LMI so it can't lock out functions
- C. Mark the hoist cable where you'll have time to stop, and use a spotter when extending the boom
- D. Rely on the boom angle indicator instead
Show answer and explanation
Correct answer: C. For telescopic boom cranes made after February 28, 1992, the temporary alternative is to clearly mark the cable at a point that gives the operator time to stop the hoist before two-blocking, and to use a spotter when extending the boom. The anti-two-block device is a Category I aid, so the repair clock is 7 calendar days, and the operator must report the problem in writing.
Why the other choices don't fit
- A: OSHA lists no percentage reduction as the alternative.
- B: Disabling another aid adds a hazard.
- D: A boom angle indicator is an alternative for a failed boom hoist limiting device, not for anti-two-block.
Source: OSHA, 29 CFR 1926.1416 Operational aids, paragraph (d)(3)(i); OSHA, 29 CFR 1926.1417 Operation, paragraph (j)
Question 21 of 50
Domain 3: Technical Knowledge · NCCCO-021
OSHA lists a wire rope diameter reduction of more than what percent from nominal as a Category II deficiency?
- A. 1%
- B. 3%
- C. 5%
- D. 10%
Show answer and explanation
Correct answer: C. A diameter reduction of more than 5 percent from nominal diameter is a Category II deficiency, listed alongside the broken-wire counts.
Why the other choices don't fit
- A: Lower than OSHA's threshold.
- B: Lower than OSHA's threshold.
- D: Double OSHA's threshold.
Source: OSHA, 29 CFR 1926.1413 Wire rope inspection, paragraph (a)(2)(ii)(B)
Question 22 of 50
Domain 1: Site · NCCCO-022
An oiler needs to step into the swing area behind the cab, out of the operator's view. What must happen before the operator rotates the superstructure again?
- A. The operator waits a few minutes, then swings slowly
- B. The oiler radios once on the way in; nothing more is needed
- C. The signal person gives a swing signal from the far side
- D. The operator is told, by a prearranged system, that the oiler is in a safe position
Show answer and explanation
Correct answer: D. Before going to a hazard-area location out of the operator's view, the worker (or someone they instruct) must make sure the operator knows. Once the operator knows someone went there, the operator must not rotate the superstructure until informed, through a prearranged system of communication, that the worker is in a safe position.
Why the other choices don't fit
- A: Waiting isn't confirmation. The operator needs to be told the worker is clear.
- B: Announcing entry isn't enough. The operator must also be told the worker is in a safe position.
- C: A swing signal without confirmation that the oiler is clear doesn't satisfy the rule.
Source: OSHA, 29 CFR 1926.1424 Work area control, paragraph (a)(3)
Question 23 of 50
Domain 2: Operations · NCCCO-023
A Category I operational aid, such as the boom hoist limiting device, stops working. Leaving aside the parts-on-order exception, how long does OSHA allow for the repair?
- A. 3 calendar days
- B. 7 calendar days
- C. 14 calendar days
- D. 30 calendar days
Show answer and explanation
Correct answer: B. Category I aids must be repaired no later than 7 calendar days after the deficiency occurs. If the employer documents that it ordered parts within 7 days, the repair must be done within 7 days of receiving them. Temporary alternative measures must be used in the meantime.
Why the other choices don't fit
- A: Shorter than OSHA's window.
- C: Not a deadline in 1926.1416.
- D: 30 days is the window for Category II aids, such as the boom angle or radius indicator and load weighing devices.
Source: OSHA, 29 CFR 1926.1416 Operational aids, paragraphs (b), (d) and (e)
Question 24 of 50
Domain 3: Technical Knowledge · NCCCO-024
How much rope must remain on the drum when the load or the boom is at its lowest point?
- A. Half a wrap
- B. 1 full wrap
- C. 2 full wraps
- D. 5 full wraps
Show answer and explanation
Correct answer: C. Neither the load nor the boom may be lowered below the point where fewer than two full wraps of rope remain on their drums. The same two-wrap minimum applies when a damaged rope is shortened by cutting out the bad section.
Why the other choices don't fit
- A: Below OSHA's minimum.
- B: Below OSHA's minimum.
- D: More than OSHA requires.
Source: OSHA, 29 CFR 1926.1417 Operation, paragraph (t); OSHA, 29 CFR 1926.1413 Wire rope inspection, paragraph (a)(4)(i)(B)
Question 25 of 50
Domain 1: Site · NCCCO-025
Two cranes on the same project have overlapping working radii. Under OSHA, who must set up a system to coordinate their operations?
- A. Nobody; the larger crane has the right of way
- B. The local OSHA area office
- C. Each operator, deciding independently by radio
- D. The controlling entity, or the employer(s) running the cranes if there isn't one
Show answer and explanation
Correct answer: D. Where any part of one crane is within the working radius of another, the controlling entity must institute a system to coordinate operations. If there is no controlling entity, the employer (or employers) operating the cranes must set it up.
Why the other choices don't fit
- A: There's no right-of-way rule. A coordination system is required.
- B: OSHA enforces the rule but doesn't run job-site coordination.
- C: Independent decisions are the opposite of a coordinated system.
Source: OSHA, 29 CFR 1926.1424 Work area control, paragraph (b)
Question 26 of 50
Domain 2: Operations · NCCCO-026
What is the difference between a load moment indicator and a load moment limiter?
- A. At rated capacity, the limiter cuts power to functions that increase loading
- B. Only the limiter senses load multiplied by radius
- C. The limiter lets you exceed the chart for a short time
- D. The indicator is required only on lattice boom cranes
Show answer and explanation
Correct answer: A. Both sense the overturning moment (load times radius) and compare it with rated capacity. The indicator shows the percentage of capacity and may warn with lights or alarms. The limiter, once rated capacity is reached, shuts off functions that make loading worse, such as hoisting, telescoping out or luffing out, while functions that reduce loading usually keep working.
Why the other choices don't fit
- B: Both devices sense the overturning moment.
- C: No device permits exceeding rated capacity.
- D: That isn't how OSHA defines or requires them.
Source: OSHA, 29 CFR 1926.1401 Definitions, "Load moment (or rated capacity) indicator" and "limiter"; OSHA, 29 CFR 1926.1417 Operation, paragraph (o)(1)
Question 27 of 50
Domain 3: Technical Knowledge · NCCCO-027
When you form an eye with U-bolt wire rope clips, which part of each clip goes against the dead (short) end of the rope?
- A. The U-bolt (the U section)
- B. The saddle
- C. Either part, if the nuts are torqued
- D. Alternate clips, one each way
Show answer and explanation
Correct answer: A. OSHA's rigging standard says the U-bolt must be applied so the U section is in contact with the dead end of the rope. The saddle goes on the live, load-bearing end. When clips are used with a wedge socket, they go on the unloaded dead end only. Eyes in wire rope slings and bridles may not be formed with clips at all.
Why the other choices don't fit
- B: The saddle belongs on the live end.
- C: Orientation matters regardless of torque.
- D: Alternating clips puts some U-bolts on the live end, which the rule forbids.
Source: OSHA, 29 CFR 1926.251 Rigging equipment for material handling, paragraphs (c)(4)(iii) and (c)(5)(i); OSHA, 29 CFR 1926.1414 Wire rope selection and installation, paragraph (f)
Question 28 of 50
Domain 1: Site · NCCCO-028
At setup you find that the ground where one outrigger has to go is soft and wet. Under 1926.1402, what should happen?
- A. Short-jack that outrigger and use the full-extension chart
- B. Set up anyway and let the LMI stop any overload
- C. Lift only loads under half the chart rating
- D. Your employer discusses the needed ground preparation with the controlling entity
Show answer and explanation
Correct answer: D. Cranes may not be assembled or used unless the ground is firm, drained and graded enough that, with supporting materials if needed, the manufacturer's support and level specifications are met. If the operator or A/D director finds the ground doesn't meet that, their employer must discuss the needed ground preparations with the controlling entity.
Why the other choices don't fit
- A: Ratings only apply to the configuration actually set up. Using full-extension ratings on a short-jacked outrigger is a chart error.
- B: An LMI senses load moment. It can't detect ground giving way, and OSHA says safety devices and operational aids don't replace the operator's judgment.
- C: OSHA has no half-capacity rule for poor ground. The ground has to be made adequate.
Source: OSHA, 29 CFR 1926.1402 Ground conditions, paragraphs (b) and (e); OSHA, 29 CFR 1926.1417 Operation, paragraph (k)
Question 29 of 50
Domain 2: Operations · NCCCO-029
A load has to stay suspended longer than a normal lift while a crew finishes anchor bolts. When may the operator leave the controls?
- A. Only with the operator next to the crane, crane functions restrained and the fall zone barricaded and empty
- B. Whenever a signal person is watching the load
- C. Whenever the brakes are set, for a short break
- D. For up to 15 minutes at a time
Show answer and explanation
Correct answer: A. The operator may not leave the controls with a suspended load unless all of these are met: the operator stays adjacent to the equipment with no other duties, the load is being held longer than normal lifting operations, a competent person determines it's safe and restrains the boom hoist, telescoping, load, swing and outrigger functions, and barricades or caution lines keep everyone out of the fall zone.
Why the other choices don't fit
- B: A signal person isn't one of the conditions.
- C: Setting brakes alone doesn't meet the rule.
- D: OSHA sets no time allowance.
Source: OSHA, 29 CFR 1926.1417 Operation, paragraph (e)(1)
Question 30 of 50
Domain 3: Technical Knowledge · NCCCO-030
Using OSHA's Table H-2, how many drop-forged U-bolt clips does an eye in 3/4-inch improved plow steel rope need?
- A. 2
- B. 3
- C. 4
- D. 6
Show answer and explanation
Correct answer: C. Table H-2 calls for 4 drop-forged clips on 3/4-inch rope (5 if the clips are another material), spaced at least 4 1/2 inches apart.
Why the other choices don't fit
- A: Fewer than any size in the table.
- B: 3 is the count for 1/2-inch and 5/8-inch rope.
- D: 6 is the count for 1 1/8-inch and 1 1/4-inch rope.
Source: OSHA, 29 CFR 1926.251 Rigging equipment for material handling, Table H-2
Question 31 of 50
Domain 1: Site · NCCCO-031
During assembly near a power line, the A/D director decides tag lines are needed to control a boom section. What does OSHA require of those tag lines?
- A. They must be at least 50 feet long
- B. They're banned anywhere within 20 feet of a line
- C. They must be steel cable so they can't break
- D. They must be nonconductive
Show answer and explanation
Correct answer: D. When encroachment precautions apply near power lines, any tag lines used must be nonconductive. That rule appears for assembly/disassembly (1926.1407) and for operations (1926.1408), along with a planning meeting and at least one more measure such as a dedicated spotter or proximity alarm.
Why the other choices don't fit
- A: OSHA sets no tag line length here.
- B: Tag lines aren't banned. They must be nonconductive.
- C: Steel cable conducts electricity, which is exactly what the rule prevents.
Source: OSHA, 29 CFR 1926.1407 Power line safety, assembly and disassembly, paragraph (b)(1) through (b)(3); OSHA, 29 CFR 1926.1408 Power line safety, equipment operations, paragraph (b)(2)
Question 32 of 50
Domain 2: Operations · NCCCO-032
You'll hoist a suspended personnel platform. At the planned radius and configuration, the crane's rated capacity is 12,000 lb. Outside of proof testing, what is the most the total load (loaded platform, hook, load line and rigging) may weigh?
- A. 3,000 lb
- B. 6,000 lb
- C. 9,000 lb
- D. 12,000 lb
Show answer and explanation
Correct answer: B. For a suspended personnel platform, the total load must not exceed 50 percent of the rated capacity for the radius and configuration: 50% of 12,000 lb is 6,000 lb. The platform and rigging are proof tested to 125 percent of the platform's rated capacity at each jobsite, and the crane must be level within 1 percent of level grade for personnel hoisting.
Why the other choices don't fit
- A: That's 25 percent, stricter than the rule.
- C: That's 75 percent.
- D: That's the full rating, which personnel hoisting never allows.
Source: OSHA, 29 CFR 1926.1431 Hoisting personnel, paragraphs (c)(1), (d)(1) and (j)(1); CCO, Mobile Crane Operator Candidate Handbook (MCO CH rev. 01/25), Core outline, Domain 2, item 8b
Question 33 of 50
Domain 3: Technical Knowledge · NCCCO-033
The built-in horn on your crane quits during the shift. What does OSHA require?
- A. Have someone blow a whistle instead
- B. Finish the shift and report it in writing
- C. Use hand signals as a temporary alternative
- D. Safely stop; the crane is out of service until the horn works again
Show answer and explanation
Correct answer: D. The horn is a required safety device under 1926.1415, along with the crane level indicator, boom stops (except hydraulic booms), jib stops, foot pedal brake locks and integral holding valves on hydraulic outrigger jacks. If a safety device stops working during operations, the operator must safely stop, and the equipment stays out of service until it works again. Unlike operational aids, alternative measures aren't permitted.
Why the other choices don't fit
- A: Alternative measures are expressly not permitted for safety devices.
- B: Operations can't continue with a failed safety device.
- C: Temporary alternatives exist for operational aids, not safety devices.
Source: OSHA, 29 CFR 1926.1415 Safety devices, paragraphs (a)(7) and (b)
Question 34 of 50
Domain 2: Operations · NCCCO-034
A load is suspended and not moving while a connector waits to guide it into place. A laborer with no role in the lift wants to walk under it to save time. Is that allowed?
- A. No; only those hooking, unhooking, guiding or connecting the load may be in the fall zone
- B. Yes, if the operator keeps hands on the controls
- C. Yes, if the load weighs under 1,000 lb
- D. Yes, if they wear a hard hat
Show answer and explanation
Correct answer: A. While the operator isn't moving a suspended load, no employee may be in the fall zone except those hooking, unhooking or guiding the load, making the initial attachment to a component or structure, or operating a concrete hopper or bucket. The fall zone is the area, including but not limited to directly beneath the load, where suspended materials could foreseeably fall.
Why the other choices don't fit
- B: The operator's attention doesn't make the fall zone safe for bystanders.
- C: OSHA sets no weight threshold for the fall zone.
- D: PPE doesn't create an exception.
Source: OSHA, 29 CFR 1926.1425 Keeping clear of the load, paragraph (b); OSHA, 29 CFR 1926.1401 Definitions, "Fall zone"
Question 35 of 50
Domain 3: Technical Knowledge · NCCCO-035
What does "two-blocking" mean?
- A. Two cranes sharing one load
- B. Blocking placed under only two of the outriggers
- C. Two layers of rope spooled on the drum
- D. The hook block or overhaul ball contacting the boom tip or upper block
Show answer and explanation
Correct answer: D. Two-blocking is when the uppermost component on the hoist line (load block, hook block, overhaul ball or similar) contacts the boom tip, fixed upper block or similar part. That binds the system, and continuing to apply power can break the hoist rope or another component. Anti-two-block devices exist to prevent it.
Why the other choices don't fit
- A: That's a multiple-crane lift.
- B: Not a crane term for this.
- C: Rope layering is about spooling, not two-blocking.
Source: OSHA, 29 CFR 1926.1401 Definitions, "Two blocking"; OSHA, 29 CFR 1926.1416 Operational aids, paragraph (d)(3)
Question 36 of 50
Domain 2: Operations · NCCCO-036
During a lift, the load slips off a support and drops a short distance before the line catches it, a shock load that may have exceeded rated capacity. What does OSHA require next?
- A. Cut the crane's ratings by 10 percent for the rest of the day
- B. Keep working if the LMI didn't alarm
- C. Stop using the crane until a qualified person inspects it for structural damage
- D. Note it for the next annual inspection
Show answer and explanation
Correct answer: C. OSHA treats this as severe service. When loading or shock loading may have exceeded rated capacity, the employer must stop using the equipment, and a qualified person must inspect it for structural damage to decide whether it can continue to be used safely, inspect any annual-inspection items the conditions call for, and handle deficiencies under the annual inspection rules.
Why the other choices don't fit
- A: There's no derating shortcut in place of the inspection.
- B: A shock load can damage a crane without tripping an alarm. The rule requires stopping.
- D: Waiting for the annual inspection is exactly what the severe-service rule prevents.
Source: OSHA, 29 CFR 1926.1412 Inspections, paragraph (g); CCO, Mobile Crane Operator Candidate Handbook (MCO CH rev. 01/25), Core outline, Domain 2, item 16
Question 37 of 50
Domain 3: Technical Knowledge · NCCCO-037
During assembly or disassembly of a mobile crane, above what height on an unprotected side or edge must the employer provide and ensure the use of fall protection?
- A. 4 feet
- B. 6 feet
- C. 10 feet
- D. 15 feet
Show answer and explanation
Correct answer: D. For assembly/disassembly work, fall protection is required when an employee is on a walking/working surface with an unprotected side or edge more than 15 feet above a lower level (except at or near draw-works while running, in the cab or on the deck). For other work, the threshold is 6 feet when moving point-to-point on non-lattice booms or on non-horizontal lattice booms, and at any work station on the equipment.
Why the other choices don't fit
- A: Not an OSHA crane fall protection threshold.
- B: 6 feet is the threshold for non-assembly work.
- C: Not an OSHA crane fall protection threshold.
Source: OSHA, 29 CFR 1926.1423 Fall protection, paragraphs (e) and (f)
Practice load chart
Use this chart for Questions 38 to 50. It is fictional. We made it up for practice, and it doesn't describe any real crane. Never use it for an actual lift. Its layout and notes follow the way real manufacturer charts work, such as the Manitowoc (Grove) RT640C chart. On the real Core exam you'll work without a calculator, so try to do the math here by hand.
Castleport practice crane: telescopic boom, on outriggers fully extended, 360° rotation, full counterweight. Rated loads in pounds.
| Radius (ft) | 40 ft boom | 60 ft boom | 80 ft boom | 100 ft boom |
|---|---|---|---|---|
| 10 | 60,000* | 52,000* | — | — |
| 15 | 48,000* | 44,000* | 38,000* | — |
| 20 | 38,000* | 36,000* | 32,000* | 26,000* |
| 25 | 30,000 | 29,000 | 27,000 | 22,000 |
| 30 | 24,000 | 23,500 | 22,000 | 19,000 |
| 35 | 19,500 | 19,000 | 18,000 | 16,000 |
| 40 | — | 15,500 | 15,000 | 13,500 |
| 50 | — | 10,500 | 10,000 | 9,500 |
| 60 | — | — | 7,000 | 6,800 |
| 70 | — | — | 5,000 | 4,900 |
| 80 | — | — | — | 3,600 |
Parts of line (permissible line pull 7,000 lb per part)
| Parts of line | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 |
|---|---|---|---|---|---|---|---|---|---|
| Maximum total load (lb) | 7,000 | 14,000 | 21,000 | 28,000 | 35,000 | 42,000 | 49,000 | 56,000 | 63,000 |
Chart notes
- Ratings apply only to the configuration in the chart title: outriggers fully extended, full counterweight, crane level on a firm surface.
- Rated loads include the weight of the hook block, slings, shackles and other lifting devices. Subtract those weights from the rating to get the net load you can lift.
- If the boom extension is stowed on the boom, deduct 1,200 lb from main boom ratings.
- When the boom length or the radius (or both) falls between listed values, use the smallest rating at the next larger radius and the next longer or next shorter boom length. Don't interpolate.
- Don't operate at a radius or boom length where no rating is listed (—). The crane may tip over with no load on the hook.
- Ratings marked * are limited by structural strength. Don't rely on tipping as a warning in that zone.
- Operating radius is the horizontal distance from the axis of rotation to the center of the vertical hoist line, with the load applied.
- Line pull is 7,000 lb per part of line. The total suspended load (load, hook block and rigging) may not exceed the parts-of-line limit or the chart rating, whichever is lower.
- Hook block: 900 lb. Overhaul ball: 400 lb.
Part 2: Load charts
Question 38 of 50
Domain 4: Load Charts · NCCCO-038
On a mobile crane load chart, how is operating radius measured?
- A. From the operator's cab to the load's center of gravity
- B. From the front outrigger to the center of the load
- C. Along the boom, from the foot pin to the boom tip
- D. Horizontally from the axis of rotation to the center of the hoist line, load applied
Show answer and explanation
Correct answer: D. Manufacturer charts define operating radius as the horizontal distance from the axis of rotation to the center of the vertical hoist line with the load applied. Because the boom deflects under load, radius grows once the load comes off the ground. That's why charts tell you the boom angle before loading should be greater than the loaded boom angle.
Why the other choices don't fit
- A: Radius goes to the hoist line, not from the cab.
- B: Radius is measured from the axis of rotation, not an outrigger.
- C: That's boom length, not radius.
Source: Manitowoc (Grove) RT640C Load Chart, Notes for Lifting Capacities (a real manufacturer chart, shown as an example), Definitions 1 and 2; Operation note 14; Castleport practice load chart (fictional), above Question 38, note 7
Question 39 of 50
Domain 4: Load Charts · NCCCO-039
Use the practice chart: 60 ft of boom at a 30 ft radius. The hook block weighs 900 lb, slings and shackles weigh 350 lb, the boom extension is stowed on the boom, and the crane is reeved with 4 parts of line. What is the heaviest load you can hang below the rigging?
- A. 21,050 lb
- B. 22,250 lb
- C. 22,600 lb
- D. 23,500 lb
Show answer and explanation
Correct answer: A. The chart rating at 60 ft and 30 ft is 23,500 lb. Ratings include the hook block, rigging and stowed extension, so subtract them all: 23,500 − 900 − 350 − 1,200 (stowed extension, note 3) = 21,050 lb. That's net capacity. Four parts of line allow 28,000 lb, so reeving doesn't limit this lift.
Why the other choices don't fit
- B: This subtracts the block and rigging but forgets the 1,200 lb stowed-extension deduction.
- C: This subtracts only the hook block.
- D: This is the gross chart rating with no deductions.
Source: Castleport practice load chart (fictional), above Question 38, main chart and notes 2 and 3; Manitowoc (Grove) RT640C Load Chart, Notes for Lifting Capacities (a real manufacturer chart, shown as an example), Operation note 3 and "Weight reductions for load handling devices"; OSHA, Appendix C to Subpart CC, Operator Certification: Written Examination Technical Knowledge Criteria, paragraphs (a)(13) and (d)(3)(iv)
Question 40 of 50
Domain 4: Load Charts · NCCCO-040
Use the practice chart: 60 ft of boom, and the load will be at a 27 ft radius. Which rating do you use?
- A. 19,000 lb
- B. 23,500 lb
- C. 26,250 lb
- D. 29,000 lb
Show answer and explanation
Correct answer: B. 27 ft falls between the listed 25 ft and 30 ft radii. Note 4 says to use the smallest rating at the next larger radius, so you read the 30 ft row: 23,500 lb. Never interpolate between rows.
Why the other choices don't fit
- A: That's the 35 ft row, two rows too far.
- C: That's an interpolated value, which the chart notes forbid.
- D: That's the 25 ft row, the next smaller radius, which overstates capacity.
Source: Castleport practice load chart (fictional), above Question 38, main chart and note 4; Manitowoc (Grove) RT640C Load Chart, Notes for Lifting Capacities (a real manufacturer chart, shown as an example), Operation note 9
Question 41 of 50
Domain 4: Load Charts · NCCCO-041
Use the practice chart: the boom is telescoped to 70 ft and the radius is exactly 35 ft. Which rating applies?
- A. 16,000 lb
- B. 18,000 lb
- C. 18,500 lb
- D. 19,000 lb
Show answer and explanation
Correct answer: B. 70 ft falls between the 60 ft and 80 ft columns. Note 4 says to use the smallest rating for the next longer or next shorter boom length. At 35 ft those are 19,000 lb (60 ft) and 18,000 lb (80 ft), so the rating is 18,000 lb.
Why the other choices don't fit
- A: That's the 100 ft column, which doesn't bracket a 70 ft boom.
- C: That's an interpolated value.
- D: That's the larger of the two bracketing ratings.
Source: Castleport practice load chart (fictional), above Question 38, main chart and note 4; Manitowoc (Grove) RT640C Load Chart, Notes for Lifting Capacities (a real manufacturer chart, shown as an example), Operation note 9
Question 42 of 50
Domain 4: Load Charts · NCCCO-042
Use the practice chart: 70 ft of boom at a 42 ft radius. Which rating applies?
- A. 10,000 lb
- B. 10,500 lb
- C. 12,750 lb
- D. 15,000 lb
Show answer and explanation
Correct answer: A. Both values fall between listed ones. Move to the next larger radius, 50 ft, and compare the bracketing boom lengths: 60 ft gives 10,500 lb and 80 ft gives 10,000 lb. The smallest is 10,000 lb.
Why the other choices don't fit
- B: Correct row, but the larger of the two boom-length ratings.
- C: An interpolated value.
- D: The 40 ft row, the next smaller radius.
Source: Castleport practice load chart (fictional), above Question 38, main chart and note 4; Manitowoc (Grove) RT640C Load Chart, Notes for Lifting Capacities (a real manufacturer chart, shown as an example), Operation note 9
Question 43 of 50
Domain 4: Load Charts · NCCCO-043
Use the practice chart's reeving rule (7,000 lb per part of line). The total suspended weight, counting the load, hook block and rigging, is 30,000 lb. What is the fewest parts of line you can reeve?
- A. 3 parts
- B. 4 parts
- C. 5 parts
- D. 6 parts
Show answer and explanation
Correct answer: C. Divide the total by the line pull per part: 30,000 ÷ 7,000 is about 4.3, and you can't reeve a fraction of a part, so round up to 5 parts (5 × 7,000 = 35,000 lb). Four parts give only 28,000 lb.
Why the other choices don't fit
- A: 3 parts give 21,000 lb.
- B: 4 parts give 28,000 lb, which is less than 30,000.
- D: 6 parts would work but aren't the fewest.
Source: Castleport practice load chart (fictional), above Question 38, note 8 and parts-of-line table; OSHA, Appendix C to Subpart CC, Operator Certification: Written Examination Technical Knowledge Criteria, paragraphs (a)(2)(ii) and (iii) and (d)(3)(vii)
Question 44 of 50
Domain 4: Load Charts · NCCCO-044
Use the practice chart: 40 ft of boom at a 20 ft radius, no boom extension on the crane, reeved with 3 parts of line. The hook block weighs 900 lb and the rigging 300 lb. What is the heaviest load you can lift?
- A. 19,800 lb
- B. 21,000 lb
- C. 36,800 lb
- D. 38,000 lb
Show answer and explanation
Correct answer: A. Two limits apply, and the lower one controls. The chart allows 38,000 lb at 40 ft and 20 ft, but 3 parts of line allow only 21,000 lb total (3 × 7,000). Reeving is the limit, so subtract the block and rigging from it: 21,000 − 900 − 300 = 19,800 lb.
Why the other choices don't fit
- B: The reeving limit before deducting block and rigging.
- C: The chart rating minus block and rigging, ignoring the reeving limit.
- D: The gross chart rating, ignoring reeving and deductions.
Source: Castleport practice load chart (fictional), above Question 38, main chart, notes 2 and 8; Manitowoc (Grove) RT640C Load Chart, Notes for Lifting Capacities (a real manufacturer chart, shown as an example), "Line pulls and reeving information"; OSHA, Appendix C to Subpart CC, Operator Certification: Written Examination Technical Knowledge Criteria, paragraph (a)(2)(iii)
Question 45 of 50
Domain 4: Load Charts · NCCCO-045
On a load chart, a rating sits above the bold line (marked with an asterisk on the practice chart). What does that tell you?
- A. The rating applies only with the boom fully retracted
- B. It's limited by structural strength, so don't rely on tipping as a warning
- C. The crane will tip before anything breaks at that rating
- D. You may exceed it by 10 percent with an LMI
Show answer and explanation
Correct answer: B. Manufacturer charts state that capacities above the bold line are based on structural strength and that tipping should not be relied upon as a capacity limitation. In that zone, a boom or other component can fail before the crane shows any sign of tipping. Ratings below the line are limited by stability.
Why the other choices don't fit
- A: Unrelated. Some charts have separate fully-retracted columns.
- C: The opposite: in the structural zone, failure can come before tipping.
- D: No rating may be exceeded.
Source: Manitowoc (Grove) RT640C Load Chart, Notes for Lifting Capacities (a real manufacturer chart, shown as an example), Operation note 15; Castleport practice load chart (fictional), above Question 38, note 6; OSHA, Appendix C to Subpart CC, Operator Certification: Written Examination Technical Knowledge Criteria, paragraph (d)(3)(iii)
Question 46 of 50
Domain 4: Load Charts · NCCCO-046
Your chart shows no rating at all for 40 ft of boom at a 40 ft radius (a dash where the number would be). What does that mean?
- A. Use the 60 ft boom value for that radius
- B. Don't operate in that position; the crane may tip even with no load
- C. You may lift up to the next listed value
- D. Lift only half of the nearest rating
Show answer and explanation
Correct answer: B. Charts warn not to operate at a radius or boom length where no capacity is listed, because the machine may overturn without any load on the hook. A dash or blank cell is not a zero and not a gap to fill in.
Why the other choices don't fit
- A: Using another column's value for an unlisted position isn't allowed.
- C: There's no value to work from in that position.
- D: No chart rule creates a half rating.
Source: Manitowoc (Grove) RT640C Load Chart, Notes for Lifting Capacities (a real manufacturer chart, shown as an example), Operation note 7; Castleport practice load chart (fictional), above Question 38, note 5
Question 47 of 50
Domain 4: Load Charts · NCCCO-047
Use the practice chart: 80 ft of boom, no boom extension. You must place a 15,000 lb load with a 900 lb hook block and 100 lb of rigging. What is the largest listed radius where you can make this lift?
- A. 25 ft
- B. 30 ft
- C. 35 ft
- D. 40 ft
Show answer and explanation
Correct answer: C. The chart rating has to cover the whole suspended weight: 15,000 + 900 + 100 = 16,000 lb. On the 80 ft column, 35 ft is rated 18,000 lb (enough) and 40 ft is rated 15,000 lb (not enough). The largest listed radius that works is 35 ft.
Why the other choices don't fit
- A: Works, but it isn't the largest radius.
- B: Works, but it isn't the largest radius.
- D: 15,000 lb at 40 ft is less than the 16,000 lb suspended.
Source: Castleport practice load chart (fictional), above Question 38, main chart and note 2; CCO, Mobile Crane Operator Candidate Handbook (MCO CH rev. 01/25), Specialty outline, Domain 4, item 2a
Question 48 of 50
Domain 4: Load Charts · NCCCO-048
Three steel beams, each 30 ft long and weighing 50 lb per foot, will be lifted together. With no calculator, what do the beams weigh?
- A. 1,500 lb
- B. 3,000 lb
- C. 4,500 lb
- D. 6,000 lb
Show answer and explanation
Correct answer: C. One beam is 30 ft × 50 lb/ft = 1,500 lb. Three beams weigh 3 × 1,500 = 4,500 lb, before you add the block and rigging. OSHA names calculating a steel beam's weight from measured dimensions and a known per-foot weight as an accepted way to verify load weight.
Why the other choices don't fit
- A: The weight of one beam.
- B: The weight of two beams.
- D: Uses 40 ft instead of 30 ft.
Source: OSHA, 29 CFR 1926.1417 Operation, paragraph (o)(3)(i); CCO, Mobile Crane Operator Candidate Handbook (MCO CH rev. 01/25), Core outline, Domain 4, item 2
Question 49 of 50
Domain 4: Load Charts · NCCCO-049
An obstruction keeps one outrigger from extending fully, so you set it at the manufacturer's mid-extension position. Which ratings can you use?
- A. The full-extension chart, since three outriggers are full
- B. The on-rubber chart, whatever the outrigger position
- C. The full-extension chart minus 10 percent
- D. The manufacturer's chart for the configuration actually set
Show answer and explanation
Correct answer: D. Ratings are only valid for the configuration the chart describes. Use the manufacturer's chart for the outrigger position actually set; never the full-extension chart. Manufacturer charts tie mid-extension ratings to specific conditions, such as engaging the outrigger beam pins. OSHA's written-exam criteria include making sure the load chart matches the equipment's configuration.
Why the other choices don't fit
- A: One short outrigger changes the configuration, so full-extension ratings no longer apply.
- B: On-rubber ratings are for lifting on tires, and only where the manufacturer allows it.
- C: No chart rule makes up a percentage reduction.
Source: OSHA, Appendix C to Subpart CC, Operator Certification: Written Examination Technical Knowledge Criteria, paragraph (d)(2) and (d)(3)(ii); Manitowoc (Grove) RT640C Load Chart, Notes for Lifting Capacities (a real manufacturer chart, shown as an example), Operation note 17; OSHA, 29 CFR 1926.1417 Operation, paragraph (a)
Question 50 of 50
Domain 4: Load Charts · NCCCO-050
Use the practice chart: 60 ft of boom, and the lift will go out to 50 ft, the longest radius in the lift. You don't know the load's weight and plan to check it with the load weighing device as you start hoisting. Above what reading must you stop and verify the weight another way?
- A. 5,250 lb
- B. 7,875 lb
- C. 8,400 lb
- D. 10,500 lb
Show answer and explanation
Correct answer: B. When an operator uses a load weighing device or LMI to check an unknown weight, OSHA says to stop and verify the weight another way if it exceeds 75 percent of the maximum rated capacity at the longest radius of the lift. The rating at 60 ft and 50 ft is 10,500 lb, and 75 percent of that is 7,875 lb.
Why the other choices don't fit
- A: That's 50 percent.
- C: That's 80 percent.
- D: That's 100 percent of the rating.
Source: OSHA, 29 CFR 1926.1417 Operation, paragraph (o)(3)(ii); Castleport practice load chart (fictional), above Question 38, main chart
This free NCCCO practice test has 50 original, unofficial questions across the four domains of the CCO Mobile Crane Operator Core written exam (NCCCO now certifies under the name CCO). It isn't a full-length exam. Questions 1 to 37 cover site, operations and technical knowledge, and Questions 38 to 50 use the practice load chart printed just above them.
Score yourself by domain
Count your correct answers in each row. CCO publishes two slightly different sets of Core weights: the Mobile Crane Operator Candidate Handbook (MCO CH rev. 01/25) and the CCO Mobile Crane Operator page. We show both and weighted this set between them.
| Core domain | Handbook weight | CCO web page weight | Questions in this set | Question numbers |
|---|---|---|---|---|
| 1. Site | 22% | 20% | 11 | 1, 4, 7, 10, 13, 16, 19, 22, 25, 28, 31 |
| 2. Operations | 28% | 26% | 13 | 2, 5, 8, 11, 14, 17, 20, 23, 26, 29, 32, 34, 36 |
| 3. Technical Knowledge | 23% | 28% | 13 | 3, 6, 9, 12, 15, 18, 21, 24, 27, 30, 33, 35, 37 |
| 4. Load Charts | 27% | 26% | 13 | 38, 39, 40, 41, 42, 43, 44, 45, 46, 47, 48, 49, 50 |
| Total | 100% | 100% | 50 |
Your score here covers these 50 items only. It isn't a CCO score and doesn't predict a pass. The candidate handbook doesn't list a passing percentage, so be careful with any site that quotes one. With 11 to 13 items per domain, treat a weak row as a topic to review, not a measurement.
Load charts carry about a quarter of the Core exam under either set of weights, and the Specialty exams lean on them even harder (35% of each Specialty exam, per CCO's web page). If you missed more than three of Questions 38 to 50, rework that section before anything else.
What the CCO Mobile Crane Core exam looks like
| Detail | Current rule | Source |
|---|---|---|
| Who runs it | CCO (formerly NCCCO, the National Commission for the Certification of Crane Operators). nccco.org now redirects to ccocert.org | CCO Mobile Crane Operator page |
| Core written exam | 95 multiple-choice questions, 90 minutes, calculator not permitted | Candidate Handbook, Core outline |
| Specialty written exam | 28 questions, 60 minutes, calculator permitted. One for each designation: Lattice Boom (LAT), Telescopic Boom Swing Cab (TLL), Telescopic Boom Fixed Cab (TSS) | Handbook, Specialty outline and Certification Options |
| Practical exam | Hands-on exam for each designation, given by a CCO-credentialed Practical Proctor | Handbook; CCO Mobile Crane Operator page |
| Fees | Core $140; each Specialty $80; practical $70 (the proctor may charge separate fees to give it) | CCO Mobile Crane Operator page |
| Ways to take the written exam | Online proctored (OPT), at an approved CCO site (EOT) or at a third-party test center (TCT) | CCO Testing Overview |
| Eligibility | At least 18; comply with the Substance Abuse Policy and Code of Ethics; pass the written and practical exams | Handbook, Eligibility |
| Time limit to finish | 12 months after you pass your first exam to pass the corresponding exams for that designation, in either order | Handbook, Certification Time Frames; CCO Mobile Crane Operator page |
| Results | Preliminary written result on screen right after the exam; a strength-and-weakness report if you don't pass | CCO Candidate FAQ |
| Certification issued | Within 10 business days after you complete all requirements | CCO Candidate FAQ |
| Retakes | Allowed after you meet the retest requirements and pay the fee (see CCO's Exam Retake Policy) | CCO Candidate FAQ; CCO Policies |
| Testing accommodations | Apply at least four weeks before your test date | CCO Candidate FAQ |
| Valid for | 5 years. Recertify within the 12 months before expiration; 1,000 hours of crane-related experience during your certification period waives the recertification practical. No grace period | Handbook, Recertification Requirements |
The Core pace works out to just under a minute per question (90 minutes for 95 questions). To practice at that pace, give yourself about 47 minutes for these 50.
What you can and can't have in the room
CCO's candidate attestation lists items not allowed during the exam, including scratch paper, phones, watches and calculators. A dry-erase board is allowed if it's no larger than 8.5 by 11 inches and is clear when each exam's first question appears (CCO Policies, candidate attestation). Read the instructions for your own testing mode before exam day, since your OPT, EOT or TCT setup will have its own steps.
The references CCO uses for the written exam
CCO's handbook lists the references its committee uses to check Core and Specialty items: ASME B30.5, ASME B30.30, the IHSA Mobile Crane Manual, the AEM Mobile Crane Safety Manual, OSHA 29 CFR 1926 Subpart CC, OSHA 29 CFR 1910.180 and IPT's Crane and Rigging Handbook (Candidate Handbook, reference list; CCO Exam Reference Materials page). Only the OSHA standards are free to read online, which is why most explanations on this page cite them. ASME B30.5 often carries the same or stricter requirements, and CCO checks its items against it.
Numbers that show up in these questions
These values come from the OSHA sections cited in the explanations. On a real job, the crane manufacturer's procedures and load charts, your employer's lift plan and any stricter state rule also apply.
| Topic | Value | Source |
|---|---|---|
| Table A clearances (operations) | Up to 50 kV: 10 ft. Over 50 to 200 kV: 15 ft. Over 200 to 350 kV: 20 ft. Over 350 to 500 kV: 25 ft. Over 500 to 750 kV: 35 ft. Over 750 to 1,000 kV: 45 ft | 1926.1408, Table A |
| Table T clearances (traveling, no load) | Up to 0.75 kV: 4 ft. Over 0.75 to 50 kV: 6 ft. Over 50 to 345 kV: 10 ft. Over 345 to 750 kV: 16 ft. Over 750 to 1,000 kV: 20 ft | 1926.1411, Table T |
| Power line trigger distance | 20 ft for lines up to 350 kV; 50 ft for lines over 350 kV up to 1,000 kV | 1926.1407(a); 1926.1409 |
| Running wire rope, Category II | 6 random broken wires in one lay, or 3 in one strand in one lay | 1926.1413(a)(2)(ii) |
| Rotation resistant rope, Category II | 2 random broken wires in 6 rope diameters, or 4 in 30 diameters | 1926.1413(a)(2)(ii) |
| Rope diameter reduction, Category II | More than 5% below nominal | 1926.1413(a)(2)(ii)(B) |
| Operational aid repair windows | Category I: 7 calendar days. Category II: 30 calendar days | 1926.1416(d) and (e) |
| Inspection record retention | Monthly: 3 months. Annual/comprehensive: 12 months | 1926.1412(e)(3) and (f)(7) |
| Idle equipment | 3 months or more idle: qualified person inspects to monthly requirements before use | 1926.1412(h) |
| Rope left on drum | At least 2 full wraps | 1926.1417(t) |
| Brake test | Each time a load is 90% or more of maximum line pull | 1926.1417(s) |
| Unknown load weight check | Stop and verify if over 75% of the rating at the longest radius of the lift | 1926.1417(o)(3)(ii) |
| Personnel platform | Total load no more than 50% of rated capacity; proof test to 125% of platform capacity; crane level within 1%; qualified person decides on lifting if wind exceeds 20 mph at the platform | 1926.1431(c)(1), (d)(1), (j)(1) and (k)(8)(i) |
| Fall protection | Assembly/disassembly: over 15 ft. Other work: over 6 ft, as listed in the rule | 1926.1423(e) and (f) |
| U-bolt clips, 3/4-in. rope | 4 drop-forged clips, at least 4 1/2 in. apart | 1926.251, Table H-2 |
| Certified operator | Certification by an accredited testing organization is valid for 5 years | 1926.1427(d) |
How to get the most out of this set
- Answer all 50 before opening any explanation, and mark how sure you were on each one.
- Do Questions 38 to 50 with a pencil and the chart only. The Core exam doesn't permit a calculator, so practice the subtraction and multiplication by hand.
- Score by domain with the table above.
- Read every explanation, including the ones you got right. For each miss, open the cited OSHA section and read the paragraph around it.
- For load chart misses, write out the steps: pick the right row and column, apply the between-values note, subtract every deduction, then check the parts-of-line limit.
- Rework the set a week later. Option order on the real exam won't match this page, so make sure you know why each answer is right.
NCCCO practice test FAQ
How many questions are on the NCCCO Core exam?
95 multiple-choice questions in 90 minutes, with no calculator. You also take one 28-question Specialty exam (60 minutes, calculator permitted) for each crane type you want certified, plus a practical exam.
Is it NCCCO or CCO now?
Both names refer to the same certifying body. It now uses the name CCO, nccco.org redirects to ccocert.org, and the certification is the CCO Mobile Crane Operator certification. Many people and employers still say "NCCCO."
What score do you need to pass the CCO Core exam?
The Mobile Crane Operator candidate handbook doesn't list a passing percentage. CCO's own site and candidate FAQ say you get a preliminary result on screen and, if you don't pass, a strength-and-weakness report. Treat any exact cut score you see online with caution unless it links to a current CCO document.
Can I use a calculator on the Core exam?
No. The handbook marks the Core exam "calculator not permitted" and the Specialty exams "calculator permitted." Load chart math on the Core is kept simple enough to do by hand, which is how Questions 38 to 50 here are built.
Do I have to take the written exam before the practical?
No. CCO says you can pass the written and practical exams in either order. You have 12 months from the first exam you pass to pass the rest for that designation.
Are these real NCCCO exam questions?
No. Castleport Test Prep wrote every question here from public sources, mainly OSHA 29 CFR 1926 Subpart CC and CCO's candidate handbook. None are real, recalled or leaked exam items, and the practice load chart describes no real crane.
Does this cover rigger or signalperson certification?
No. This set targets the Mobile Crane Operator Core exam. CCO's Rigger and Signalperson programs have their own exams, though questions on signals and rigging hardware here overlap with them.
Sources
- CCO, Mobile Crane Operator Candidate Handbook (MCO CH rev. 01/25): Core and Specialty outlines and weights, question counts, time limits, calculator rules, eligibility, time frames, recertification, reference list.
- CCO, Mobile Crane Operator certification page: fees, current domain weights, testing options.
- CCO, Candidate FAQ: results, retakes, accommodations, certification issue time.
- CCO, Testing Overview and Policies: OPT, EOT and TCT testing modes; candidate attestation.
- CCO, Exam Reference Materials.
- OSHA, 29 CFR 1926 Subpart CC, Cranes and Derricks in Construction: 1926.1401, 1926.1402, 1926.1407, 1926.1408, 1926.1409, 1926.1411, 1926.1412, 1926.1413, 1926.1414, 1926.1415, 1926.1416, 1926.1417, 1926.1419, 1926.1420, 1926.1421, 1926.1423, 1926.1424, 1926.1425, 1926.1427, 1926.1431, Appendix C.
- OSHA, 29 CFR 1926.251 Rigging equipment for material handling.
- Manitowoc (Grove), RT640C Load Chart: example of real manufacturer chart notes.
Last verified: November 11, 2026. We checked exam format, fees, eligibility, time frames, results and recertification against CCO's candidate handbook, Mobile Crane Operator page and candidate FAQ, and every answer against the OSHA section or chart note cited with it.
By the Castleport Test Prep Editorial Team.
Castleport Test Prep is an independent exam prep publisher. We are not affiliated with, endorsed by, or approved by CCO (formerly the National Commission for the Certification of Crane Operators, NCCCO). NCCCO, CCO and other exam and credential names are used only to identify their subjects; trademarks belong to their respective owners. These practice questions and the practice load chart are original and unofficial, and the chart must never be used for a real lift.
No qualified crane safety reviewer of this version is documented.